PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | 11.03.2014 | Markus Keil.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

Uli Schäfer 1 Ethernet-driven control and data acquisition scheme for the Timepix-based TPC readout R. Degele, C. Kahra, U. Schäfer, M.Zamrowski Univ.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Digital Correlated Double Sampling for ZTF Roger Smith and Stephen Kaye California Institute of Technology.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
LSV2 Autonomous Chargers Design Team: (from the left) Branden Carpenter Wayne Romine Jon Stoker Dr. Hess (Advisor) Maggie Richardson.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Capstone Fall 2005 GFX-One Guitar Processor Team Carpal Tunnel October 6 th 2005.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
PowerBench Programmable Power Supply Dror Lazar Moran Fishman Supervisor: Boaz Mizrahi Winter Semester 2009/10 HS DSL.
SVT TDR meeting – March 30, 2012 List of peripheral blocks for SVT strip readout chips.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
CMS Upgrade Workshop November Fermilab POWER DISTRIBUTION SYSTEM STUDIES FOR THE CMS TRACKER Fermilab,University of Iowa and University of Mississippi.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Motherboard (Main board)
Pinewood Derby Timing System Using a Line-Scan Camera Rob Ostrye Class of 2006 Prof. Rudko.
PCIe Mezzanine Carrier Pablo Alvarez BE/CO. Functional Specifications External Interfaces User (application) FPGA System FPGA Memory blocks Mezzanine.
Understanding Data Acquisition System for N- XYTER.
CaRIBOu Hardware Design and Status
SEABAS DAQ development for T3MAPS Readout Abhijeet Sohni (with – Max Golub, Raymond Mui and Sean Zhu) Fall Quarter 2014.
Test setup 07/08/ Components Labview control application I2C communication FPGA firmware IC board 2.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
Test Setup for FE-I3 single chips / modules, FE-I4_proto1 and for full scale FE-I4 Marlon Barbero, Bonn.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
ASIC Activities for the PANDA GSI Peter Wieczorek.
09/02/20121 Delay Chip Prototype & Delay Chip Test Board Joan Mauricio – Xavier Ondoño La Salle (URL) 12/04/2013.
©F.M. Rietti Communication Lines Fundamentals. ©F.M. Rietti LM-18 Computer Science SSI Embedded Systems I 2 Communication Lines Generally used to connect.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
1 Test Setups for the FE-I4 Integrated Circuit Stewart Koppell 8/1/2010.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
1 Lab. 12 Signal transmission with two boards  The system: –Use DSP to conduct processing in this lab. DigitalAnalog a(n)a(n) DigitalAnalog DAC ADC PC.
SIDE SCAN HARDWARE CONFIGURATION
Introduction A new generation of the ATLAS Binary Chip (ABC) readout ASIC has been designed in the IBM 130nm CMOS 8RF process to support ongoing R&D towards.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
Brandon Halleran.  The power supply for your personal computer gives your machine all the different voltages it needs to operate properly. It is able.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
Update on works with SiPMs at Pisa Matteo Morrocchi.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Powering tests with the PP2 regulator Laura Gonella Physikalisches Institut Uni Bonn.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Development of T3Maps adapter boards
AT Commands Supports AT commands
Test Boards Design for LTDB
ECAL Front-end development
CALICE meeting 2007 – Prague
PyBAR Firmware Structure and Operation Experience
Testing and Configuration for VMM1 on the mini-MMFE
Status of the DHCAL DIF Detector InterFace Board
Hans Krüger, University of Bonn
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
Carlos Abellan Milano, May 18th 2016
EVLA MONITOR & CONTROL CDR
CALICE meeting 2007 – Prague
Presentation transcript:

PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil

pALPIDEfs TEST SYSTEM Standard configuration: Composed of DAQ board and chip carrier Chip carrier only DUT and de-coupling DAQ board contains USB interface, FPGA, ADCs for current measurements … ALICE© | ITS-MFT Mini-Week | | M. Keil2

PROBE CARD INTEGRATION Simplicity of chip carrier allows to easily substitute it with a probe card In the standard setup the chip carrier is connected directly to the PCIe connector, however extender cables are available. This would enable us to do all tests available on the test system also on the probe station without increasing the complexity of the probe card: Complete tests of chip functionality: communication, register tests, digital and analogue injections, threshold scans … Current and voltage measurements: Supply currents, monitoring currents or voltages of on-chip DACs Only requirement: implement (simple) carrier schematics and PCIe connector on probe card Already implemented in latest version of schematics; to be submitted this week ALICE© | ITS-MFT Mini-Week | | M. Keil3