Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.

Slides:



Advertisements
Similar presentations
1 Cable Assembly for CanSat. 2 Heat Shrink Tubing Battery Pack Connection Pin Connectors Radio Cables Mic & Speaker Plugs See close up connection page.
Advertisements

Club Car IQ Technical Information
Basic Jens Neigaard.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
Optical Manufacturing Solutions 1 Probe Assembly.
ECE 300 Microprocessor Project Using The Texas Instruments MSP 430F449PZ Controller Group members: William Bohon Steve Bishop Steve Bishop Ann Tan Ann.
MOOD LIGHT PCB ASSEMBLY V By Phil Townshend 2008.
CricketSat LP (Transmitter) Assembly Instructions This is the instruction slides for the assembly of a transmitter board. This is the board that will fly.
Register Digital Multimeter Usage Click Register to begin the course.
Pulse Detector Ramiro Duarte, Clayton Greenbaum Prof. Betty Lise Anderson.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
New Human Computer Interfaces Amnon Dekel HUJI – CSE, Spring 2007 Class 3 March
V Input V Output Kelvin Monitor Points Input power +12 volts Output / Test Load Carrier Board Plug In Card ASIC Chips Load Keep Short Leads Cable Yale.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #08 Gateway To Space ASEN / ASTR 2500 Class #08.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
Register Digital Multimeter Usage Click Register to begin the course.
Dr. Hoganson CSIS HC11 Demo Program This is our first lab using the 68HC11 microcontroller. We will “talk” to the microcontroller from a PC, run.
Vex 1.0 © 2005 Carnegie Mellon Robotics Academy Inc. Touch Sensor This lesson will explain how to hook a standard micro switch into the Vex system to function.
Register Digital Multimeter Usage Click Register to begin the course.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
1 Computer Power Supply Amateur Radio Conversion For Cheap +12 vdc Power March 17, 2003.
VGD-33 single unit upgrade to parallel system All single units must work properly Installation of the external cables and power cords: all should be connected.
Pot 32x16 channels = 512 Readout a pair of rows on one end and the next pair on the other. Connect the fibers to “SiPM cassettes” in 2 row by 16 channel.
Gate Anode Cathode. You will need the following parts from your kit: 1.Breadboard ohms resistor (red, red, brown, gold) ohms resistor (brown,
JMC – Joint Motion Controller Complete guide to building and testing each JMC.
AnaSonde-3M Assembly. What is the AnaSonde-3M? The AnaSonde-3M reads temperature, pressure and humidity data from the atmosphere. After the AnaSonde is.
Register Digital Multimeter Usage Click Register to begin the course.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
Two basic types Ceramic disk Electrolytic Has positive and negative sides Farads – unit of measure (F) Microfarads(uF) and picofarads (pF) Cans have value.
OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
Sensor design and mass test system development Y. Kwon (Yonsei Univ.)
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
Main contacts closed – RED Colour with ON
Siemens Review – Chapters 2 and 3 Potentiometers.
MSP430 Project ECE 300 Spring 2006 Cortney McKibben Rebekah Wilson Shupeng Zhang.
The Basics Electronics. To familiarise yourself with electronics To have an understanding of how and why we test electronic circuits. To complete a test.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
Probe card preparation Y. Kwon (Yonsei Univ.) for EQENG, Notice, & Yonsei.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Chip design and mass test system development Y. Kwon (Yonsei Univ.)
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Hardware Configuration Guide Configuring Dongles and Creating Barcodes for Devices Used with VSC.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Automatic Test Equipment Development with C-ON Seo Dong Gon Yonsei University.
RockOn! RockOn! Structure Build RockOn! 2009.
LED Display Verification of Functionality
Unit 45: Circuits and components Dr
Introduction to Handshaking Communication with SSC-32U
Probe-card Healthness Check-up
Maintenance masterdrive siemens
HVI HIPOT TEST SET Pft sERIES.
BUILDING A PC WEEK 1.2 You have 90 minutes to complete the 13 steps.
Personal Protective Equipment
Computer Repair & Maintenance
Vibration Monitoring System M14
NI Data Acquisition (DAQ) Wiring and Connections
Module 1 – Power Supply AMC APS-PBC-60
THERMOMETER PROJECT PCB ASSEMBLY INSTRUCTIONS Ver: 3.21 edutek.ltd.uk.
Task 1 You are going to use the Makey Makey arrow inputs to create a joystick / games controller. Step 1: Connect Makey.
Electrical components and systems
2019 Investing Now Summer Program
Presentation transcript:

Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card with contact needles for chip Apply +50V on sensor back side via needle Ground sensor front side via chip contacts (-> probe-card)

Probe-card Manipulator arm with needle Sensor back side Probe-card needles

Check-list: The probe-card is installed correctly. Cables J1 and J2 are connected to the probe-card and on the other side to the MB card. The connectors on the cables are labeled as well as the connectors on the probe-card. On the MB side the connector names are on the large PCB: J1=J1, J10=J2. The 5 cables from the MB card should be connected to the Gossen power supply. The manipulator coax cable should be connected to the filter (lemo connectors with capacitors and resistor). The filter should be connected on one side to the Keithley (inner conductor=> +, outer conductor => -) and on the other side to the lemo cable soldered to the probe-card.

MB card Cables J1+J2 Probe-card The probe-card is connected via cables J1+J2 to the MB card. The MB card is connected to the Gossen power supply:

Contacting the chip After the first contact the chuck needs to be moved up by ~ microns to ensure a good electrical contact: 1st contact: Needles barely touch the pads Good el. contact (1st contact + 80 microns): Needle marks are clearly visible

Chuck settings: SET ALIGN to -500 microns (important to avoid damage to the probe card!). SET SEPARATION to microns. Once the contact point is found the CONTACT should be SET. The same contact setting can be used for all chips unless the prober is switched off in between.

Gossen Power Supply (Chip): -5V ~ 100mA +5V ~ 600mA +5V ~ 1A The cables should be connected correctly and the three outputs should be adjusted to 5V (checked April 05). The expected current consumption of the 3 outputs is indicated above. Gossen power supply with cables to the MB card MB card Cables After contacting the chip with the probe-card needles the power supply can be switched on:

Sequence - SWITCH ON: Position single/ladder on vacuum chuck. Contact the pads of the chip with the probe-card needles (see previous slides). Contact the back side of the sensor with the manipulator needle. Switch on the Gossen 3x5V power supply.

Switch on the PC and VME crate Start “ALICE PTS” Labview program located on the desktop. Select “Initialize” and “Initialize VME” from the menu of the ALICE PTS window. This will start the VXI resource manager. Once it finished, click OK. Go back to the ALICE PTS window and click “Initialize JTAG” and “Initialize MB”. A red LED on the MB card will come on. Switch on the Keithley Increase the bias voltage (Keithley) up to 50V and measure the leakage current (Keithley). Sequence - SWITCH ON … continued:

Sequence - SWITCH OFF: Warning: do not disconnect the needles with the power supplies switched on! 1.Decrease the bias voltage (Keithley) to 0V. 2.Switch off the Keithley 2410 power supply. 3.Switch off MB card using black switch on the PCB. 4.Switch off the Gossen 3x5V power supply. 5.De-contact the manipulator needle. 6.De-contact the chip by moving into “ALIGN position”.