Distribution System Regulations, Operations and Challenges

Slides:



Advertisements
Similar presentations
IDEM Drinking Water Program Water Resources Study Committee.
Advertisements

Correctional Certification Subpart 1. Purpose: establish program certification requirements that govern facilities providing correctional program.
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Hayward Water System Public Health Goal Report Alex Ameri, Deputy Director of Public Works Utilities Division Department of Public Works.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
September 29-30, 2011 Drinking Water Program Sustained Compliance Workshop Lee Johnson, P.E
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Garfield County Temporary Employee Housing May 3 rd, 2007 Energy Advisory Board.
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
1 Utility Board Training: Technical Capacity. 2 Introduction Request for training identified Local utility boards Funders Regulators Cooperative training.
10 NYCRR5 Eric W. Wohlers, P.E. Environmental Health Director Christopher G. Crawford, Ph.D. Water Resources Specialist Cattaraugus County Environmental.
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
State of Ohio Class A Drinking Water Operator Certification Program This course includes content developed by the Ohio Environmental Protection Agency,
The City of North Bend Sanitary Sewer System
Coliform Event Recommendations and Best Management Practices Sammamish Plateau Water and Sewer District Workshop December 9th, 2014 Sammamish Plateau Water.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
PSC INSPECTION REPORT George W. Wakim, P.E.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
Massachusetts Department of Environmental Protection Drinking Water Program.
New KY Drinking Water Programs How They Affect Water System Management 2007 Water Personnel Training Seminar Provided by: KRWA and PSC Presented by: KY.
Monitoring Plan Template
Age of Potable Water Impacts on DBP’s and Disinfection Residuals.
The Stage 2 Disinfection By-Products Rule DoD/EPA State Conference Compliance Track DoD/EPA State Conference Compliance Track Atlanta, GA Atlanta, GA June.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
After the Sanitary Survey
Mississippi State Department of Health
Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities.
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Kentucky Implementation January 1 st, 2016.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
1 CTC 450 Review Water Processes. 2 Objectives Understand the basics with respect to operation of waterworks.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
COLIFORM SITE SAMPLING PLAN Gary Carlson Drinking Water Program U.S. EPA Region 8.
Boil Water Notices – Mandated vs. Precautionary Operating Board November 6, 2014.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
Page 1 Town of Williamston Water Rates. Page 2 Page 3 Major New Costs Incurred Due to MCRWASA Plant Coming On Line Extra staff time: $10,000 (estimated)
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
1 Public Hearing User Rate Adjustments April 8, 2008.
Nitrification Action Plans
Revised Total Coliform Rule (RTCR) Community Systems Rychel McKenzie Jason Pushard December 2015.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Not all changes will be discussed please view all regulations at
Level 2 Assessment. Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Level 1 Assessment. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Water System Infrastructure
Workshop developed by RCAP/AWWA and funded by the USEPA
Lecture (11): Water Distribution Systems
Total Coliform Rule (TCR)
Cross Connection Survey Training
DORSET Water System Information Meeting
Sample Siting Plans under the Revised Total Coliform Rule
Sample Site Plans.
PSC Water Training September , 2018
OHWARN Workshop Disruption of Service Rule Update
Dollars and Cents: Ways to Save and be More Resourceful
Presentation transcript:

Distribution System Regulations, Operations and Challenges KY Water and Wastewater Operators Association 57th Annual Conference Louisville, Kentucky

Drinking Water Distribution System “Distribution System” is not defined at the Federal or State level Public water system means a system for the provision to the public of water for human consumption through pipes or, after August 5, 1998, other constructed conveyances, if such system has at least fifteen service connections or regularly serves an average of at least twenty-five individuals daily at least 60 days out of the year. Such term includes: any collection, treatment, storage, and distribution facilities under control of the operator of such system and used primarily in connection with such system; KY distribution system sizes range from the “Big 3” to ones as small as a church or beauty shop

Staffing (401 KAR 8:030) Section 1(2) Staffing requirements.      (a) Water distribution systems. A water distribution system shall be operated by or under the supervision of a distribution system operator certified in a class equal to or higher than the class of the distribution system. (b) Combination water treatment plants and water distribution systems. 1. A combination water treatment plant or water distribution system shall be classified as Class IA-D, Class IB-D, IIB-D. 2. A system classified as a combination system in subparagraph 1. of this paragraph shall be operated by or under the supervision of an operator who holds a valid combination or separate water treatment and distribution system operator certificate of the appropriate class or higher and who shall be in direct responsible charge of the system. 3. A certified operator of a Class IA-D combination system shall be at the water treatment plant if water is being treated, unless the operator is performing other system-related duties.

Staffing (401 KAR 8:010) Section 1 (15) "Direct responsible charge" means personal, first hand responsibility to conduct or actively oversee and direct procedures and practices necessary to ensure that the drinking water treatment plant or distribution system is operated in accordance with accepted practices and with KRS 223 and 401 KAR Chapters 8 and 11.

