Cost Prof Unit I - Module 21 Costing Techniques The basic types of cost estimates.

Slides:



Advertisements
Similar presentations
Chapter 3: Cost Estimation Techniques
Advertisements

Maintenance Forecasting and Capacity Planning
Slides 13a: Introduction; Qualitative Models MGS3100 Chapter 13 Forecasting.
Project Cost Management Chapter 7
Copyright © 2009 Pearson Education, Inc. Chapter 29 Multiple Regression.
FTP Biostatistics II Model parameter estimations: Confronting models with measurements.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
The Comparison of the Software Cost Estimating Methods
PERFORMANCE MODELS Lecture 16. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability.
Fundamentals of Information Systems, Second Edition
Time and Cost Estimation
SDLC. Information Systems Development Terms SDLC - the development method used by most organizations today for large, complex systems Systems Analysts.
IE-331: Industrial Engineering Statistics II Spring 2000 WEEK 1 Dr. Srinivas R. Chakravarthy Professor of Operations Research and Statistics Kettering.
What is Project Cost Management?
Determining How Costs Behave
Copyright © 2007 Pearson Education Canada 1 Chapter 12: Audit Sampling Concepts.
COSTING GOVERNMENT GOODS AND SERVICES A Seminar by Dr. Clifford McCue Associate Professor School of Public Administration Florida Atlantic university.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Chapter 6 : Software Metrics
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Learning Objective 1 Explain the two assumptions frequently used in cost-behavior estimation. Determining How Costs Behave – Chapter10.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Project Cost Management
Cost drivers, cost behaviour and cost estimation
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Planning, Analysis, and Design Chapter 12.
Management & Development of Complex Projects Course Code - 706
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
Quality Software Project Management Software Size and Reuse Estimating.
Ch 6-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Project Cost Management
Disciplined Software Engineering Lecture #3 Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department.
Maintenance Workload Forecasting
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Chap. 5 Building Valid, Credible, and Appropriately Detailed Simulation Models.
MODES-650 Advanced System Simulation Presented by Olgun Karademirci VERIFICATION AND VALIDATION OF SIMULATION MODELS.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
Chapter 1 Introduction n Introduction: Problem Solving and Decision Making n Quantitative Analysis and Decision Making n Quantitative Analysis n Model.
Auditing: The Art and Science of Assurance Engagements Chapter 13: Audit Sampling Concepts Copyright © 2011 Pearson Canada Inc.
5 - 1 The Cost Modeling Process Chapter Introduction What makes a good cost model? – Good Statistics – Quality Data – Relevant Data – Analogous.
Analogy Technique Chapter Analogy - Method Comparative analysis of similar systems Adjust costs of an analogous system to estimate the.
(6) Estimating Computer’s efficiency Software Estimation The objective of Software Estimation is to provide the skills needed to accurately predict the.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
Building Valid, Credible & Appropriately Detailed Simulation Models
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Chapter 3: Cost Estimation Techniques
Determining How Costs Behave
Project Cost Management
Project Management – PTM712S
Project Management MGT 30725
Chapter 3: Cost Estimation Techniques
Chapter 7: Project Cost Management
Supply Chain Management for Non Supply Chain Management Professionals
Determining How Costs Behave
Estimating Project Times and Costs
Chapter 7: Project Cost Management
Estimating with PROBE II
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Cost Estimation Chapter 5
What is Project Cost Management?
© 2017 by McGraw-Hill Education
Building Valid, Credible, and Appropriately Detailed Simulation Models
Chapter 7: Project Cost Management
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Cost Prof Unit I - Module 21 Costing Techniques The basic types of cost estimates

Cost Prof Unit I - Module 22 Unit Index Unit I – Cost Estimating 1.Cost Estimating Basics 2.Costing Techniques 3.Parametric Estimating Unit II – Cost Analysis Techniques Unit III – Analytical Methods Unit IV – Specialized Costing Unit V – Management Applications

