National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Opening Meeting 2009 Palm Beach County NPDES MS4 Year 6 Audit.

Slides:



Advertisements
Similar presentations
Why Lab. Certification? Laboratory certification tries to insure that the laboratory is qualified and capable of analyzing the sample and obtaining quality.
Advertisements

Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Tips to a Successful Monitoring Visit
Course Content Purpose of the Form I-9 Purpose of the Form I-9 Introduction to the Form I-9 Introduction to the Form I-9 Form I-9, Section 1 Form I-9,
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
The State of Ohio is an Equal Opportunity Employer and Provider of ADA Services. Office of Community Assistance, Home Weatherization Assistance Program.
FIRST THINGS FIRST Check employee’s portion of the CA-1. Be sure the date in item 11 on the CA-1 is the date the employee actually hands you the CA-1.
Evaluations: Administrative & Classified Employees
Oklahoma Department of Corrections Successful Completion of the Personal Data Summary Sheet (Form OPM-4B)
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Oklahoma Department of Corrections Successful Completion of the Personal Data Summary Sheet (Form HCM-4B)
MS4 Opening Meeting 2007 Palm Beach County MS4 Year 4 Audit.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
What is it and what can it do for me?
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
SMARTS Training definitions CGP transition plan Pilot project discussion SMARTS Manual review 1.
Notice of Compliance Audit
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
First 5 LA Invoicing & Budget Modification Workshop OHCD Contractors FY
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Mercury Reduction Plan (MRP) Big Rapids Ordinance NO Chapter 53, Title 5, Section (B) Mercury Reduction Plans.
City of Puyallup Planning Commission Presentation February 8, 2012.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
School Budget (Draft)
Charter School 2015 Annual Finance Seminar Grant Management Office of Grants Fiscal September 11, 2015.
© 2009 The McGraw-Hill Companies, Inc. All rights reserved. 1 McGraw-Hill Chapter 2 The HIPAA Privacy Standards HIPAA for Allied Health Careers.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Purpose of Stormwater Pollution Prevention Plans (SWP3s) for Industries Richard Smith Resource Management Conference Tulsa Garden Center March 26, 2015.
Automated Statement of Accounts Project and Operational Guideline March 2011.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
VI. Developing a VSMP Program General Stormwater Training Workshop.
HIPAA PRACTICAL APPLICATION WORKSHOP Orientation Module 1B Anderson Health Information Systems, Inc.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Monitoring and 638 Contract Close-out. Contract Monitoring and Close-out After Award ▫ Meet with Tribe to discuss the Agreement  Include Monitoring Plan.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Rhonda Anderson, RHIA, President  …is a PROCESS, not a PROJECT 2.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Indiana Regional Sewer District Association October 26, 2015.
MS4 Opening Meeting 2008 Palm Beach County MS4 Year 5 Audit.
Overview of 3 rd Party Inspection Program for USTs.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
PH - (405) Fax - (405) Municipal Separate Storm Sewer System (MS4) Audits: The Oklahoma Experience Carrie Evenson, Ph.D., P.E. Oklahoma.
SAISD FEDERAL PROGRAMS DEPARTMENT Parent Involvement End of Year Closeout & Preparation for
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
TPDES Construction Management at the City of Laredo
Summit County MS4.
Single Event Violations
FY19 Federal Grant Monitoring: Titles I, II, IV
Multi-Sector General Permit: MSGP
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Opening Meeting 2009 Palm Beach County NPDES MS4 Year 6 Audit

DEP & SAIC Points of Contact SAIC MS4 Inspector: Robert van den Akker SAIC Science Drive Orlando, FL Ph: (407) Fax: (407) DEP Contact: Steven M. Kelly Program Administrator Ph: (850) Edward C. Smith MS4 Coordinator Ph: (850)

Year 6 Audit Schedule DateTimePermitteeLocation 6/8 8:30 – 12:00Town of Palm Beach Shores 247 Edwards Lane Palm Beach Shores 1:00 – 4:30 Town of Jupiter Inlet Colony 1 Colony Road Jupiter Inlet Colony 6/9 8:30 – 12:00ITID st Street North West Palm Beach 1:00 – 4:30City of Belle Glade 2050 West Canal Street South Belle Glade 6/10 9:00 – 11:00All Permittees EOC Jupiter 1:00 – 4:30SIRWCD Jupiter Farms Jupiter 6/11. 8:30 – 12:00Town of Haverhill 4585 Charlotte Street Haverhill 1:00 – 4:30Town of South Palm Beach 3577 South Ocean Blvd. South Palm Beach 6/128:00 –12:00Palm Beach County 2300 North Jog Road West Palm Beach

Annual Permit Assessment Process Submit: Annual Report Receive: Audit Notification *and AR Comments* Letter **Possibly Submit: AR Comment Response **Possibly Provide for Review: Audit Materials (records & ordinances) Audit: Record Review/Site Visits **Possibly Receive: Audit RAI Letter **Possibly Submit: Audit RAI Response Receive: Year 3 Permit Assessment Letter **Possibly Submit: Permit Assessment Response **Possibly Receive: Addendum to Permit Assessment Letter

Audit: Opening Meeting  AR Comments Inspector’s AR comments...some in addition to DEP’s Inspector’s AR comments...some in addition to DEP’s Any questions on DEP’s AR Comments Any questions on DEP’s AR Comments Submittal of response Submittal of response  EMCs to be submitted with Year 3 AR  Permit reapplication to be submitted with Year 4 AR  General questions?

