GIQAR - Marzo 20051 VESMS Validated Electronic Spreadsheets Management System Marino Gobetti Information Communication Technology QA Nerviano Medical Sciences.

Slides:



Advertisements
Similar presentations
Use of RtReports in the Pharmaceutical Environment
Advertisements

Is your company drowning in a sea of documents and regulations ? Quality Systems Integrators presents... TMSWeb Quality Management Compliance System.
User requirements of a comprehensive ENVIRONMENTAL MONITORING software system Susan B. Cleary.
1 Improving Customer Service Through Electronic Data Management & Paperless Data Delivery ~~~~~ The USEPA Region 2 Experience Linda M. Mauel Chief, Hazardous.
SLIDE 1 Westbrook Technologies from Fortis: A Healthcare Solution for Medical Records, Billing and HIPAA.
6000 Series Recorders. The Best Paperless Graphic Recorder in the World.
With Microsoft Excel 2007 Comprehensive 1e© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Excel 2007 Comprehensive.
EDRN’s Validation Study Information Management System Developed for EDRN by the DMCC Cancer Biomarkers Group Division of Cancer Prevention Jet Propulsion.
 DGIS Portal Company Communication Portal  DGIS DocsShipping Document Manager  DGIS Forms Shipping Paper Software  DGIS RegsRegulatory Publications.
Presented by: Virginia Hendricks Information Audit.
Document Solutions Document Solutions Confidential Property of FileMark Corporation Document Solutions Document Solutions October 2009 Document Submission.
Cheryl McCarthy Manager, Quality Assurance MBC Session October 3, 2008 GCP Compliance in our Vendors.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
Chapter 3: System design. System design Creating system components Three primary components – designing data structure and content – create software –
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Chapter 7 Database Auditing Models
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
Industry Coalition on 21 CFR Part 11 Recommendations for Achieving Compliance with the Electronic Records and Electronic Signatures Regulation.
Ground Control™ Document Control and Training Manager
Process Analysis & Automation Our research delivers the highest quality process analytical technology and lab automation solutions ISO 9001 : 2000 certified.
Pharmaceutical Regulatory and Compliance Congress and Best Practices Forum 21 CFR Part 11 Considerations November 14, 2002.
Instructions and forms
Database Auditing Models Dr. Gabriel. 2 Auditing Overview Audit examines: documentation that reflects (from business or individuals); actions, practices,
Chapter 7 Database Auditing Models
Spreadsheet Management. Sarbanes-Oxley Act (SOX, 2002) Requires “an effective system of internal control” for financial reporting in publicly- held companies.
1 OpenBee P.M. Collaborative solution for proposal management 1.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 5: Security Controls.
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency1 GMP Workshop Kuala Lumpur.
MethodECMS © כל הזכויות שמורות. Methoda Computers Ltd 2 MethodECMS  MethodECMS is a proactive package that enables the establishment.
MethodGXP The Solution for the Confusion.
HEALTH FLOW Eliminate paper forms and documents Eliminate ordering and inventorying costs of paper forms Substantially reduce operating costs Improve.
Kyle McDuffie, Vice President Beckman User Meeting 2001 Delaware. Orlando. Holland. UK Instrument Integration and Regulatory Compliance.
©2013, Cognizant Cognizant’s Validated e-Signature Solution.
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
Class Instructor Name Date. Classroom Tips Class Roster – Please Sign In Class Roster – Please Sign In Internet Usage Internet Usage –Breaks and Lunch.
Presented by Jeff Gomez St. Martin’s Press eBooks and Print on Demand Manager 2/21/02.
FDA Docket No. 2004N-0133 Themes for Renewal of 21 CFR Part 11 Rule & Guidance by Dr. Teri Stokes, GXP International
ChemStation Integration with ECM November 7, 2006 Integration of ChemStation with OpenLAB ECM Life Sciences Solutions Unit Susanne Kramer, Application.
1 Software Development Configuration management. \ 2 Software Configuration  Items that comprise all information produced as part of the software development.
E-Lock Go Paperless. Go Secure Digitally Sign & PDF files like Form16’s/16a in Bulk E-Lock PDFeSigner.
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
Report Management Using the ODS DOCUMENT Destination and Report Metadata Brit Harvey February 2010.
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
PwC 21 CFR Part 11 – A Risk Management Perspective Patrick D. Roche 07 March 2003, Washington D.C.
Database Security and Auditing: Protecting Data Integrity and Accessibility Chapter 7 Database Auditing Models.
Introduction to RtReports – Tony Fenn & Chris Nelson Introduction to RtReports Chris Nelson - Senior Developer Tony Fenn - Product Manager.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Part 11, Electronic Records; Electronic Signatures
REDCap Overview Institute for Clinical and Translational Science Heath Davis Fred McClurg Brian Finley.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation 21 CFR Part 11 Support for CS1000/3000.
Document Solutions Document Solutions Confidential Property of FileMark Corporation Document Solutions Document Solutions July 2009 Repository for Submission.
Electronic Exchange of Drinking Water Lab Data Presented by: Mike Matsko NJDEP Exchange Network Users Meeting April 18, 2006.
Validation and Use of Excel® Spreadsheets in GLP/GMP and Part 11 Environments Audio Seminar Ludwig Huber Fax.:
The world leader in serving science Overview of Thermo 21 CFR Part 11 tools Overview of software used by multiple business units within the Spectroscopy.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
TAXCO BUSINESS SERVICES INC. Division of Des-Dawn Corporation BOOKKEEPING | PAYROLL | TAX FILING | TAX PLANNING | CONSULTING INTRODUCING TAXCO BILL PAY.
PREPARED BY: PN. SITI HADIJAH BINTI NORSANI. LEARNING OUTCOMES: Upon completion of this course, students should be able to: 1. Understand the structure.
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
ValGenesis Closed Loop Change Management ValGenesis, Inc Christy Street, Fremont, CA Ph:
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
GLOBAL CAPTURE AND MANAGEMENT OF DATA Devising the solution, delivering the promise proven solutions for creating time in a busy commercial world Corporate.
FDA 21 CFR Part 11 Compliance
Managing Complexity Through Innovation
Database Development (8 May 2017).
Standard Operating Procedure (SOP) Management Software
CME Software Review: Real Life Experiences
Cover page.
Renting Homes (Wales) Act 2016
University of Kentucky E-IRB
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

