NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

AIM Enterprise Central Site Planning
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
Fred Barranger (N72) John Wishall (N721B) 24 February 2015
AIM FRB Meeting 4-6 November Meeting Logistics Parking Base Access – not needed Coffee Vending Machines Food Facilities Come & Go as needed…
AIM Toolset Interfaces with Authoritative Technical Data
1 AIM/CPM Pilot Project Status Report 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Roy Hoyt & Leslie Desenburg, NETC N74.
Authoring Instructional Materials (AIM)
Authoring Instructional Materials (AIM) Roadmap
NSW AIM FRB Utilization Discussion Karen Pohl Curriculum Systems Director Naval Special Warfare Center 4-6 November, 2009 Orlando, FL 1.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
AIM Program Software Status
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
Navy Job Analysis (NJA) 1.  Purpose: Restore, streamline and improve Navy Job Analysis Management Capabilities  Supports: Navy Occupational Classification,
Lessons Learned from NETPDTC Central Site Implementations Lessons Learned from NETPDTC Central Site Implementations 23 Aug 11 Peg David, NETPDTC Project.
NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
IT Curriculum Process and Products September 6, 2014 David Pearson Director, Engineering and Technology Center.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
NAVEDTRA 135C CHANGES 29 March 2010
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Job Duty Task Analysis HMC(FMF/EXW/SW) David Tayamen.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Block Learning / Ready Relevant Learning and
 Course Master Schedule/Resource Requirement List Authoritative Data Sources. (CeTARS or AIM CPM)  Identify Current CMS Business rules and deficiencies.
Individual and Staff Joint Training Working Group
Leaning the E2E Process John Wishall.
Presentation transcript:

NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 3 Apr 12

Overview NAVEDTRA policy and process documents NETC N7 policy/process for migration from NAVEDTRA 130/131 to NAVEDTRA 136 for new content development NETC N7 learning content development IDIQ Upcoming JDTA projects as candidates for NAVEDTRA 136 / CPM-LO Module efforts AIM Central Site implementation AIM I-II/CPM/LO Module interfaces with ETMDS Atlas Pro CPM status support of OCCSTD capture/validation NETC/OPNAV N15 integration of NETC domain/acquisition community business processes

Promulgated NAVEDTRAs 130B (Task-Based Learning Content) 131B (PPP-Based Learning Content) 132 (Testing) 133 (HPRR) 134A (Navy Instructor Manual) 135C (Schoolhouse Mgmt) 136 (ILE Learning Content) 137 (JDTA)

NAVEDTRA Drafts 138 (FEA) All NAVEDTRA’s currently under revision Revisions to be completed by Aug 2012 Re-engagement with NAVAIR Standards to recommence in Sep 2012

Date: 24Jan2012_V1/rh/ko/jtw External Training Requirement Sources: Course Development / Revision End - to - End Process Perform Front End Analysis (FEA) Develop Business Case Analysis (BCA) Develop Training Project Plan (TPP) Develop New Course or Revise Existing Course and Pilot Perform Content Quality Review for Content Re-Use or Re-Purpose Perform Job Duty Task Analysis (JDTA) NAVEDTRA 137 Job Duty Task Analysis (JDTA) Management Manual July 2011 Front End Analysis (FEA) User Guide NETCINST March 2010 Business Case Analysis (BCA) Policy NETCINST October 2009 NAVEDTRA 136 ILE Course Development & Life-Cycle Maintenance Manual November 2010 NAVEDTRA 131B PPP Based Curriculum Development Manual November 2010 NAVEDTRA 130B Task Based Curriculum Development Manual August 2009 NAVEDTRA 132 Navy School Testing Program Management Manual March 2011 NAVEDTRA 135C Navy School Management Manual March 2010 NAVEDTRA 134A Navy Instructor Manual August 2009 Resource Sponsor / Training Support Agent Commits to Resource Training Requirement Training Requirement Identification & Resource Sponsor Commitment NETCINST December 2010 OPNAV N1 Training Requirement Sources External Training Requirement Sources Course Development and Revision Process OPNAV N1 Training Requirement Sources Course Development & Revision Process Color Key: Requirement Sponsor & Resource Sponsor Actions External Training Requirement Sources OPNAV N1 Training Requirement Sources NETC Course Development and Revision Process NTSP Revision Fleet Performance Assessment Fleet Performance Assessment Operational Risk Management (ORM) Assessment Operational Risk Management (ORM) Assessment Direct Fleet Input Direct Fleet Input Human Performance Requirements Review (HPRR) Human Performance Requirements Review (HPRR) Requirement Sponsor Provides Formal Correspondence Identifying Training Requirement End Process Deliver Course of Instruction Trigger Initiating Process NAWCTSD Orlando, FL Quality Evaluation Tool Technical Report June 2005 NETC Course Development / Revision End - to - End Process Naval Education and Training Command Course Development & Revision Process (1 of 2) OPNAV N1 Training Requirement Sources Trigger Initiating Process Revision to Enlisted Occupational Standard Revision to Enlisted Occupational Standard Rating Merger Establishment or Revision of a NEC Establishment or Revision of a NEC NAVEDTRA 133 Human Performance Requirements Review Management Manual June 2011