Cost Prof Unit I - Module 23 Outline Introduction Costing Techniques Using Costing Techniques Comparison of Techniques Summary Resources

Cost Prof Unit I - Module 24 Introduction The three essential cost estimating techniques (or methodologies) are: –Analogy –Parametric –Build-Up Other topics will be discussed in relation to the three essential techniques –Expert Opinion –Extrapolation from Actuals 11

Cost Prof Unit I - Module 25 Costing Techniques Analogy Parametric Build-Up Other Topics

Cost Prof Unit I - Module 26 Costing Techniques Overview Costing Techniques provide the structure of your cost estimate –They’re what enable you to predict future costs based on historical data –Techniques rely on statistical properties, logical relationships, and emotional appeal Three essential types –Analogy: “It’s like one of these” –Parametric: “This pattern holds” –Build-Up: “It’s made up of these”

Cost Prof Unit I - Module 27 Analogy - Method Comparative analysis of similar systems Adjust costs of an analogous system to estimate the new system Adjustments could be based on: –Programmatic information –Physical characteristics –Performance –Government vs. Commercial practices –Contract specifics –Economic trends 5 $ $ 3

Cost Prof Unit I - Module 28 Analogy - Application Used early in the program life cycle –Data is not available to support using more detailed methods –Not enough data exists for a number of similar systems, but can find cost data from a single similar system The best results are achieved when –Similarities between old and new systems are high –Adjustments can be quantified –Subjective adjustments are minimized Can be used as a cross check for other methods

Cost Prof Unit I - Module 29 Analogy – Advantages /Disadvantages Advantage –Can be used early in programs before detailed requirements are known –Difficult to refute if there is strong resemblance Disadvantage –Introduces subjectivity in the adjustment –Difficult to obtain cost/technical data on old/new systems for comparison –No objective test of validity

Cost Prof Unit I - Module 210 Analogy - Example AttributeOld SystemNew System Engine:F-100F-200 Thrust:12,000 lbs16,000 lbs Cost:$5.2M? Q: What is the unit cost of the F-200? A: $5.2M * (16,000/12,000) = $6.9M Tip: The mischief in analogy most often arises in the adjustment. Why do we so readily believe a linear relationship which passes through the origin? Warning 2: An adjusted analogy is, by definition, estimating outside the range of the data. Warning 1: An adjusted analogy is like a regression, but the slope is just a guess. 12

Cost Prof Unit I - Module 211 Parametric Estimating - Method A mathematical relationship between a parameter and cost –Parameter may be physical, performance, operational, programmatic, or cost Uses multiple systems to develop relationship Allows statistical inferences to be made Parametric could also be called Cost Estimating Relationships (CERs), Rates, Factors, Ratios Warning: Rates, factors, and ratios in use may not be statistically based.

Cost Prof Unit I - Module 212 Parametric Estimating - Application Use of Parametrics –Requires a good database which is relevant to the the system being estimated –Excellent for use early in program life cycle before a detailed design exists –Used as the design progresses to capture changes Good as a cross-check for other methods Warning: Be leery of estimating outside the range of the data. 4

Cost Prof Unit I - Module 213 Parametric Estimating – Advantages/Disadvantages Advantages –Can be easily adjusted for changes by modifying input parameters –Sensitivity Analysis - Can show how changes to certain parameters impact the cost –Objective measures of validity –Statistical measures for risk Disadvantages –Difficult to ensure consistency and validity of data –Must constantly review relationships to ensure that relationships reflect current status of relevant programs, technology, and other factors –“Black box syndrome” with pre-existing CERs, commercial models

Cost Prof Unit I - Module 214 Parametric Estimating - Example CER for Site Activation as a function of Number of Workstations: –Site Act ($K) = * Num Wkstn Estimated based on 11 data points for installations ranging from 7 to 47 workstations Example expanded in Module