GIQAR - Marzo VESMS Validated Electronic Spreadsheets Management System Marino Gobetti Information Communication Technology QA Nerviano Medical Sciences

GIQAR - Marzo Business needs Validated Excel Spreadsheets Pfizer audit observation Many FDA 483s on the subject Spreadsheets 21 CFR Part 11 compliant Security & Data protection Audit trail E-Signature

GIQAR - Marzo Options From Vendors – DaCS (Data Compliance System) – NuGenesis ® SDMS – Scientific Software ® RSME In-house development – First experience of development of a GXP computer system in Nerviano

GIQAR - Marzo Pros and Cons In-houseVendor CostLowHigh Implementation time LongShort CustomizationEasyCostly FlexibilityHighLimited Validation Development Compliance Spreadsheets Compliance Spreadsheets Integration with current systems YesNo

GIQAR - Marzo Goals  Excel Spreadsheets Validation  Integration of Excel Spreadsheets within IDARS System

GIQAR - Marzo Excel Spreadsheets  Excel Spreadsheets (Not validated) Enforce procedural controls Limiting functionality (menu/button/shortcut key) Macros to enforce controls Event handlers (open, close, print, save, etc.) Password protection VBA macros, Charts, Cells, Objects No audit trail No Excel file creation

GIQAR - Marzo IDARS IDARS system (Validated archive system) IDARS permissions and roles Read-only files E-sig on PDF files Version-based audit trail

GIQAR - Marzo Flow Diagram e-rec + e-sig Development Excel Spreadsheet *.pdf file*.xls file (master copy) *.pdf file + e-sig IDARS *.xls file master copy Data entry *.pdf file e-sig

GIQAR - Marzo Validation Strategy Compliance Functionality Spreadsheet Functionality Increasing Cost Full ValidationCompartmentalized Validation Standardizing the compliance functionality allows you to validate that part once only. It does not need to be repeated for each spreadsheet. You just need to do a minimal amount of compliance testing to demonstrate the individual spreadsheet works in that environment. With a large number of spreadsheets, the savings can be substantial. One Spreadsheet Compartmentalized Validation

GIQAR - Marzo Validation VESMS went through a full Computer Validation cycle satisfying all the 12 elements of the QA Standard 0036 Project analysis Spreadsheet designSpreadsheet development System test Project plan Validation plan System design System development Maintenance Implementation Spreadsheet test

GIQAR - Marzo VESMS Features  VESMS is a modular system made of a common basis and separate Excel applications for each type of calculation  VESMS relies on the IDARS system for a secure and validated data archival  Users work on validated unchangeable Excel templates; generate, store, and sign only PDF files

GIQAR - Marzo VESMS Benefits Validated macros and formulas Standardized calculation and reporting Comprehensive and consistent output No need to double-check calculations e-Rec / e-Sig compliant with 21 CFR Part 11 Effective and efficient archiving system Easy retrieval of previous results Easy sharing of results No qualification needed for client PCs A step towards paperless workflow Minor validation effort for new spreadsheets

GIQAR - Marzo Timelines & Resources Start date 19 May 2004 Implementation date 16 November 2004 External costs (dev. and val.) = 0.00 € No additional maintenance cost for the future 20 Acrobat licenses: 5700 € (licences also available for other applications)

GIQAR - Marzo Conclusions All Departments, in any Business Unit, that need to use Excel spreadsheets to perform repeated calculations in a validated environment can develop specific spreadsheets to be included in VESMS system. The data are e-Records with e-Signature compliant with FDA 21 CFR Part 11 and can be used for any internal and external regulated activity.

GIQAR - Marzo Consultancy VESMS Team is available for consultancy on demand VESMS Team