System Infrastructure/Design (401 KAR 8:100) Even if an operator is not intimately involved in distribution system design—the design affects operation and maintenance 2007 Edition 10 States Standards KY General Design Criteria Infrastructure design can affect “concrete and steel” issues Hydraulics --Storage Pressure --Pipe material Accessibility --Water loss/leakage Breaks

System Infrastructure/Design (401 KAR 8:100) How a system is designed also affects water quality and eventually compliance/public health Accessibility Water age Storage Disinfectant residual maintenance Flushing Breaks

Pressure PSC Regulations 807 KAR 5:066. Water. Section 5. Pressures. In no event, however, shall the pressure at the customer's service pipe under normal conditions fall below thirty (30) psig nor shall the static pressure exceed 150 psig. 10 States Standards:  Distribution System Piping and Appurtenances 8.2.1 System Design/Pressure:  “The system shall be designed to maintain a minimum pressure of 20 psi at ground level at all points in the distribution system under all conditions of flow.  The normal working pressure in the distribution system should be approximately 60 to 80 psi”.

Pressure KY Design Criteria Distribution System Pressure Minimum system pressure for all conditions shall be 20 psi. b. Water lines should be hydraulically capable of a flow velocity of 2.5 ft/s while maintaining a pressure of at least 20 psi. c. When static pressure exceeds 150 psi, pressure reducing devices shall be provided on mains or as part of the meter setting on individual service lines in the distribution system. d. The normal working pressure in the distribution system at the service connection should be approximately 60-80 psi and shall not be less than 30 psi under peak demand flow conditions. Peak demand is defined as the maximum customer water usage rate, expressed in gallons per minute (gpm), in the pressure zone of interest during a 24 hour (diurnal) time period.

Residential Pressure Individual home booster pumps are not allowed or approved under 10 States Standards (Section 8.11.2) “Individual booster pumps shall not be allowed for any individual residential service from the public water system mains.”

Storage Balancing act between sufficient volume for demand, fire protection and regulations DOW and PSC have an “average 1 day production” volume for storage When does a system reach a point of “too much storage”? Why is more storage/larger storage needed? Issues with water age which leads to water quality problems (chlorine residuals, DBPs, tastes, bacteriological, nitrification) Target 72 hour full turnover Monitoring program (on-line instrumentation??) Storage can also occur in oversized mains with little demand

Water Main Breaks (401 KAR 8:150) Section 4. Disinfection of Treatment and Distribution System Facilities, New and Repaired Water Lines. (2) Line repairs due to breaks or ruptures. Key items Main break log required for all breaks DOW notification if Pressure in the area of the break falls below 20 psi or Each system needs to define “area of the break”—Have a plan The break takes longer than 8 hours to repair beginning when the system becomes aware of the break All breaks require bacteriological samples Not all breaks require BWAs

Flushing Distribution system flushing is “recommended” But a planned, correctly implemented program can prolong the life of a system and improve water quality Key words—”planned”, “correctly implemented” Can include “spot” flushing for isolated issues (customer inquiries) or for dead ends Should not be for achieving compliance (i.e., flushing DBP sites 2 days before sample collection) Coordinate with producer/purchasers

Water Loss/Water Audits There are no KY regulations on how to assess water loss or conduct water audits Water produced/purchased not sold or appropriately used is essentially lost revenue No system can afford to waste money and that is what happens when water usage is not known Tracking water loss is an eye-opening experience Have to know where the water is going before you can proceed Water loss does not equal leak detection Water loss is not a “one size (%) fits all” program Water loss is not solely the responsibility of the distribution operator

General Provisions (401 KAR 8:020) Broad general requirements for all PWSs Cross-connection control No by-pass without Cabinet approval Proper operation and maintenance of facilities Report and record-keeping Routine Emergency Advisories Maps (sample sites) O&M Manuals

General Provisions (401 KAR 8:020) Broad general requirements for all PWSs Flushing recommended No introduction of a “substance that may have a deleterious physiological effect” Use of certified labs Use of approved chemicals Proper disposal of chlorinated water Water loading stations

General Provisions Cross Connections “A cross-connection shall be prohibited” “Every public water system shall determine if or where a cross-connection exists and shall immediately eliminate it” It means you have to have a plan or process for the identification and then the correction Plan implies “written” (based on degree of hazard) Correction/elimination implies “authority to do so”

General Provisions Consumer (Boil Water) Advisories Notification of customers, DOW and the public health department 8:020 has direction on when to issue and how to notify DOW and the public heath agencies DOW has revised the BWA Guidance Manual

Regulatory (SDWA) Compliance Water quality compliance includes Total coliform rules (monthly) Disinfectant residual maintenance (daily/monthly) Lead and copper (every 3 years June-September) Disinfection by-products (quarterly/annually) Public notification (when required) CCRs (annually by July 1) Asbestos (1st 3 years of a 9 year cycle) MOR (monthly)

Regulatory (SDWA) Compliance Also includes such requirements as Lead Reduction in DW Act Effective January 4, 2014 Capacity Development Technical/managerial/financial stability Source water assessment Potential EPA regulation/requirements Tank maintenance rule

Regulatory (SDWA) Compliance Maintaining compliance means having Up to date sample sites and plans Up to date maps Standards (construction/instrumentation/material) SOPs Sampling, BWAs, notifications Valve exercise, hydrant inspections, tank maintenance Funding Rates, budgets, grants, loans Planning Short term, long-term

Customer Relations Who is your “customer”? Paying water users (residential and commercial) Wholesale purchasers or producers PWS staff and management Political management Regulatory agencies Fire departments Tariffs/ordinances, bills, contracts, bid documents Transparency Workable

Customer Relations Who is your “customer relations” staff? Front line staff typically is the meter reader or distribution crew

Drinking Water Program Coordinator/DOW Questions?? Comments?? Julie W. Roney Drinking Water Program Coordinator/DOW Julie.Roney@ky.gov 502/564-3410