Presenter: Karen Fligger, EPA. Stormwater Generated by runoff from land and impervious surfaces such as paved streets, parking lots, and building rooftops.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

SW101 Municipal Separate Storm Sewer Systems (MS4s)
Presenter: Karen Fligger, US EPA. Decentralized Wastewater Treatment Managed onsite or cluster wastewater systems used to collect, treat, and disperse.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Update on Stormwater Regulation
Presenter: Karen Fligger, EPA HQ 1. Session Overview 1) Introduction to CWNS 2) Needs Definitions and Categories 3) Needs Elgibility 4) SRF Eligibility.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Storm Water Retrofitting Dan Bogoevski, Ohio EPA September 2011.
Presenter: Karen Fligger, EPA. What is a Small Community? Total Present Resident Population fewer than 10,000 persons 2 Total Resident Population present.
Presenter: Karen Fligger, EPA HQ 1. Session Overview CWNS 2012 Documentation Criteria Recap Pre-Approved Document Types Innovative Needs and Costs Documentation.
Design for Water Quality CE 365K Hydraulic Engineering Design Spring 2015 David R. Maidment.
By Sacha Mkheidze & Aaron Hebert
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Clean Watersheds Needs Survey (CWNS) 101 June 15th, 2010 Webcast Training.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
MDOT Storm Water Management Plan Module 2: Best Management Practices
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Training Approach and Expectations 2/6/20161 Training Approach and What to Expect.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Water and Wastewater Infrastructure Project Financing 1.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
City of Clarksville Storm Water Management Manual Revisions 2014.
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Summit County MS4.
Total Maximum Daily Load Program
Sacramento County Stormwater Quality Program
John Tinger U.S. EPA Region IX
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Presentation transcript:

Presenter: Karen Fligger, EPA

Stormwater Generated by runoff from land and impervious surfaces such as paved streets, parking lots, and building rooftops during precipitation events Often contain pollutants in quantities that could adversely affect receiving water quality 3

Stormwater (contd.) Most stormwater discharges are considered point sources and require coverage by an NPDES permit. The most commonly used method to control stormwater is through best management practices (BMPs), including pollution prevention and source reduction (quantity and quality control). 4

What is an MS4? A municipal separate storm sewer system (MS4) is a conveyance or system of conveyances owned by a state, city, town, or other public entity that discharges to waters of the U.S. and is: designed or used for collecting or conveying stormwater not a combined sewer not part of a Publicly Owned Treatment Works (POTW) 5

This is an MS4! 6

Phase I Coverage Covers municipalities with populations over 100,000 Many interconnected small MS4s also permitted Approximately 275 permits covering 1,000 MS4s have been issued 7

Phase II Coverage Covers more than 5,000 smaller MS4s in “urbanized areas” Urbanized areas based on decennial census Permitting authorities can designate additional small MS4s that are outside of urbanized areas Includes non-traditional MS4s (e.g. prisons, universities) Most states have small MS4 general permits in place; municipalities seek coverage under the general permit. 8

Urbanized Areas (UA) in U.S UAs 6,000  communities 197 million people 70% of the population 2% of the land area

Unregulated MS4s Outside urbanized areas (UAs) Generally population of 99,000 or less Not designated by the permitting authority (state or EPA) as Phase I or Phase II 10

Stormwater Facilities/Projects 11

Changes for 2012 Drop down box has been added to identify whether or not the needed projects activities are specifically required by a NPDES permit Data provided in comment box in 2008 was used to populate this field 12

CWNS Stormwater Facility Types Phase I Municipal Separate Storm Sewer System (MS4) Phase I permits are required for municipalities in incorporated places or counties with populations of 100,000 or more. Unit processes or BMPs designed to collect, treat, and transport stormwater for entities regulated under the NPDES Phase I permit process. Only processes or practices that address water quality or public health problems are included in the CWNS. 13

CWNS Stormwater Facility Types (contd.) Phase II MS4 Phase II permits were required for small MS4s (population 99,999 or less) located in “urbanized areas” (UAs) as defined by the Bureau of the Census, and those small MS4s located outside of a UA that are designated by NPDES permitting authorities. Unit processes or BMPs designed to collect, treat, and transport stormwater for entities regulated under the NPDES Phase II permit process. Only processes or practices that address water quality or public health problems are included in the CWNS. 14

CWNS Stormwater Facility Types (contd.) Non-traditional MS4 Unit processes or BMPs designed to collect, treat, and transport stormwater for regulated MS4s owned by non- municipal, public entities (e.g., universities, Departments of Transportation, prisons, school districts). Only processes or practices that address water quality or public health problems are included in the CWNS. 15

CWNS Stormwater Facility Types (contd.) Unregulated Community Unit processes or BMPs designed to collect, treat, and transport stormwater for areas not covered by an NPDES permit under the Phase I or Phase II storm water regulations. This is equivalent to “NPS Control: Urban” from the 2000 and 2004 surveys 16

Required Technical Data Facility/Project Information Permits (i.e. NPDES number) (except Unregulated Communities) Point of Contact Location (e.g. address, coordinates) Needs and Documentation* Discharge Method and Location* Pollution Problem* Impaired Waters* Unit Process* Utility Management* * Designates optional data 17

