Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.

Slides:



Advertisements
Similar presentations
Site Waste Management Plans and the Code
Advertisements

Carpentry Green Application 5. Key Lessons from Carpentry In Carpentry, we learned about: Tool and equipment use, safety, and maintenance Primary materials,
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 16 Other Supply Responsibilities.
Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being.
Environmental Protection Department 1 REDUCING CONSTRUCTION & DEMOLITION WASTE.
RG - OFFICER Eng.Essam Hegab Environmental Health and Safety Manager.
FHWA Sustainable Highways Self- Evaluation Tool Tracking Environmental Commitments Recycle and Reuse Materials Construction Equip. Emission Reduction Construction.
Construction and Demolition Waste Management at UVM
Re-use, recycling and future of demolished buildings in Russia Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko.
12 Inventory Management PowerPresentation® prepared by
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
GREEN CONCRETE. What is Green Concrete? A concrete that uses less energy in its production & produces less carbon dioxide than normal concrete is green.
WASTE AUDITING 101. What Direction Are You Going?
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Supply Chain Management
TRP Chapter Chapter 4.2 Waste minimisation.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Chapter 2: Role of Logistics in Supply Chains
Introduction The Institution Recycling Network 7 South State Street Concord, NH John Gundling, CWM Specialist.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Introduction to Logistics. “Ideal” Armed Forces of Mauryan Empire Infantry Cavalry (War) Elephants Chariots.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Construction and Demolition Waste Reduction Management and Practices University of Santo Tomas College of Architecture.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Waste Management in PDO Corporate Environmental Advisor
Division of Pollution Prevention and Environmental Assistance Industrial Assistance Section John Burke
Pollution Prevention and Minimization. Pollution Prevention Though an obvious concept, this has been one of the most difficult concepts to implement Congress.
Re-use, recyling and future of demolished buildings.
Deconstruction: A Local Government Model Wayne Fenton Orange County Public Works, Hillsborough, NC.
◦ (a) The prior period's closing balances have been correctly brought forward to the current period or, when appropriate, have been restated; and ◦ (b)
Green 200: The Science of Green Building. Course Goals Green principles in design and construction Innovative materials, systems, and construction methods.
© Dr. John T. Whiting All Rights Reserved Slide 1 The Rationale for Integrating IT Assets into the Strategic Business.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Reported By: Pierre Froilan A. Cua.  Life cycle analysis is the primary tool to analyze green buildings versus the traditional design, construction,
Green Recycling Network Toward a Greener Tomorrow... Today!
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
PLANNING AND SCHEDULING
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
MINISTRY OF ENVIRONMENT AND SPATIAL PLANNING. “Ministry of the Land and Sky” Overview of Responsibilities Protection of nature Protection of environment.
Training Case Studies John Burke
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Construction and Demolition Waste Management at UVM.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Sustainability Concepts. Life Cycle Costing – Cost at time of purchase is amortized over the life of the building. Example: A chair that costs $
AIR POLLUTION PREVENTION AND CONTROL
Chapter 16 Other Supply Responsibilities ©McGraw-Hill Education. All rights reserved.
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
Session 1: Initial Steps May 19, Why Don’t People Recycle???? Recycling? Who Cares! Recycling? Where Can I Recycle? Recycling? How am I Going to.
CEM CEM – 520 Measuring the Effectiveness of Materials Management for Industrial Construction Projects in Saudi Arabia Thesis By Ali Al-Darweesh.
12-1 Anup Kumar Saha The Expenditure Cycle: Purchasing and Cash Disbursements.
12.2 Solid Waste Options for the Future Mrs. Trimble Mrs. Perryman Mrs. Roth.
BUILDING MATERIALS APPLICATIONS OF TECHNOLOGY. WHAT FACTORS PLAY A ROLE IN ARCHITECT’S CHOSING MATERIALS?  Climate where building is constructed  Types.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
Recycling in the IVAR - region Sibiu, november 2009 Tron Ree, Chief engineer IVAR IKS.
Is it viable to recycle at Princeton?. What can be recycled? Construction Waste Carpet.
Chapter 7 Pages Supply chain management – the process of integrating and planning, implementing and controlling the systems of organisations,
Logistics. 英语班级: 08 级 1B6 专业:物流管理 组员: 温凯靖 王蒙露 叶雯雯 马昀 王晓 林.
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
Construction Debris Best Management Practices
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Pollution Prevention and Minimization
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
Bunker Project Schedule/Budget
Presentation transcript:

Material and Waste

Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project. Material cost control and profitability starts with a plan. Implementing it can save significant costs in materials. Successful plan relies on the skills of many professionals, from the architect and designers through project management to the trade contractors.

Materials management Pre-construction people involved Architect (design for best use of standard sizes, for multiple applications and their recyclability) Engineer (ensures appropriate structural component dimensions, quality and spacing for standard fastener and materials) Estimator (uses latest materials takeoff technologies and exercises accuracy in estimates) Purchaser (plan purchases and deliveries to reduce surplus and to balance materials maintenance during on-site storage versus transportation costs)

Materials Management Plan In this process we decide: How building is designed and how materials are estimated How materials are acquired, packed and transported on construction site How the delivery schedule is designed How contractors plan materials use and how they manage previously used materials and cuts How waste is managed for use elsewhere or recycling rather then being discarded in a landfill

Material Management plan Plan consists of procedures guiding all the professionals and trades involving in the entire process of the construction. It is two-phase plan : - design phase - construction phase With four sections : - Review - Reduce - Reuse - Recycle

Material Management plan

Review Reconsider design philosophies and practices. Review company’s policies regarding estimating and purchasing, and the construction site practices. Are they valid in today’s economy or procedures ? Reduce Reduce quantities purchased as well as waste. More care taken on the jobsite and different cleanup practices could dramatically reduce waste. Create list of waste-reducing practices Reuse Recycle

Material and Waste Construction Waste - Waste materials generated by construction activities, such as scrap, damaged or spoiled materials, temporary and expendable construction materials, and aids that are not included in the finished project, packaging materials, and waste generated by the workforce.

Construction Waste Division by types of work: Construction: 9% Renovation: 38% Demolition: 53%

Construction Waste Division by materials: Concrete and rubble: 40% to 50% Wood: 20% to 30% Drywall: 5% to 15% Asphalt roofing: 1% to 10% Metals, Bricks and Plastics: 1% to 5%

How to reduce quantity of wastes? Be efficient in area and volume. Try to use only that much material what is needed to accomplish project Where possible, select construction systems that do not require temporary support, or other materials that will be disposed of as debris during the project. Where possible, select materials that do not rely on adhesives, which create packaging waste. Furthermore, adhesives inhibit salvage and recycling at the end of the component's or building's life. Try to avoid materials which are sensitive to damage

How to reduce quantity of wastes? Perform multiple functions with one material rather than requiring multiple materials to perform one function Try to use standard material and product dimensions, without cutting, where it is not necessary Where possible, reduce requirements for applied finishes, laminates, coatings, adhesives, and the associated scrap, packaging, and waste

Steps to control quality and minimize the losses in materials General description of the site: included the name of the company, the name of the site manager, gross floor area, construction schedule, list of documents provided by the company Measurement of work completed Control of material deliveries and withdrawals before transporting: included the specifications and quantities of materials, based on documents provided by the company Measurement of inventories

Steps to control quality and minimize the losses in materials Control of material deliveries and withdrawals after transporting: included the date, specifications, and actual quantities of materials delivered or withdrawn Observation of material unloading, transportation, and storage conditions Observation of the production processes: included the preparation and use of materials Measurement of final dimensions of building components

Material and Waste

Cost of Waste Original cost of material +Delivery cost +Handling cost +Management cost +Cleanup cost +Waste hauling cost +Tipping fee =Total cost of construction waste

e%20in%20Building%20Industry_Main%20Causes%20and%20Preve ntion.pdf References