Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Slides:



Advertisements
Similar presentations
Star kW NEW. Star kW Star kW Instantaneous wall-hung gas boilers Conventional flue Sealed room fan assisted NIKE Star 23 kW EOLO Star 23 kW.
Advertisements

Pre Sales Dept. HERCULES Solar 26 1 A Condensing floor-standing boilers with built-in solar circuit.
1 Adaptive Thermostat With Bluetooth Technology Trey Lawrence Jennifer Ogunlowo Scott Snyder Mark Youngblood ECE4007L02, Group 7 Georgia Institute of Technology.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Software and hardware complex of experimental plant for pulp and paper production Master student of MMA department : Anton Kaverin Perm National Research.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Group 6 John Blackburn Steve Johnson Anish Raj Pant Devin King Sponsored by BCI Technologies.
Project Summary. Mission Statement To develop a Volumetric Flow Sensor to measure the volume of gas flowing through a quadrant and into the combustion.
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. PUBLIC PUBLIC CO900G L04 - Basic PLC Programming with Micro800 ® Controllers.
Wireless Data Acquisition for SAE Car Project by: J.P. Haberkorn & Jon Trainor Advised by: Mr. Steven Gutschlag.
Reflow Oven System Ryan Kennedy ELT2720 Project 2008.
ASPPRATECH.
Module 2: Hardware and Terminology
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
RPC «REGMIK» 15582, Ukraine, Chernihiv region, Rivnopillya, Gagarin Street, 2B phone.: +38 (0462) , , , , +38 (050)
SCADA and Telemetry Presented By:.
Viking Pump Flow Manager - Phase 2 Senior Design May
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
Water Management System With Gallery Gardner Water Management System: In first part, the project senses the level of water in the tank available in high-rise.
Rural Drinking Water Treatment System. INTRODUCTION Water demand Identification of water source Drinking water Quality Parameters Required treatment system.
PROFACT AUTOMATION SOLUTIONS. TEMPERATURE MONITORING & CONTROLLING INDUSTRY  Steel Industry  Chemical Industry  Oil & Gas  Beverages  Sugar  Pharmaceutical.
Project Overview.  Problem Statement  Constraints  High-level Design  Roles  Expected deliverables  Possible Issues.
WELCOME TO THE TECHNICAL PRESENTATION OF SC100 1.
MICRO CONTROLLER MODULE 1. Learning Objectives Name some gadgets that use microcontrollers. Define a microcontroller. Differentiate between a computer.
R.O.M. System Team: RISC Takers Team Members: Paul Banks, Yorick Robinson, Evan Tu, & Hans Weggeman Louisiana State University – Senior Design October.
ATM 2012: Automation Training Module William R. Hentschel, Aaron Palmietto, Scott Puckett, Cassandra Sattler Undergraduate - Texas A&M University at Galveston.
Hypothetical day with and without Grid Net Controller: Wind turbine generates 7.5kW for first ½ of day, and 1kW for second ½ of day Utility does not pay.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Team 15. Code Modules Web Server Interface and Operating Parameters Chemical Level Detection Calibration Routine Adjusting Agent Calculation Chemical.
SAFETY Laborers Suffering & Pain Amputation Loss of Life Wages Lost Supervisor Loss of prestige Loss of employee Loss of moral More supervision Management.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ECE 3331 Project Lab I Lab Projects and Presentations 1.
11. 2 Steam Energy Energy that comes from the push of steam.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Prepared by: Engr. Qurban Ali Memon 11ES (SEC- 1 & 2)
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
HVAC Wiring diagram 5 channel output (5A relay) Speed: High/Medium/Low Mode: Cooling / Heating /Dehumidifier HVAC is a module specially for Air Conditioner.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
11/26/2008 Utility Water Hydro-Pneumatic Tank System & Recovery.
Student’s Name with USN No.
Aircraft Carrier Draft Measurement Ship Draft Team - Fall 2015.
Group 8 Anthony McCorvey Ronnie Lalchan Chris Beck George Thompson.
GOVERNMENT POLYTECHNIC RAJKOT 1 NAMEEN.NO. TADVI PRAGNESH A PATEL ANKIT D PATEL VIRAL S PATEL JAYESH M
Oel-Wärme-Institut gGmbH, Aachen Characterisation and reduction of electrical consumption of central heating systems and components WP 1: Development of.
Simple Water Level Controller Circuit with Microcontroller and Alarm.
Solar Patio Umbrella Final Presentation May 3 rd, 2016 Team #37 ECE 445 – Spring 2016.
Status Report 7-Group 8 Sid Munshi Gabriel Castillo Jeff Burg Fahim Peermohammad The Intelli-Home October 10, 2006 The design of a control system for an.
Deep Touch Pressure Abdomen Belt Group 32 Kevin Rathbun & Luke Fleming & Chang-O Pyo ECE 445 Senior Design April 28, 2015.
ADVANCED WATER LEVEL CONTROLLER
Alice TOF Production Readiness Review Gas Control Systems.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
PROCESS INSTRUMENTATION Introduction to ISA Symbology
S.T.B.S COLLEGE OF DIPLOMA ENGINEERING
How SCADA Systems Work?.
Automatic heat source finding laptop cooling pad By Team 26
PLC BASED AUTOMATION OF FUEL OIL PUMP HOUSE DRIVES IN TPS-2
LEVEL CONTROL USING ULTRASONIC
Power Block Implementation
Lego EV3 Mindstorms SW Programming Blocks.
Electrical traditional Chinese Instrument - Xun
Prepared by : TOLERA TAMIRU SAMSON NIGUSE Microcontroller based Fire Fighting Robot.
Class Tasks Q1: Water flows into a process unit through a 5-cm ID pipe at a rate of 4.00 m3/h. Calculate Ėk for this stream in joules/second. Q2: Water.
Presentation transcript:

Name: Hussain Abbas Qassim Ashoor ID: Supervisor: David Krause Senior Project 2014

Index Project objectives Introduction Tasks reviews Gantt Chart Difficulties and recommendations

Project objectives Making a prototype to demonstrate a separation system plant. Implementing what was learned Designing a PCB circuit Write a PLC code program and Mbed

Introduction The project idea Company conflicts Improving the project idea

PFD (Process Flow Diagram)

Oil Well Pump Oil Well Pump is a part of the gas separation system and operated by Tatweer Petroleum.

Separation system plant Where the gas separates from oil and sent to stores.

Stores Here were stores the oil and gas to be deliver to the Companies Banagas Store Bapco Store

Boiler Boiling the un wanted water

Company conflicts PLC used in the Company is Rslogix 500 There are no budget Limited equipment No workshop in the Company for students

Improving the project idea Simulation Mbed program Ultrasonic sensor, Temperature sensor, Level sensors and Gas sensor Control panel and SCADA program.

Planning Solid works Designing any mechanical part Ms Visio Designing the PFD process flow diagram MS project Doing the Gantt chart (what to do) Ms Power Point Designing the Control Panel

Boiler Tank Designed at Solid Works Built in Building 34

Ventilation 3D Concept

Control Panel 25 %

Building (Fabrication)

7-segment circuit

Mbed, Comparator and switch regulator Circuit

PCB

Relay Circuit and PCB

PCB before soldering

PCB soldered

Relay PCB in the project

Connection and teaching mode

Programming PLC Program (RSlogix5000) Mbed Program (Micro Controller) Factory Talk View (SCADA)

Separation System Block Diagram Control Panel SCADA Fans Pumps LCD Level Sensor Ultrasonic Sensor Temperature Sensor 7-segment Buzzer PLC Mbed

SCADA Stands for (Supervisory Control and Data Acquisition)

MS Project

Old Gantt Chart

New Gantt Chart

Difficulties Recommendation The company conflicts Building the project on my own budget Ultrasonic sensor Using better PLC module which could produce more than 205mA Adding various sensors such as (pressure sensor and flow meter), also use better equipment to make the project with high quality