1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 7 Remote Handling Concept Study for the Super-FRS Plug System Luis M. Orona D. Helmut.

Slides:



Advertisements
Similar presentations
AND ELEMENTS OF MACHINES
Advertisements

Mahmut Ali GÖKÇEIndustrial Systems Engineering Lecture 2 System Identification ISE102 Spring 2007.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Conceptual Graph Analysis Chapter 20 Lori Nuth | EDIT 730 | Fall 2005.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 11 Augmented Reality Platform for Advanced Maintenance in Scientific Facilities Héctor.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 1 Design models for the management of accelerator components and infrastructure development.
Welcome to Engineering Design What is engineering design, really? Function to form Design process Phases of design Product realization process Roles for.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
©TheMcGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 1 Introduction to Object-Oriented Programming and Software Development.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland A Macro-Micro Visual Servoing Controller for Mobile Manipulation Research Package(RP):
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Definition of an Industrial Robot
Plane Motion of Rigid Bodies: Forces and Accelerations
Introduction to Computer Aided Process Planning
The Rise of Robotics.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
LECTURE 1 What does a Business Analyst do? IFS 231 Business Analysis.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
Aero-structure Cost Estimation and Optimization Integrated KBE System Background This research focuses on thermoplastic aero-structure cost estimations,
High-Accuracy, Repeatable Wrist Interface
Collaborative planning and scheduling: towards an application of the ALARA principle in the intervention planning and scheduling phase. Mathieu Baudin,
Importance of PURESAFE for the FAIR facility Helmut Weick, GSI CERN Geneva, 19. Jan  Overview FAIR / Super-FRS  Radiation Areas  Robot Handling.
Ottó Bede TBM Consortium Meeting, Brasimone ITER PPE Goal Oriented training program RST meeting 17th January 2011, Cadarache, France József.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
3DCS Advanced Analyzer/Optimizer Module © Dimensional Control Systems Inc DCS Advanced Analyzer/Optimizer Equation Based Tolerance Analysis Quick.
1 Thomas HottTechnical Reviews Contents, 2 nd CDE-WS, 12 th & 13 th May 09 XFEL Technical Coordinator Technical Reviews – Contents – 1.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Fraunhofer Advisor: Dr. Michael Keefe Innovative Lifting.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Plane Motion of Rigid Bodies: Forces and Accelerations
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 9 Study of a logistic concept for Super-FRS RH components Faraz Amjad Helmut Weick.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Puresafe contributions to telerobotics WP2 and WP3 results Manuel Ferre Universidad Politécnica.
1/9 Session III-B Special Liquid Lithium Technology Session Summary C. H. Skinner, session chair Princeton Plasma Physics Laboratory 2 nd International.
A Goal Based Methodology for Developing Domain-Specific Ontological Frameworks Faezeh Ensan, Weichang Du Faculty of Computer Science, University of New.
FDT Foil no 1 On Methodology from Domain to System Descriptions by Rolv Bræk NTNU Workshop on Philosophy and Applicablitiy of Formal Languages Geneve 15.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Prepared By: Eng. Mostafa Elsayed Abdel Moniem Assistant Lecturer at Faculty of Engineering.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
AN INTEGRATED APPROACH TO ENGINEERING AND DESIGN School of Mechanical and Aeronautical Engineering (SMAE) Dr Linda Lee, Peter Lo and Lim Siew Kuan June.
1 Final Conference, 19 th – 23 rd January 2015 Cern, Switzerland PURESAFE Preventing hUman intervention for IncREased SAfety inFrastructures Emitting ionizing.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
The Design Process.
1 ME886.3 Topic 1: System and System Design (I). 2 What we design?
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
SHAPER, SLOTTER & PLANER SUBMITTED TO PROF. DEEPAK SHARMA SUBMITTED BY ANKIT SHARMA ME-I (III YEAR)
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
INCOSE IW12 MBSE Workshop 15 INCOSE (MBSE) Model Based System Engineering Integration and Verification Scenario Ron Williamson, PhD Raytheon
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Introduction to Computer Aided Process Planning
ASSEMBLY AND DISASSEMBLY: AN OVERVIEW AND FRAMEWORK FOR COOPERATION REQUIREMENT PLANNING WITH CONFLICT RESOLUTION in Journal of Intelligent and Robotic.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Writing a sound proposal
Simulation Analysis: Estimating Joint Loads
OVERVIEW Impact of Modelling and simulation in Mechatronics system
Unified Modeling Language
Direct Manipulator Kinematics
Unclear defined items in Regulation No.129
Engineering Processes
Engineering Processes
Dept. of Computation, UMIST
Presentation transcript:

