HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.

Slides:



Advertisements
Similar presentations
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Advertisements

Industrial Ventilation - A major control measure Dr. AA, UTM.
Ralf Trant on behalf of the HSE team Health, safety and environment.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
FCC Week 2015 Program of I&O presentations Ph. Lebrun 25 February 2015.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
FCC Tunnel Civil Engineering and Geology John Osborne (CERN GS-SE) 4 April 2014.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 Status report LPC 07/05/2009 B. Delille, S.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Extraction and beamline progress B.Goddard TE/ABT.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Update on the PSB Cooling and Ventilation Systems
CLIC Civil Engineering Update
CLIC Civil Engineering & Infrastructure
FCC lifts Layout, characteristics etc.
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
HEL – Safety aspects Christelle Gaignant
5th FCC Infrastructure & Operation meeting
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
FCC Tunnel and Shaft Cross Sections
COOLING & VENTILATION INFRASTRUCTURE
Extract from today’s talk given to DCB
RSFs & categorisation 20 May, 2019.
Workshop on fire protection for physics research facilities
FCC study – Fire collaboration WP4 Status & Update
Presentation transcript:

HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting

Tunnel cross-section Choice of tunnel cross-section should respect the main Safety requirements: 17/12/2014 Conventional SafetyRadiation Protection Personnel transportation for egress Personnel transportation for short transit times between access and intervention point “Safe zone” in the tunnel (fire resistant, air/gas tightness and in ‘overpressure’) Parallel service tunnels along all potential high-activation sectors Air management aspects FCC I&O Meeting

Single vs. Double tunnel SingleDouble Larger tunnel diameter required Smaller tunnel diameter, in total more space available to integrate/handle infrastructure Larger air volume will lead to higher activity levels Smaller air volume will lead to a lower total activity. Fire resistant and ODH proof passage for egress (with dedicated ventilation) Optimised separation of hazards (activation, cryo, electricity, heavy equipment transport) from evacuation and passage ways Frequent passage doors between “Safe Area” and tunnel (min. every X meters) Frequent passages between both tunnels (min. every Y meters) 17/12/2014 FCC I&O Meeting Ref: “CLIC Conceptual Design Report”, CERN , Geneva 2012

Tunnel cross-section 1. Ideal solution: Double concept for the whole of the FCC 17/12/2014 FCC accelerator tunnel “Hazard Area” FCC access tunnel “Safe Area” with personnel transport mean FCC I&O Meeting

Tunnel cross-section 2. Alternative solution: Double concept for high activation sectors 17/12/2014 FCC accelerator tunnel with “Safe Area” for egress: Optimise area w.r.t. Safety FCC I&O Meeting

Underground infrastructure TopicRequirement Personnel transport and evacuation Personnel transport system for fast transfer between access point and intervention locations and for fast evacuation Equipment transport Autonomous transport devices for equipment and material distribution (“Dispatch service”) Remote inspection and handling Prepare infrastructure for remote handling of highly radioactive equipment Integrate remote inspection devices Sanitary facilitiesRadiation Safe areas for sanitary facilities Tunnel walls Tunnel surfaces shall be treated to minimise dust production and limit tritium releases from concrete Potential need for a cooling system for rock heating and wall insulation EquipmentCooling of equipment should not rely on HVAC systems 17/12/2014 FCC I&O Meeting

Underground infrastructure TopicRequirement Fire Fighting Ad-hoc and standard fire fighting and rescue equipment stored underground Extinguishing systemAutomatic extinguishing systems for early fire attack Fire and smoke compartments Compartmentalization (walls or curtains) to facilitate evacuation and intervention and to limit the extent of damage. Lifts Feasibility with respect to Safety requirements be clarified for expected depth Storage/Buffer zones Activation Safe (shielded) storage areas for highly radioactive equipment removed from the accelerator and for important spare parts 17/12/2014 FCC I&O Meeting

Tunnel & shafts location Maintain minimum distances to lake bottom and underground infrastructures Hydrogeological optimisation to prevent ground water activation Place air release sites in less densely populated areas to minimise impact from air- borne radioactivity Environmental impact on the surface sites 17/12/2014 FCC I&O Meeting

Air activation General considerations on the radiological impact by radioactive air: The total released activity and activity concentration is determined by the air exchange rate and the effective decay time of the air before being released For the environmental impact, only the total released activity is of concern. For the exposure of workers surrounded by activated air only the activity concentration is of concern. Known beam loss locations may be shielded to minimise air activation (dumps, collimators, forward shielding at interaction points) 17/12/2014 FCC I&O Meeting

Air management TopicRequirement Transverse vs. Longitudinal ventilation Transverse ventilation does not offer advantages without shielded ducts, therefore longitudinal ventilation is a viable option if the smoke/ODH extraction proposal is implemented ConfinementCompartmentalization between high activation, low activation and no activation sectors Static: air tightness in the civil engineering and sealing cables, ducts, piping, etc. Dynamic: pressure difference between compartments with different activation sectors; ReleasesAir from high activation sectors should be released at distant outlets to maximise the decay time Release points shall be placed in less densely populated areas Could air compression or condensation be a technical option for temporary decay storage ? 17/12/2014 FCC I&O Meeting

Air management: Smoke extraction TopicRequirement Smoke extractionProposal presented to I&O in July 2014: Limit propagation and contamination of smoke to others volumes of the tunnel Provide the dynamic confinement Reduced cross section of the ducts compared to transverse ventilation Linear pressure drop for 8 km  ~5 kPa (EDMS ) 10 km  ~7 kPa Smoke filteringFiltration or cleaning of extracted smoke shall be considered 17/12/2014 FCC I&O Meeting

Air management: Operating modes TopicRequirement In beam modeDetermine optimal extraction flow-rate considering: Release of short lived emitters Accumulation of long lived emitters Tritium concentration in condensates Guarantee sufficient confinement Operational parameters (temperature, humidity, air speed) In access modeOnly flush the accelerator sectors to be accessed Temperature, humidity and air renewal adapted to occupational health requirements In incidental situationsIn case of fire  stop the tunnel ventilation and start the smoke extraction Helium release  same as fire (simulations still need to be done) 17/12/2014 FCC I&O Meeting

Air management: HVAC infrastructure TopicDescription Operating parametersExtraction rates, temperature and humidity shall be controlled Parameter monitoringSufficiently dense monitoring network for temperature, humidity, pressure, air speed and oxygen level Installation locationsInstall HVAC on the surface or in accessible locations StacksSufficiently high stacks to be foreseen Release monitoringAll release stacks equipped for radioactivity monitoring RedundancyForesee redundancy for full or partial functions CondensatesConsider condensate collection and reduction infrastructure on the surface or in accessible locations 17/12/2014 FCC I&O Meeting

Summary 17/12/2014 Tunnel cross-section - Ideal solution: Double tunnel - Acceptable solution: Tunnel to bypass high radiation zones + transport mean inside the “Safe Area” Underground infrastructure - Personnel & equipment transport means - Shielded storage areas - Fire compartmentalization - Rescue equipment stored underground Tunnel & shafts location - Assess environmental sensitive areas - Hydrogeological study - Extraction points in less densely populated areas FCC I&O Meeting

Summary 17/12/2014 Air management - Longitudinal ventilation + smoke/ODH extraction proposal is a viable option for ventilation - Static and dynamic confinement different activation and fire sectors - Optimise extraction to maximise the decay time - Filtration of smoke - During beam mode: optimise extraction flow-rate - During access mode: Only flush the accelerator sectors in access mode FCC I&O Meeting

17/12/2014 Spare Slides FCC I&O Meeting