SECTION VII. STORMWATER MANAGEMENT PROGRAM (SWMP) SUMMARY TABLE A.B.C.D.E.F. Permit Citation/SWMP Element Permit Requirement/Quantifiable SWMP Activity Number of Activities Performed Documentation/ Record Entity Performing the Activity Comments Part III.A.1Structural Controls and Stormwater Collection Systems Operation Channel control structure inspections Channel control structure maintenance Swale/ditch inspections (miles) Swale/ditch maintenance (miles) Inlet/catch basin/grate inspections Inlet/catch basin/grate maintenance Part III.A.2Areas of New Development and Significant Redevelopment Annual Report (reference)

Audit: Records Reviews  The records reviews focus on correlating the data reported in the AR in Column C with the permittee’s documentation/records reported in Column D for each reporting item.  When a large number is reported, need to see at least a sample of the record reported.  Provide records from the reporting year only.  The implementation of any non-reportable requirements, such as legal authority, policies, procedures, will also be reviewed.  Site visits will be conducted as time allows.

Audit: Satisfactory Records  Must have a record/documentation for every value reported in Column C. Just like taxes...you need receipts for those deductions! Just like taxes...you need receipts for those deductions!  Can estimate values for certain reporting items but still need to document how the estimate was arrived at.  The record must be an actual record documenting the value reported. A copy of the Construction Activities brochure does not document that 75 of them were distributed. A copy of the Construction Activities brochure does not document that 75 of them were distributed.  The record must clearly reflect the reporting item was accomplished. A list of construction projects does not demonstrate that pre- construction reviews for E&S controls were performed for them. A list of construction projects does not demonstrate that pre- construction reviews for E&S controls were performed for them.

Audit: Special Notes  Inspectors may change from year to year  The program is evolving – it is not static  Purpose of the annual report review and audit is for DEP to get an in-depth view of how well the permit requirements are being implemented  The annual report is also for: Your benefit for next year’s report Your benefit for next year’s report Analysis of yearly MS4 activities Analysis of yearly MS4 activities

AR: Most Common Reporting Errors  Not explaining why reporting “0” activities in Column C for: Pro-active illicit discharge inspections Pro-active illicit discharge inspections Training (illicits, spills, construction) Training (illicits, spills, construction) Inspections (MS4, muni. facilities, constr. sites) Inspections (MS4, muni. facilities, constr. sites) Pesticide/herbicide certifications (if report “0” for both personnel & contractors) Pesticide/herbicide certifications (if report “0” for both personnel & contractors)  Leaving gaps in Column D or Column E when reported a value in Column C  Not reporting an actual document name, or the correct document name, in Column D

AR: Section VII, Column C*  Only numbers or a frequency (if specified in the reporting item) are to be inserted here.  Do not leave Column C blank or insert “N/A” if no activities, rather insert a “0” and explain why the lack of data.  Only report a value in Column C if have a record to support it. If no record, need to report “0.”  Place any notes/comments regarding the reported values in Column F.

AR: Section VII, Column D*  Be as specific as possible about the actual title of the record/document.  Avoid generic terms such as: Log, spreadsheet, folder, file, checklist, report, Log, spreadsheet, folder, file, checklist, report, Paper records, electronic file, Excel, database Paper records, electronic file, Excel, database Public Works files Public Works files  Avoid the name of an entity such as: Streets Dept. Streets Dept. Bob Green Bob Green Volunteers Volunteers

AR: Section VII, Column D (cont.)* Indicate the full title and type of the record from which the values in Column C were obtained: Commercial/Residential Construction Site Inspection Checklists Commercial/Residential Construction Site Inspection Checklists Green Turf Monthly Invoices Green Turf Monthly Invoices JMC Services, Inc. Invoices (2/3/06, 6/10/06) JMC Services, Inc. Invoices (2/3/06, 6/10/06) to Bob Green, Public Works Director, from Jane Smith, WAVE, on 8/6/06 to Bob Green, Public Works Director, from Jane Smith, WAVE, on 8/6/06 Streets Division Monthly Summary Reports – Activities #60 and #61 (or name the line items) Streets Division Monthly Summary Reports – Activities #60 and #61 (or name the line items) Smirnoff Database – Search Code 112 Smirnoff Database – Search Code 112 Daily Work Orders – SW Codes 4, 5, and 9 Daily Work Orders – SW Codes 4, 5, and 9 Illicit Discharge Training Sign-in Sheet (6/12/06) Illicit Discharge Training Sign-in Sheet (6/12/06) DEP Qualified Stormwater Management Inspector Certifications DEP Qualified Stormwater Management Inspector Certifications

AR: Section VII, Column E*  Be as specific as possible. Include the department name as well as the particular division, and even the responsible person’s position title. Include the department name as well as the particular division, and even the responsible person’s position title.  If more than one entity conducts the activities under a single permit requirement, such as the municipality and the county, list both with detail – do not simply state “Broward County” as the other entity. Also, include the POC for that entity.  Be sure to include the name of any contractors hired to perform an activity.

