1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN
2 Work Organization Dismantling Cutting Temporary storage Sorting TreatmentCharacterizationEvacuation Identification
3 Objective Traceability of material from production to removal From the point of view of external services Asked by the regulatory authority Information flow between the operator and the contractant (others services)
4 Traceability From the point of view of the operator: Improvement of decommissioning experience Allow the right treatment process in function of type of material or component Allow the right evacuation route in function of the history of the material Allow the calculation of decommissioning cost
5 Tools History of the plant Inventory of material (components, circuits and building) Database QA program related to material and waste management Specific tools (weighting pallet jack, drum scanner, sticker)
6 Working methodology followed during the actual dismantling
7 REMOVAL ROUTES BR3
8
9 DISMANTLING Using different techniques Thermal cutting techniques Mechanical cutting techniques Hydraulic cutting techniques More details: Chapter 11
10 DISMANTLING methodology – BR3 Contaminated pieces Cut into large pieces on place Further cutting into smaller pieces in ventilated cutting booth Radiological reasons Better place to use thermal techniques Activated pieces Under water PWR design
11 DISMANTLING methodology – BR3
12
13 Creation of “batches” Batch : Group of materials that will follow the same removal route A batch can be: 300 l container 200 l drum 400 l drum Single large piece e.g. a reservoir Every batch carries a unique label unique number content of the batch
14 Description Dismantling instruction Inventory records Loop, pieces of … Dimensions - diameters Type of material (stainless steel, carbon steel, painted …) Origin (area, place in area…) Identification of a BATCH at BR3
15 Batch types at BR3 200-l drum 300-l container Single piece
16
17 Storage Mostly not foreseen for the exploitation Need of extra buildings or storage places on site during decommissioning
18 Examples External storage (BR3) Interim Storage North (Greifswald) Internal storage (BR3)
19
20 Treatment Mostly decontamination Mechanical methods (e.g. sandblasting, scabbling) Chemical methods See Chapter 10
21
22 Radiological Characterization Waste and melting Easy detectable isotopes: γ-spectroscopy Difficult detectable isotopes: isotope vector and radiochemical analysis. Unconditional clearance Surface measurements (Bq/dm²) “Mass” measurements (Bq/g) Techniques and equipments See chapter 8
23 Radiological Characterization Unconditional clearance methodology at BR3 Producer suggests the characterization methodology to be used Health Physics and Authority approve it Try to find standard methodologies
24
25 Classic “characterization” After nuclear clearance looking at the classical safety aspects of the material Asbestos Heavy metals (Pb, Hg, …) Oils and greases TL-tubes … National (and or Regional) regulations
26
27 Example: High activated internals Dismantling: mechanical techniques (circular and band saw) under water Characterization Sampling: swarfs Radiochemical analysis → isotope vector Removal Special racks 400-l drum
28 Example: High activated internals 49 transports tons of metal 14.7 TBq
29 Example: High activated internals
30 Example: High activated internals
31 Example : Asbestos Specialized firm Unable to decontaminate Removed as radioactive waste (compressible waste) l drums 13.2 tons
32 Example : Asbestos
33 Example : Asbestos
34
35 Example: Turbine shaft One piece removal Decontamination: CO2- blasting 1 measurement with ISOCS
36 Example: Turbine shaft
37 Example: Encapsulated lead Lead from a shielding wall During the melting taking of samples Radiochemical analysis Around 40 tons
38 Example: Encapsulated lead
39 Example: Encapsulated lead
40 Video Example: Encapsulated lead
41 Data acquisition The content of a batch, its status and its location must be known at each moment… All relevant information is on a label All this information is put into a database including the location of the batch Implementation of a Quality Assurance system
42 Evacuation of Radwaste
43 Evacuation of Free released materials
44 Evacuation to Melting Facility
45 UPDATING DATABASE UPDATING INVENTORY’S RECORDS AFTER EVACUATION
46 DATABASE