Cost Prof Unit I - Module 215 Build-Up - Method Estimating is done at lower levels and results rolled up to produce higher-level estimates –Often the lowest definable level at which data exist Elements of this method could include –Standards –Time and Motion Studies –Well defined work flow –Variance Factors –Parts List –Lot Size and Program Schedule Considerations –Program Stage –Support Labor 11 Build-Up could also be called Engineering Build-Up, Industrial Engineering (IE), Catalog/Handbook 5

Cost Prof Unit I - Module 216 Build-Up - Application Used when you know detailed product information at the lowest level (i.e., hours, material, etc.) Used in a manufacturing environment where Touch Labor can be accurately estimated

Cost Prof Unit I - Module 217 Build-Up – Advantages/Disadvantages Advantages –Easy to see exactly what the estimate includes –Can include Time and Motion Study of actual process –Variance Factors based on historical data for a given program or a specific manufacturer Disadvantages –Expensive and requires detailed data to be collected, maintained, and analyzed –Detailed specifications required and changes must be reflected –Small errors can be magnified –Omissions are likely 6

Cost Prof Unit I - Module 218 Build-Up - Example Problem: Estimate hours for the sheet metal element of the inlet nacelle for a new aircraft –Similar to F/A –18 E/F nacelle which has a 20% variance factor (actuals to standards) and a support labor factor of 48% of the touch labor hours –The standard to produce the sheet metal element of the new inlet nacelle is 2000 touch labor hours Solution: Apply F/A-18 E/F factors to the standard touch labor hours –2000 hrs x 1.2 = 2400 touch labor hours –Add the support factor of 48% to get the total hours estimate of 2,400 x 1.48 = 3,552 hours 14

Cost Prof Unit I - Module 219 Other Topics Expert Opinion Extrapolation from Actuals

Cost Prof Unit I - Module 220 Expert Opinion - Method Uses an expert or a group of experts to estimate the cost of a system –One-on-one interviews –Round-table discussions –Delphi Technique Warning: Expert Opinion alone is not widely considered to be a valid technique Expert Opinion could also be called Engineering Judgment, Round Table, or Delphi Technique 1

Cost Prof Unit I - Module 221 Expert Opinion - Application Only used when more objective techniques are not applicable Used to corroborate or adjust objective data –Cross check historical based estimate Use for high level, low fidelity estimating Last resort Tip: Expert opinion is the least regarded and most dangerous method, but it is seductively easy. Most lexicons do not even admit it as a technique, but it is included here for completeness.

Cost Prof Unit I - Module 222 Expert Opinion – Advantages/Disadvantages Advantages –Good cross check of other estimate from Subject Matter Expert (SME) point of view –Allows perspective to an estimate that may be overlooked without SME Disadvantages –Completely subjective without use of other techniques –Low-to-nil credibility 8

Cost Prof Unit I - Module 223 Extrapolation from actuals is not a method, it is a subset of some methods –Using actual costs to predict the cost of future items of the same system Extrapolation is used in several areas, which include: –Averages –Learning Curves –Estimate at Completion Extrapolation from Actuals 15 Extrapolation from Actuals could also be called Averages, Learning Curves, Cost Improvement Curves, Cost/Quantity Curve, Estimate at Completion (EAC), and Earned Value (EV) 7 2

Cost Prof Unit I - Module 224 Extrapolation from Actuals - Application Best application is for follow-on production units/lots Requires accurate cost database –At an appropriate level of cost detail –Validate and normalize data 10

Cost Prof Unit I - Module 225 Extrapolation from Actuals – Advantages/Disadvantages Advantages –Utilizes actual costs to predict future costs –Can be applied to hours, materials, total costs –Highest credibility and greatest accuracy –Many government bodies require or encourage the use of this technique Possible complications: –Unknown events affecting bookkeeping of actuals –Changes in cost accounting methods –Contract changes affecting actuals –Configuration changes, process changes all have impacts Disadvantages: –Extrapolating beyond a reasonable range