Cost Categories of Stormwater Needs for CWNS VI-A: Stormwater Conveyance Infrastructure Pipes, inlets, road side ditches VI-B: Stormwater Treatment Systems Wet ponds, dry ponds, manufactured devices VI-C: Green Infrastructure/Low Impact Development (LID) Bioretention, constructed wetlands, permeable pavement, rain gardens, green roofs, rain barrels, vegetated swales, restoring riparian buffers, etc. VI-D: General Stormwater Management Education program start-up costs, GIS systems, tracking systems, education, equipment (street sweepers), management plan development 18

When is a need NPS v. Unregulated Stormwater? NPS-Hydromodification (VII-K) BMPs to solve morphological problems, in many cases caused by stormwater Any work involving riparian or wetland restoration. Projects are usually on the stream channel or next to it. Examples: wetland development or restoration, bank or channel (grade) stabilization. Unregulated Stormwater (VI) BMPs to prevent, control, or treat pollution from stormwater. Projects are usually close to the source of pollution. Projects are part of a stormwater management plan. Examples: detention ponds, green roofs 19

Stormwater type?  Phase I  Phase II  Non-traditional  Unregulated Needs by sub-categories Cost Specifically required by NPDES permit? A - Traditional Conveyance $  Yes  No B - Traditional Treatment $  Yes  No C - Green Infrastructure/ LID $  Yes  No D - General Stormwater Management $  Yes  No 20

Collecting and Entering Stormwater Costs 21

Eligibility To be eligible for CWNS, needs must be: Capital costs Fall within CWNS categories Meet CWNS documentation criteria 22

Seven Criteria for Documenting Needs and Costs Description of the water quality or public health problem Location of the problem Solution to the problem Cost of the solution Basis for the cost Total cost Current Documentation 23 Needs Costs

1. Description of the water quality or public health problem Municipal Stormwater Management Plan Impaired Water/TMDL Listing Completed TMDL State-approved Area-wide or Regional Basin Plan Watershed-based plans CWSRF and other loan & grant applications Intended Use Plan Capital Improvement Plans (CIPs) 24

2. Location of the problem Provide a polygon outlining the area where the stormwater needs are located or If the stormwater plan is municipality-wide, select the appropriate town(s) from the provided list (based on primary county) For category VI-B only: a single point 25

3. Solution(s) to the problem Traditional Conveyance Pipes, inlets, road side ditches Traditional Treatment Wet ponds, dry ponds, manufactured devices Green Infrastructure/ LID Bioretention, constructed wetlands, permeable pavement, rain gardens, etc General Stormwater Management Planning, GIS systems, tracking systems, education, equipment (street sweepers) 26

3. Solution(s) to the problem Menu of BMPs Provides factsheets illustrating ways municipalities can meet six minimum control measures Hundreds of fact sheets covering: Public outreach Public participation Illicit Discharge Construction Post-construction Municipal operations 27

4. The cost for each solution The cost to implement the BMPs Cannot include O & M costs in documented needs 28

5. The basis of the cost The source of the cost data. 29

DOCUMENT TYPE DOCUMENT NAME PERCENT OF TOTAL 2004 STORMWATER NEEDS PERCENT OF TOTAL 2008 STORMWATER NEEDS 99EPA-HQ Approved45 % 20Capital Improvement Plan (CIP) 74% 27% 06 State-Approved Area-wide or Regional Basin Plan 5% 16% 08Total Maximum Daily Load (TMDL)3% 32CSO Long-Term Control Plan (LTCP)2% 60 Municipal Storm Water Management Plan 5% 2% 01Intended Use Plan 1% 40Watershed Management Plans1% 21Facility Plan 12% 1% 03CWSRF Loan Applications 2% 0.5% 23Final Engineer's Estimate 1% 0.2% 30

Costs from Comparable Practices (Doc Type 05) Cost must be based on at least 3 bid or completed projects that are: Recent: within the last two years. Similar in size, scope, and geographic area. Size: plus or minus 25 percent. Generally in the same county or watershed. Must be pre-approved by EPA headquarters 31

6. The total cost The total cost of all stormwater needs documented for the facility must be provided. 32

7. Current Documentation >$30 Million: January 1, <$30 Million: January 1,

Minnesota Innovative Methods from 2008 Minnesota established a per-acre stormwater rate according to the responses to their Stormwater Infrastructure Needs Survey (SWINS) 32 (of 209) communities provided cost estimates for future stormwater infrastructure needs Developed average annual per acre rate for stormwater management Applied to the all MS4 communities 35

Ohio Innovative Methods from Ohio conducted a survey of all the MS4s in the state Included cover letter to convey importance of submitting information Historically, stormwater needs have been an underreported category. While there are more than 260 municipal stormwater permittees in Ohio, stormwater infrastructure projects accounted for less than 1/10th of one percent of all reported needs in Ohio in This year, in an attempt to highlight its importance, stormwater needs are being surveyed independent of wastewater, which will be surveyed soon. If you are planning future stormwater projects, such as installing or repairing pipes and inlets; building wet ponds, bioretention areas, or swales; or purchasing equipment such as street sweepers and GIS systems, you should report these capital needs in the 2008 Needs Survey. Used it to request information on projects and to gather documents

Ohio Innovative Methods from

Ohio Innovative Methods from

Lessons Learned in 2008 Learn from the past Communication is key Between state agencies Between state and local agencies Between states and EPA Contact EPA as you are developing your methodology for pre-approval. The sooner the better Deadline is March 30,

Stormwater Resources & Tools EPA Stormwater Website ( Menu of Best Management Practices (BMPs) Measurable Goals Guidance Urbanized Area Maps Outreach Materials (Stormwater Month) 40