National Approach and Experience on Disposal of Intermediate Level Waste in the Russian Federation A. Smetnik FSUE VO “Safety” Vienna, 9 – 13 September,

Slides:



Advertisements
Similar presentations
Swiss Federal Nuclear Safety Inspectorate (HSK) Nuclear Waste Management in Europe – and the Swiss Model EPP-ED Hearing on the Future of Nuclear Waste.
Advertisements

Albania Good practices and Gaps 13 December 2013.
Nuclear Energy Chapter 12. Introduction to the Nuclear Process Fission – nuclear energy released when atom split, conventional technology Fusion – nuclear.
Radioactive waste : Stakes and debates Laurence CHABANNE-POUZYNIN General Counsel Public, Nuclear and Evironmental Law Department INLA Buenos Aires,
National Statement Country II. Current Status of the Country 1. Nuclear power stations are not planned in the county. 2. Widespread of SRS for industrial.
Radioactive Waste Arising, Waste Classification, and Safety Requirements for Waste Disposal Day 9 – Lecture 6.
“Current situation in Argentina related to management of Radioactive Waste and future plans for disposal” Daniela E. Alvarez Ph D. Department of Scientific.
Safety and Security Aspects of the Management of High Level Waste and Spent Fuel Ramzi Jammal Executive Vice-President and Chief Regulatory Operations.
Dounreay Nuclear and Chemical Land Contamination.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
Nucular Waste A Technical Analysis Ian Baird 5/12/08.
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
CHEMISTRY TASIA MILLER. Nuclear: operated or powered by atomic energy Waste: to destroy or consume gradually Disposal: a disposing of or getting rid of.
1 RADIOACTIVE WASTE MANAGEMENT (PART 4) A RAHMAN RWE NUKEM Ltd (UK) Name, company and chapter.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Fuel Cycle – High Level Waste Disposal
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
TM Technical Meeting on the Disposal of Intermediate Level Waste
Radioactive Waste Arising, Management Options and Waste Classification
IAEA International Atomic Energy Agency David Bennett (David 14 – 18 December 2014 JAEC, Amman, Jordan National Policy and Strategies.
Nuclear Energy. The Nearest Nuclear Power Plant DTE Fermi II is just about 40 miles from us.
Session III Waste Management Policy - Perspectives Chairman: Piet Bredell (ZA) Rapporteur: Peter Lietava (CZ)
Experimental Research on Nuclear Waste Disposal (ERNW) Radioactive Waste Management in France Alexis BOURDEAUX, France Wednesday 19/05/2010.
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Reprocessing in the U.S.: A Waste of Time Edwin S. Lyman Senior Staff Scientist Union of Concerned Scientists July 20, 2009.
International Atomic Energy Agency IX.4.1. Sources of radioactive waste Waste types, waste classification, waste characterization.
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
Source Control Phases I-II: Source Control Phases I-II: Main findings  Facility: drinking water and sewage treatment utility in Apatity, Murmansk region,
11 The legal framework on the disposal of intermediate level waste in Russian Federation Scientific and Engineering centre for Nuclear and.
4/2003 Rev 2 I.4.9j – slide 1 of 18 Session I.4.9j Part I Review of Fundamentals Module 4Sources of Radiation Session 9jFuel Cycle – High Level Waste Disposal.
IAEA International Conference on Management of Spent Fuel
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
State Nuclear Regulatory Committee of Ukraine State Nuclear Regulatory Inspectorate of Ukraine Safety of radiation sources Unit of Radiation Safety.
Clear thinking on Nuclear: Waste disposal 1.One site for high-level radioactive waste is easier to monitor, regulate, and secure 2.A repository will provide.
The Federal State Unitarian Enterpise «RosRAO» - Russian RW management operator , Moscow, Russia, Bolshaya Ordynka, 24/26
Safety-related Issues for the Disposal of Intermediate Level Waste (ILW) Dr. Jürgen Wollrath Federal Office for Radiation Protection (BfS) Department Safety.
Waste and site related issues Fredrik Vahlund SKB.
International Atomic Energy Agency IX.4.2. Principles of radioactive waste management Basic technical management solutions: concentrate and contain, storage.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
Introduction Radioactive waste in Iraq arises mainly from decommissioning of destroyed nuclear facilities and waste related to previous nuclear research.
بسم الله الرحمن الرحيم الهيئة العربية للطاقة الذرية ورشة عمل حول ادارة النفايات المشعة والتخلص الامن منها Workshop on Management and Safe Disposal of Radioactive.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
CLASSIFICATION OF RADIOACTIVE WASTE Daniela E. Alvarez Ph. D
Presented By RENJINI CHANDRAN. The nuclear wastes are radio- active substances which are released from atomic reactors of nuclear power stations. When.
Nuclear waste management Russian experience and new reactor deals
Status of national system for control of radioactive sources: Libya
DEVELOPMENT OF DEVICES FOR WORKING WITH BN-350 RADIOACTIVE WASTE «Nuclear Power and Energy Security (NPES 2009)» IV NATO Advanced Research Workshop.
REGULATORY REQUIREMENTS FOR HANDLING RADIOISOTOPE Mohd Abd Wahab Yusof (Dr) Malaysian Nuclear Agency.
BASIC PROFESSIONAL TRAINING COURSE Module XIX Waste management Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and.
Safety of radiation sources
Management of RS/DSRS in Brazil Ademar José Potiens Júnior
Management of Radioactive Waste
Back-end options for a small country with long term nuclear program
ENVIRONET Plenary Meeting Vienna, Austria, 5 – 7 December 2017
Ministry for Emergency Situations
Jiří Slovák, Vítězslav Duda
Radioactive Waste and Spent Fuel Management in Hungary
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
Current Radiation Protection Legislation in Slovakia
Approaches to Evaluation of Spent Nuclear
Presentation transcript:

National Approach and Experience on Disposal of Intermediate Level Waste in the Russian Federation A. Smetnik FSUE VO “Safety” Vienna, 9 – 13 September, 2013

2 RW Generation Sources The RW generation sources in the Russian Federation are: mining and processing of radioactive ores; fabrication of nuclear fuel; operation of NPPs, nuclear research facilities, nuclear fuel cycle (NFC) enterprises, vessels with nuclear power units and their maintenance bases; SNF reprocessing; use of NM, RS and ionizing radiation sources (IRS) in industry, medical institutions, research institutes etc.; decommissioning of nuclear facilities and rehabilitation of areas contaminated with radioactive substances.

3

4 Radioactive waste reprocessing Re-melting — Ecomet-S (SRW, LLW; 2,000 tons/year), Vitrification — PA Mayak (LRW, HLW; l/h) SUE MosNPO Radon (LRW, ILW; 200 l/h), Incineration — SUE MosNPO Radon (LRW ILW; 20 l/h; SRW ILW; 60 kg/h) Cement solidification — at NPPs, a standard facility (LRW, SRW, ILW; 255 m 3 /year) Over 90 facilities for reprocessing of different types of radioactive waste are in operation, for example:

5 Radioactive Waste Inventories As of the end of 2010, a total of: over 486 mln m 3 (4.27·10 19 Bq) of liquid radioactive waste (LRW), and 87 mln tons of solid radioactive waste (SRW) (3.59·10 19 Bq) were accumulated.

6 RW Generation in 2010

7

8 RW Placement and Storage All RW is placed in 1,466 temporary storage facilities at 136 enterprises located in 43 regions of the Russian Federation, and 3 disposal facilities of liquid radioactive waste (under continuous monitoring) in deep geological formations. A large amount of intermediate-level LRW (89%) is consolidated at Siberian Chemical Combine (SCC), Mining and Chemical Combine (MCC), Research Institute of Atomic Reactors (RIAR) and is isolated from the environment in deep geological formations.

9 Fuel Cycle and Disposal Facilities

10 National Operator for RW Management After the Federal Law No. 190-FZ "About Radioactive Waste Management…" ( ) has been enacted, it is only the National Operator for RW Management (FSUE "NO RAO") that is authorized from 20 March 2012 to dispose radioactive waste at the territory of Russia. At present FSUE "NO RAO" has only started to establish its own infrastructure to enable acceptance of radioactive waste for disposal.

Activities of the National Operator Национальный оператор Provides operation of disposal facilities Ensures safe management of waste accepted for disposal Maintains the state register of radioactive waste and state waste inventory of storage facilities Prepares forecasts for RWM infrastructure development and volume of the wastes to be disposed Serves as the customer’s design and construction of waste disposal facilities

Duties of the National Operator Национальный оператор To perform radiation monitoring of disposal facilities, including post-closure period To accept from RAW producers RAW meeting the WAC and paid in the prescribed manner To provide information on the activity of the National Operator upon request To transfer funds to the RF when receiving wastes from irregular waste producers To ensure fire & radiation safety, sanitary-epidemiological well-being of public during operation and post-closure period

13 Thank you for your attention! Thank you for your attention!