1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 7 Remote Handling Concept Study for the Super-FRS Plug System Luis M. Orona D. Helmut Weick GSI Helmholtzzentrum Project: 02/12 – 01/15 A Systematic Approach to Define, Analyse and Develop Remote Handling Tasks in Radiation Areas

2 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Outline Background information Super-FRS target area remote handling Remote handling My research Summary

3 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Background Information Luis M. Orona D. Dr. Helmut Weick GSI Helmholtzzentrum - Germany Tampere Univeristy of Technology (TUT) - Finland Prof. Jouni Mattila

4 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Super-FRS

5 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Plug System

6 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Target Area prompt dose and activation dose L. M. Orona, et al. "Super-FRS Target Area Remote Handling: Scenario and Development." INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS 10 (2013).

7 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling concept for the Super-FRS plug system Super-FRS plug system: Remote handling concept:

8 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland

9 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Hot cell and storage cell conceptual design

10 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Inside the Hot cell

11 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland About Remote Handling (RH)

12 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling (RH) Place A Place B Remotely controlled master-slave manipulator Remote handling is about handle (move) objects from one place to another and perform different activities on either places like: fixing, cutting, welding, actuating among others, by means of remotely controlled handling devices (e.g. manipulator arms).

13 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland My research work How to conduct a remote handling study?

14 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland How to conduct the remote handling concept study? Given that the Super-FRS plug system comprises many different components and several RH tasks can be identified and therefore must be analyzed. The proposed approach is to define a framework to systematically define, analyze and develop RH tasks.

15 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Research Goals: To develop a framework to systematically define, analyze and develop remote handling maintenance tasks. To provide groundwork to formalize remote handling beyond good practices and design guidelines into a more analytical approach. To increase the understanding about remote handling due to ionizing radiation environments. To generate in deep knowledge for the design and development of the Super-FRS target area plug system with respect to remote handling. Research Goals and Results

16 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Research Goals and Results Research Methodology: Under the hypothesis that by combining the fields of process planning for assembly and disassembly, systems engineering and engineering design a framework can be formulated that both; represents remote handling as an input/output model and can be used to systematically define, analyze and develop remote handling maintenance tasks.

17 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland System(s) requiring remote handling Remote handling system Remote handling analyses openSE Lifecycle

18 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Results: the proposed framework From the design and development phase of the facility To the design and development phase of the facility

19 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland The proposed framework Replace the horizontal shaft assembly

20 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland The proposed framework Replace the horizontal shaft assembly

21 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Product Analysis 1 Consist of developing five assembly models to define and describe the product

22 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Product Analysis Product definition: 4: Vertical shaft assembly 2: Horizontal shaft assembly 1: Target wheel 3: On top devices 0: Plug main body ID NumberNameRef. NameType 0Target PlugTaPlMain subassembly 1Target wheelTaWhSubassembly 2Horizontal shaftHoShSubassembly 3On top devicesToDeCollection of components 4Vertical shaftVeShSubassembly

23 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland KCS 1-2 KCS KCS 4-0 Product Analysis Product description: 3-4 4: Vertical shaft assembly 2: Horizontal shaft assembly 1: Target wheel 3: On top devices 0: Plug main body Liaison diagram

24 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Assembly-disassembly diagram / 1 0 / 1, 2, 3, / / 3, / 1, / 1, 3, 40-4 / 1, 2, / 1, 2 Disassembly Assembly Product Analysis Product description:

25 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland LocateGuideFitLock KCS 1-2 Kind of cylindrical Cylindrical Ball mechanism KCS 2-0 Two kind of cylindrical Two cylindrical Cylindrical and Surface 4 bolts KCS 4-0 Kind of cylindrical Cylindrical Plate with bolts (manual) Hands on The connection between components is defined as a kinematic constraint sequence (KCS) comprising 4 stages: locate, guide, fit and lock. Product Analysis Product description:

26 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Each stage of the KCS has one or more kinematic constraints which are modeled with a constraint matrix (Schluss-Matrix) [Roth] Z Y X Product Analysis Product description:

27 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Z Y X 0 - no constrained 1 - constrained >1 - over constrained Guide (cylindrical) Fit (Plane) Example: KCSV= + = Guide Fit Product Analysis Product description:

28 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Kinematic Constraint Sequence (KCS) Kinematic constraint sequence value for the assembly of component 1 into 2 Constraint matrix for the i th kinematic constraint in the locate stage for the assembly of component 1 into 2. The same nomenclature applies for the rest of constraint matrices in the equation. IfIf respectively are active at the end of the KCS Otherwise Amount of KCs in the locate, guide, fit and lock stages respectively L. M. Orona, et al. “A Systematic Approach for Modeling and Analyzing Mechanical Assemblies That Require Remote Handling." The 2 nd Annual International Conference on Mechanical Manufacturing, Modeling and Material. Jan 2015 Shanghai, China.

29 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland The proposed framework Replace the horizontal shaft assembly

30 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Definition Example: Exchange of horizontal shaft assembly 4: Vertical shaft assembly 2: Horizontal shaft assembly 1: Target wheel 3: On top devices 0: Plug main body

31 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland To disassembly the target wheel, a tool is necessary to deactivating the locking mechanism ID NumberNameRef. NameType 5Tool for targetTL_1Tool Remote Handling Task Definition Example:

32 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland SA1 SA3 SA / 1-5 / 2* / 1-5, 2 / 2* / 1-5, 2, 2* / SA = Set of activities Target PlugWorking areaHot cell drawer /5/2*2* SA5 0-2*-3-4 / 1-5, 2 / SA6 0-2* / 2 / SA *-3-4 / 2, 5 / SA / / 2* Remote Handling Task Definition (RHTD) diagram

33 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland The proposed framework Replace the horizontal shaft assembly

34 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Analyses 14 states/actions to be analyzed for each set of activities defined in the RHTD diagram: In assembly: Place 1: Fixture, the floor, hot cell drawer, etc. Place 2: The product (the machine) In disassembly: Place 1: The product (the machine) Place 2: Fixture, the floor, hot cell drawer, etc.

35 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland SA / 1-5 / 2* / 1-5, 2 / 2* Disassembling the horizontal shaft Remote Handling Task Analyses Example:

36 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Analyses for set of activity 3 (SA3) Remote Handling Task Analyses Example:

37 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Analyses Example:

38 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Analyses Example:

39 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Analyses Example:

40 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Analyses Example:

41 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Remote Handling Task Analyses: Simulations with V-REP

42 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland The proposed framework Replace the horizontal shaft assembly

43 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Design and Development Example: Requirements Conceptual Design Verification, validation and integration Detailed Design Tool concepts Design and development waterfall approach TL_1_R-1The tool shall be manipulated by the MT200 manipulator TL_1_R-2The tool shall be attachable and detachable from the target wheel TL_1_R-3The subassembly created by the tool and the target wheel shall be manipulated by the MT200 manipulator TL_1_R-4The tool shall improve the manipulability of the target wheel TL_1_R-5… Requirements

44 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Diameter of the target ≈ 600 mm Design and Development Example:

45 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Summary Remote handling is required in particle accelerator facilities to conduct maintenance. Remote handling is necessary when working environments are inaccessible to humans. There is not a unified definition of remote handling. A framework to define, analyse and develop remote RH maintenance tasks has been proposed It is assumed that the proposed framework will increase our understanding about remote handling. Developing RH capabilities, is a complex and time consuming job.

46 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Merci! Questions and comments