AR: Section VII, Column F*  Reasons for permit requirements not completed  Reasons for variances from normal activities  Notes/comments regarding the entities performing the activities  Listing of names of certified/trained staff (if short list)  Indicate if number in Column C is an estimate and how it was arrived at  Provide information on any additional activities not recorded (so can’t be reported in Column C)

Attachments to Year X Annual Report  Every Year: Monitoring Program data summary  Year 1: An inventory of all known major outfalls per Rule (2)(a), F.A.C.

AR: Signatory Requirement  Rule (4), F.A.C.  Any person signing a document under subsection (1) or (2) of this section shall make the following certification:  “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”

Permit Reapplication: Next Steps  Permit will not be reissued by expiration date of Current permit is automatically be administratively continued until it is reissued. Current permit is automatically be administratively continued until it is reissued. Have no set schedule for when permit will be reissued. Have no set schedule for when permit will be reissued.  3 official versions: Draft → Intent to Issue → Final  Public notice required of: Draft & Intent to Issue  Facility Decision Schedule will be the first item you receive.

SAMPLE FACILITY DECISION SCHEDULE Process Elements Projected Date of Completion Permit Application received (is complete)1/1/07 Effective Date of Permit Application (date of Decision Schedule Letter)1/7/07 Draft Permit/Fact Sheet to Applicant and EPA1/14/07 (A) Applicant to Publish Public Notice of Draft Permit (no later than)2/14/07 (B) Applicant to Provide Proof of Publication of Draft Permit Notice (no later than)3/1/07 (C) Public Comment Period Ends (no later than)3/16/07 (D) Intent to Issue (ITI) Permit/Fact Sheet to Applicant and EPA4/15/07 (E) Applicant to Publish Public Notice of ITI Permit (no later than)5/15/07 (F) Applicant to Provide Proof of Publication of ITI Permit Notice (no later than)5/23/07 (G) Public Petition Period Ends (no later than)5/30/07 (H) Final Permit to Applicant and EPA6/30/07 (I) USE THE FOLLOWING GUIDANCE TO FILL IN THE SCHEDULE: A. Draft Permit/ Fact Sheet to Applicant and EPA (Date 0)* B. Applicant to Publish Public Notice of Draft Permit (A + 30 days) C. Applicant to Provide Proof of Publication of Draft Permit Notice (B + 14 days) D. Public Comment Period Ends (B + 30 days) E. Intent to Issue (ITI) Permit/Fact Sheet to Applicant and EPA (D + 30 days) * F. Applicant to Publish Public Notice of ITI Permit (E + 30 days) G. Applicant to Provide Proof of Publication of ITI Permit Notice (F + 7 days) H. Public Petition Period Ends (F + 14 days) I. Issue Final Permit (F + 30 days)* * These are estimated dates that are not based on the administrative timelines for permitting.

Future Reporting: Reporting Periods  Year 7: 10/01/08-9/30/09, due 4/1/10.  Possible Year 8: 10/01/10-9/30/11, due 4/1/12. If the full 12-month period for Year 6 is completed before the permit is reissued, will need to submit a Year 6 AR. Otherwise, Year 6 is not reported on. If the full 12-month period for Year 6 is completed before the permit is reissued, will need to submit a Year 6 AR. Otherwise, Year 6 is not reported on.  Year 1: Date of reissuance – 1 year from date of reissuance, due 6 months later. Will be this 12-month period even if have unreported time between Year 5 or 6 and Year 1. Will be this 12-month period even if have unreported time between Year 5 or 6 and Year 1.

Future Reporting: Tailored AR Form  Revised Tailored MS4 AR Forms will be provided to the permittees after the permit is reissued.  The revised forms will include all of the reporting items prescribed in Part III.A of the permit.  There will not be individual meetings with each permittee to review & tailor their revised form.  Each permittee will need to further tailor their form themselves per DEP’s instructions in the form.

DEP & SAIC Points of Contact SAIC MS4 Inspector: Robert van den Akker SAIC Science Drive Orlando, FL Ph: (407) Fax: (407) DEP Contact: Steven M. Kelly Program Administrator Ph: (850) Edward C. Smith MS4 Coordinator Ph: (850)