Date: 24Jan2012_V1/rh/ko/jtw Course Development / Revision End - to - End Process Perform Front End Analysis (FEA) Develop Business Case Analysis (BCA) Develop Training Project Plan (TPP) Develop New Course or Revise Existing Course and Pilot Perform Content Quality Review for Content Re-Use or Re-Purpose Perform Job Duty Task Analysis (JDTA) NAVEDTRA 137 Job Duty Task Analysis (JDTA) Management Manual July 2011 NAVEDTRA 131B PPP Based Curriculum Development Manual November 2010 NAVEDTRA 130B Task Based Curriculum Development Manual August 2009 NAVEDTRA 135C Navy School Management Manual March 2010 NAVEDTRA 134A Navy Instructor Manual August 2009 Change in Work Requirement Change in Work Requirement Change in Delivery Method or Performance Standard Change in Delivery Method or Performance Standard Change in Resource Requirement; CDP Addition or Deletion Change in Resource Requirement; CDP Addition or Deletion Change in Course Length Change in Course Length Front End Analysis (FEA) User Guide NETCINST March 2010 Business Case Analysis (BCA) Policy NETCINST October 2009 NAWCTSD Orlando, FL Quality Evaluation Tool Technical Report June 2005 NAVEDTRA 136 ILE Course Development & Life-Cycle Maintenance Manual November 2010 NAVEDTRA 132 Navy School Testing Program Management Manual March 2011 NETC Course Development / Revision End - to - End Process Learning Center Course Surveillance Course Surveillance Formal Course Review Formal Course Review Fleet Feedback As Directed by the CCA As Directed by the CCA Course Development & Revision Process Color Key: External Training Requirement Sources Requires NETCINST Submission * * OPNAV N1 Training Requirement Sources Triggers That Could Cause a LC to Conduct a HPRR Possible Take-always from a HPRR NETC Course Development and Revision Process NETC Policy Documents Revision to an Enlisted Occupational Standard Revision to an Enlisted Occupational Standard Rating Merger Establishment or Revision of a NEC Establishment or Revision of a NEC OPNAV N1 Training Requirement Sources * * * NTSP Revision Operational Risk Management (ORM) Assessment Operational Risk Management (ORM) Assessment Fleet Performance Assessment Fleet Performance Assessment Direct Fleet Input Direct Fleet Input External Training Requirement Sources * * * * Human Performance Requirements Review (HPRR) Human Performance Requirements Review (HPRR) * External Training Requirement Source Deliver Course of Instruction Trigger Initiating E2E Process: Naval Education and Training Command Course Development & Revision Process (2 of 2) * NAVEDTRA 133 Human Performance Requirements Review Management Manual June 2011

NETC N7 Policy/Process for Migration from NAVEDTRA 130/131 to NAVEDTRA 136 NETC NOTE defining policy: ‒Proposed Verbiage: Any new development within the NETC domain or revision of 50% or greater will be performed using AIM CPM/LO Module. Legacy AIM I/II will remain for the sole purpose of sustaining existing courses and content that do not reach the above threshold. LC’s should strive to convert all courses to AIM CPM as workload permits.

NETC N7 Learning Content Development IDIQ Award status Will be primary vehicles for NETC Learning Centers to acquire new content and revise existing learning content Role of CPM/LO Module and interface with CBT authoring tools

Upcoming JDTA projects as Candidates for NAVEDTRA 136 / CPM-LO Module efforts JDTAs required for all revisions that add new work to a course (tasks) regardless of development tool (AIM I/II/CPM). New builds within NETC will use CPM/LO Module

AIM Central Site Implementation Management points of contact: ‒ NETC N74: Leslie Desenburg ‒ NETPDTC: Peg David Center-by-Center implementation schedule: ‒ Managed by Leslie Desenburg ‒ Resumed in legacy environment in Jan 12; transition to eDMZ upon ATO granting Peg David to brief in more detail

CenterAIM POC Revised Post C&A Plan Submission CIDDonald KaniaDec/Jan CSSMichael BuechelJan CSCSJessie HarrisJan/Feb CHAPSClaire OlonaMarch CPPDRick BlyApr SWOSD. Harrison-YoungsApr CEODDMarion Conley and Frank CarboneMay CSFRoy WildeMay SLCPedro MooreJun

AIM I-II/CPM/LO Module Functional Interfaces with Atlas Pro Atlas Pro LMS: AIM I/AIM II/LO Module will output SCORM 2004 ILT content packages that can be delivered to ECR and tracked via LMS ROCCE: LO Module will export to and import from ROCCE CBT design data and metadata to support integrated development and life-cycle maintenance Assessment Engine: AIM I/AIM II/LO Module will output test planning data and test items to Assessment Engine and import test item analysis data

OCCSTDS Support in CPM How did we get here?: – Started with NETC N74/NAVMAC discussions – AIM Team provided a CPM “sandbox” for NAVMAC familiarization – NAVMAC developed an OCCSTDS Storybook PPT to describe high- level functionality – Initial OCCSTDS tab implementation in Rel 5.0 for creation/management of OCCSTDS data by NAVMAC – crawl functionality Working toward business rule definition of: – How OCCSTDS data pulls forward into JDTA tab – Life-cycle impacts of OCCSTDS revisions on JDTA-based learning content

Integration of NETC Domain/Acquisition Community Business Processes NETC N74 working with aviation community (Kelee Plagis of CNAF) on ‘harmonizing’ NAVEDTRA business process with that in Naval Aviation Training System (NATS) Handbook for NETC domain and acquisition community standardization ** Will recommence Sep 2012 post NAVEDTRA revisions and Stand-up of OPNAV N9’s

Questions?

Backup Slides

AIM Interface with Atlas Pro LMS

AIM Interface with ROCCE

AIM Interface with ROCCE (detail)

AIM Interface with Assessment Engine

(contd)