Cost Prof Unit I - Module 226 Using Costing Techniques Estimate Requirements Top Down vs. Bottom Up Cost Element Structure (CES) Technique Selection Checking Results Documentation

Cost Prof Unit I - Module 227 Estimate Requirements Why are we developing this estimate? What will it be used for? –Milestone A, B, or C decision –Developing a budget –Developing a “ball park” or rough order of magnitude (ROM) estimate –Comparing alternatives –Evaluating proposals

Cost Prof Unit I - Module 228 Top Down vs. Bottom Up There are two general ways to structure an estimate –Top Down –Bottom Up Top Down is generally associated with the Parametric or Analogy techniques Bottom Up frequently uses more than one method at the lowest level but is generally associated with the Build-Up technique

Cost Prof Unit I - Module 229 Cost Element Structure Determine what needs to be estimated and develop an appropriate Cost Element Structure (CES) –CES Dictionary defines what is included in each element –Characteristics associated with cost elements that are routinely used to classify costs Program Phase: Development, Production, O&S “Color of Money”: RDT&E, Procurement, O&M Funding Source Non-Recurring or Recurring Direct or Indirect 1

Cost Prof Unit I - Module 230 Technique Selection Review available techniques Compare alternatives Select or develop appropriate technique Identify primary and secondary techniques Each costing technique has strengths and weaknesses and can be applied at different times in the life cycle of a cost estimate

Cost Prof Unit I - Module 231 Checking Results Cross Checking your results greatly increases credibility –Example: A parametric-based estimate can also show an analogy as a “reasonableness test” –Doesn’t necessarily result in the exact same number, but should be a similar number (same order of magnitude) An independent* estimate is more detailed than a cross check and attempts to get the same result using a different technique –Example: Use the results from one commercial software estimating package to validate the results of another *Note: “Independent” has many meanings. The most stringent meaning is in Title 10 USC Section 2434 and involves an organization out of the chain of command of the acquiring agency. A looser meaning is an estimate done by an organization unbeholden to the program manager in funding or accountability. The loosest meaning is a separate estimate.

Cost Prof Unit I - Module 232 Documentation Within reason, more information is better than less Any information that is used in the analysis must be included in the documentation Documentation should be adequate for another cost analyst to replicate your technique Like they used to tell you in math class…. If You Don’t Show Your Work, You Don’t Get Any Credit!

Cost Prof Unit I - Module 233 Comparison of Techniques

Cost Prof Unit I - Module 234 Comparison – Advocacy Advocates of Build-Up drink beer and say: –More detailed = more accurate –Analogy is prey to invalid comparisons –Parametric is too “theoretical” Advocates of Analogy drink bourbon and say: –Like things cost like amounts –Build-Up is prey to omission and duplication –Parametric is “diluted” by less applicable systems Advocates of Parametric drink wine and say: –Most thoroughly based on historical data –Analogy is just a one-point CER through the origin! –Build-Up is prey to omission and duplication Hey, it’s a joke, lighten up!

Cost Prof Unit I - Module 235 Comparison – Life Cycle Applicability Program Life Cycle Gross Estimates Detailed Estimates Analogy Parametric [Extrapolation From] Actuals Engineering [Build-Up] Concept & Technology Development System Development & Demonstration Production & Deployment Operations & Support Chart #300R4, Defense Systems Management College (DSMC), 2001

Cost Prof Unit I - Module 236 Summary You need to have all the costing techniques in your repertoire For each, you need to know: –What it is –When to apply –How to execute –Strengths –Weaknesses

Cost Prof Unit I - Module 237 Resources Chart #300R4, Defense Systems Management College (DSMC), – Joint Industry/Government Parametric Estimating Handbook, Second Edition, Spring –co-sponsored by Defense Logistics Agency (DLA), Defense Contract Management Command (DCMC) (now Defense Contract Management Agency (DCMA)), and Defense Contract Audit Agency (DCAA) –