VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.

Slides:



Advertisements
Similar presentations
Towards the e-APT Tasso Tzioumis ATNF
Advertisements

VLBI progress Down-under Tasso Tzioumis Australia Telescope National Facility (ATNF) 25 September 2008.
ELBA – Current Developments Chris Phillips eVLBI Project Scientist 16 June 2008.
Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Dominik Stokłosa Pozna ń Supercomputing and Networking Center, Supercomputing Department INGRID 2008 Lacco Ameno, Island of Ischia, ITALY, April 9-11 Workflow.
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
E-VLBI Progress with the LBA Chris Phillips, eVLBI Project Scientist November 2011.
European VLBI Network of Radio Telescopes - a killer application for Grid ? - Mike Garrett FP6 GRID Meeting, March 2003.
E-VLBI progress in the South Tasso Tzioumis ATNF, CSIRO September 2006 “Towards e-VLBI”  “e-VLBI”
A supercomputer-based software correlator at the Swinburne University of Technology Tingay, S.J. and Deller, A.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
Mopra Operations Balt Indermuehle 13 June ATNF Mopra Operations What’s new at Mopra Telescope Operating Alerting Device Gotta love the TOAD! Mopra.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk Kevin Dudevoir Jason SooHoo MIT Haystack Observatory 24 March 2006 EVN TOG meeting.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-VLBI: Science with Multi-Gigabit Global Networks Dr Shaun Amy (Dr Chris Phillips, Dr Tasso Tzioumis) Australia Telescope National Facility 22 January.
LBA Correlator & Operations LBA’05 Ops mtg Hobart 8 Feb 2005 Tasso Tzioumis.
03/000 VLBI Australian Government Geoscience Australia.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
E-VLBI: Connecting the Global Array of Radio Telescopes through High-Speed Networks Participating U.S. organizations: MIT Haystack Observatory MIT Lincoln.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
E-VLBI at ≥ 1 Gbps -- “unlimited” networks? Tasso Tzioumis Australia Telescope National Facility (ATNF) 4 November 2008.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
03/000 New geodetic VLBI dish in WA Australian Government Geoscience Australia.
Recent results from the Swinburne supercomputer VLBI software correlator(s) Steven Tingay, Craig West, Adam Deller, Shinji Horiuchi Centre for Astrophysics.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
The CSIRO ATNF Gigabit Wide-Area Network Shaun W Amy CSIRO Australia Telescope National Facility.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
E-VLBI: Creating a Global Radio Telescope via High-Speed Networks Alan R. Whitney MIT Haystack Observatory SLAC Data Management Workshop 17 March 2004.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
ORIENT/ORIENTplus - Connecting Academic Networks in China and Europe Jennifer(Jie) An CERNET Center/Tsinghua University 14 Feb.2012.
VLBI/e-VLBI An Introduction for Networkers Tasso Tzioumis, ATNF, CSIRO.
Arecibo (JIVE/EXPReS +) Presented by : Tapasi Ghosh Other active players: Arun Venkataraman, Chris Salter, & Emmanuel Momjian. A brief history.
DiFX Performance Testing Chris Phillips eVLBI Project Scientist 25 June 2009.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
Distributed FX software correlation Adam Deller Swinburne University/CSIRO Australia Telescope National Facility Supervisors: A/Prof Steven Tingay, Prof.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
E. Momjian, T. Ghosh, C. Salter, & A. Venkataraman (NAIC-Arecibo Observatory) eVLBI with the 305 m Arecibo Radio Telescope ABSTRACT Using the newly acquired.
Network Connections – e-VLBI Tasso Tzioumis ATNF.
Australia Telescope Users Committee Technologies Report - Nov 2007.
Development of DiFX Adam Deller NRAO 3rd DiFX workshop, Curtin University, Perth.
, EVN Users Meeting Tom Muxlow Cagliari, 9 th October 2014.
Possible eVLBI connection between Eastern Asian Observatories Noriyuki KAWAGUCHI National Astronomical Observatory, Japan eVLBI Workshop
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
Coordinator’s report Huib van Langevelde EXPReS board Utrecht, 30 January, 2008.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
Safe and secure control of VLBI stations from remote Alexander Neidhardt (FESG, TUM) Martin Ettl (FESG/MPIfR), Jim Lovell (UTAS),
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
E-VLBI – Creating a Global Radio-Telescope Array via High-Speed Networks Alan R. Whitney MIT Haystack Observatory Optical Waves: Who Needs Them and Why?
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
LBA05 ops meeting Tasso Tzioumis
Presentation transcript:

VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008

Operations - transitioning Evolution: – S2 tapes + LBA correlator - Stopped in –Disk-system + software correlator - Main user system –eVLBI - in development. Already offered to users. Software correlation –Contracted to Swinburne from 1 October 2006 (2 years) –Worked very well - no major problems –May substantially transfer to Curtin in 2008 Movement of key people Under negotiation with Swinburne & Curtin Public Wiki for all LBA observations –Schedules; setups; logs Remote VLBI observing tested - Mp fully remote

LBA Statistics 2007 Failures: Parkes: almost all due to high wind Ceduna & Hobart: Windstows and some power problems Tidbinbilla: Some config problems (personnel change) ** High success rate -- real-time fringe checking **

Network connectivity AARNet3 Regional Network to ATNF antennas –2 x 1 Gbps connectivity for each ATNF antenna 3rd 1 Gbps link for lightpaths to Europe (EXPReS) –10 Gbps (x multiple wavelengths) backbone Hobart 1 Gbps to UTas operating –Bass-Strait link still very limited. Correlator connectivity: –Swinburne 1 Gbps “almost” there (2 years….) –Curtin links planned –Good connectivity to Europe Data transfers disk-to-disk to Bonn correlator Have avoided disk shipping 1 Gbps lightpaths to Europe! (see eVLBI) Better international connectivity than within Australia!!

eVLBI - Oz developments Pk-At-Mp eVLBI Longbaseline Array (PAMELA) March initial development: –Parkes CPSR2 30-node cluster for software correlator –Successful test observations 256 Mbps –Limited observations with Hobart at 128 Mbps –Circinus X-1 detected at 18 & 3 cm -- Paper published within weeks!! Further developments : –Improved cluster connections - new nodes –512 Mbps capability developed & offered to users –1 Gbps tests successful (Pks-ATCA) In progress: –New APSR cluster to improve processing capabilities

eVLBI - International EXPReS tests: –July 2007: Mopra; Shanghai; European telescopes; JIVE hardware correlator Longest eVLBI baseline (Mp-Darnhall) Huge international publicity!! –October 2007: Mp-ATCA-Pks to JIVE 3 x 1 Gbps dedicated lightpaths! 12 hour hardware correlation at 512 Mbps Paper on SN1987A submitted!! Planned for June 2008: –ATNF antennas + Shanghai(China) + Kashima(Japan) –Correlation at Parkes on Swinburne software correlator Extremely valuable connections to networking world –Internet2 IDEA prize won!! (Shaun Amy) Science + Publicity!

LBA - Current Status User facilities: –Disk recording up to 512 Mbps / 1 Gbps (ATNF) May require justification for v. high rates Software correlation at Swinburne/Curtin –PAMELA eVLBI at 512 Mbps 1 Gbps tested but limited –Fast response ToO and NAPA proposals possible eVLBI (3 antennas) for quick look Disk recording for imaging Mk5b recording supported –International compatibility –Geodetic VLBI with all ATNF antennas (new) –LBA data can be correlated at Bonn!

ATNF operations model & VLBI Integrated scheduling with ATNF schedules Main impact from proposed restricted receiver changes at Parkes. –Loss of flexibility –Proper-motion projects (almost) impossible Move to shorter VLBI/eVLBI blocks? –minimise disk swaps & transfer over network? –Some issues with Tid scheduling last minute schedule changes/swaps? Cost and Impact of VLBI –Refer to future ops discussion forum submissions –