Accessibility Unlocking London for All Christopher Upfold Accessibility and Inclusion Manager London Underground.

Slides:



Advertisements
Similar presentations
PPPs and Affordability
Advertisements

Tackling the Environmental Impact of Transport Presentation by David Jamieson MP to the Institute for Public Policy Research Wednesday 15th October 2003.
Bus Driver Training & Big Red Book Simon Wallis Operator Staff Development Manager Transport for London - Buses.
Get Started in e-Business. Aim This presentation is prepared to support and give a general overview of the ‘How to Get Started in e-Business’ Guide and.
UIC Oelschläger Genève V /11/2009 Rail Travel for Persons with reduced Mobility (PRM): Service Provider Views Dirk Oelschläger Senior Advisor Passenger.
The Future of Libraries Speak Up For Libraries conference Saturday 10 th November 2012.
Constructing Mobility Futures: The Case of HS2 Murray Goulden Robert Dingwall 1.
An Investigation of Ebook Lending in UK Public Libraries Christopher Gibson Department of Computer and Information Sciences University of Strathclyde
Adrian Cook, Group Head of Procurement
May 3, Northern line upgrade Merton Public Transport Liaison Committee Meeting 26 October 2010.
The Legal requirements Ann Frye, Chair, ECAC Sub-Group on PRMs
AMEU Convention Durban 16 October 2007 ESKOM UNIVERSAL ACCESS TO ELECTRICITY BUSINESS PLAN Anton Theron Peter Sebola.
Civil Engineering in Surface Transport Mark Dewhirst and Alex Wilson Engineering Graduate Forum – 1 st July 2011.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
Company LOGO Publishing Project Management from Pro tem. Publishing Services Independent multi-channel management services to help businesses improve cost.
The Equality Act 2010 and Accessibility of lifts for disabled users.
Return of the Large Data Center. Computing Trends Computing power is now cheap, power hungry, and hot. Supercomputers are within reach of all R1 universities.
SUBCONTRACTING TRENDS AND DIFFICULTY. Outsourcing is more complex and risky if the outsourcer (the prime contractor) outsources to subcontractors or utilizes.
ACT CANADA 2014: Using Business Cases To Get Great Projects Financed and Delivered December 1, 2014| Michael Sutherland.
Independent mobility through the use of scooters Transport options for disabled people.
Disability Discrimination Act Duties on Schools. Disability Discrimination Act 1995 duty not to discriminate against disabled people in relation to employment.
Does the Disability Discrimination Act (DDA) include websites? Matthew Eaton Accessibility Specialist.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
The UN Convention and the National Disability Strategy Eithne Fitzgerald Head of Policy and Public Affairs.
Jaspal Dhani, Chief Executive. Presentation aims: Facts and figures about disable people Definitions of disability Providing accessible.
16 October Transport in Merton Youssef Cockbaine.
Mace Group Public Private Partnership. Then: Mace was founded in 1990 Today: Mace is one of the largest international project and construction management.
CROST FOR LONDON Presentation to GLA and TfL Thursday 4th Dec. By CROST Group.
Economic Development and Meeting Business Needs Sophie Tyler & Giles Semper Oxfordshire County Council LTP Consultation Workshop 2: 14 October 2009.
Traditional Approaches to Facility Layout
Lease Reform. I wish someone would….. Cut down the paperwork I have to do to submit an offer DONE!!!
PPP in the UK Ian Rylatt, Chief Executive Officer, Balfour Beatty Investments.
Access for All programme – an overview. Slide 2 Background Disability Discrimination Act 1995 (DDA) requires all station operators to take reasonable.
Social investment and SHARED LIVES
The Emission Control Challenge Glenn Edge 17 July 2007.
THE SPECIAL EDUCATIONAL NEEDS AND DISABILITY ACT SENDA.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Software Estimation and Function Point Analysis Presented by Craig Myers MBA 731 November 12, 2007.
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – EU practices and policies for the inclusion.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
European Commission 1 By Sue BIRD European Commission, DG Employment, Social Affairs and Equal Opportunities Brussels, 17 December 2008 CECOP – CICOPA.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
10 Railway Parade Penshurst NSW 2222 p: e: 1 Strategic Direction.
Why legislation is not enough… What this presentation aims to do… Brief overview of legislative framework Brief discussion on why this is not enough to.
ACHIEVING ACCESSIBILITY IN THE BUILT ENVIRONMENT FOR ALL Lee Wilson, Thursday 8 October 2015 Universal Design Meets the Exit Sign The Accessible Exit Sign.
Project management Topic 4 Starting up a project.
Inclusive Tourism Slides
Five Year Forward View: Personal Health Budgets and Integrated Personal Commissioning Jess Harris January 2016.
Improving Purchasing of Clinical Services* 21 st October 2005 *connectedthinking 
CS223: Software Engineering Lecture 16: The Agile Methodology.
Social Benefit Bonds (SBBs): Supporting innovative programs to reduce the number of children and young people in care Sally Cowling UnitingCare Children,
Santander Cycle Hire Presentation by: David Eddington Cycle Hire Operations Manager Transport for London.
DDA The Equality Act 2010 (Disability) & The Safety Professional Ian Streets NRAC Auditor About Access Ltd.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
Parves Khan Andrew Gostelow 7 October 2009 Tourist Information provision A national economic impact review Tourism Management Institute National Conference.
0 Putting People First Housing and social care – working together to deliver personalisation May 2009.
Over The Horizon – Mauritius Founder/ Managing Director : PUSHPA RAO.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
1 Team Skill 4 Managing the scope Noureddine Abbadeni Al-Ain University of Science and Technology College of Engineering and Information Technology Based.
An Introduction to Procurement
Introducing an inclusive procurement strategy
Aid Transparency Assessment
Maintenance BC - NZTA assessment in TIO
Waltham Forest Mini Holland
Step Free Access Programme
Update on Accessibility and Transport
The SWA Collaborative Behaviors
Project Resource Planning
Human Rights Prejudice and Discrimination Key Words:
Presentation transcript:

Accessibility Unlocking London for All Christopher Upfold Accessibility and Inclusion Manager London Underground

Profile of our Disabled Customers Step-Free Network –The past –The present –The future Constraints Our Customer Requirements Procurement Conclusion Agenda

15-20% of Londoners are disabled 500, ,000 Londoners have a Mobility Impairment – ,000 Londoners significant difficulties with steps –35-40,000 wheelchair users in London –4-6% of LU customers have medium or heavy luggage –2-3% of LU customers use a stick or walking aid 100, ,000 Londoners have a Visual Impairment –4,000 are guide dog users 500, ,00 Londoners have a Hearing Impairment Disabled people spend £45-50 billion / yr in the UK Who are our Disabled Customers?

Disabled People - Ability to Travel - All Same research shows ~ 40% all disabled people (walking, hearing, seeing, understanding) are totally unable to use the Tube

Accessibility Strategy - “Unlocking London for All” LU commitment to accessibility including core network of step-free stations First published – 2002 New version of strategy this summer

Why Improve Access? It’s the Law (Disability Discrimination Act ) DDA Part III –Since October Compels service providers to take reasonable efforts to overcome physical obstructions which make it unreasonably difficult for a disabled person to use a service –From 2006 Public Authorities have duty to promote equality It makes business sense It’s the right thing to do Our stakeholders demand it (not an option)

Step-Free Network  45 stations are presently “step-free” out of 275  Current step-free plans and works −5 stations delivered in last 2 years –5 projects on site –16 step-free stations through PPP –London Underground responsible for rest Many more stations for adequate step-free network –Outline plan (“Unlocking London for All”) in place –Aspirations to expand - detailed planning being done –Aspirations estimated to cost £1.5 bn+ (£100m / yr for 15 yrs) –Must deliver origins and destinations customers want / need

Step-Free Aspirations Attempts to strike balance between complex central stations and less complex outer stations to deliver a high proportion of step- free trips Network selection agreed to 2013 – 47 additional stations Aspiration to expand step-free provision to 50% stations by 2020: more than 45 stations on top of 2013 Approximately lifts Cost estimated to be £1.5bn+ spread over years Serious engineering considerations and constraints

Step-free Network

Step-free Network

Step-free Network

Step-free Network – 2020?

Step-Free Constraints Very expensive (in time and money) Complicated station geography Very limited space – for access and on platforms Limited scope for station closures Legacy problems with platforms and building fabric

Station Example - Clapham South

What we will require from lifts Same as everyone else – good accessible design …but also… Reliability –Very few lost hours –Maximum cycles per day –Ease of fault rectification Minimal footprint (maximum interior space)

Reliability Space for a single lift –No redundancy Current reliability ~98% Each lift out of service ~100 hours / year Confidence is critical for disabled people Lifts often used continually –Need to be in service 20 hrs / day –Heavy and bulky bags –Minimal overnight time for maintenance Ease of fault rectification

Minimal Footprint Space on platforms often very constrained Millimetres make the difference –Some platforms only 6-8 metres wide –<2.5 metres between lift and platform edge – safety risk –2 metres has been accepted in some locations Still needs to be big enough to handle wheelchairs –Which are getting larger and larger…

Procurement Options Directives 2004/17/EC & 2004/18/EC apply –Even greater obligations in UK and London –Accessible design integrated into first principles 1.PPP contract for some lifts (30 year contracts) –Although only 16 stations in the contract –Even those companies will still need to purchase from lift suppliers 2.Purchase indirectly through 3 rd party (company construction scheme) 3.London Underground purchase directly and provide to 3 rd party

Conclusion London Underground embarking on large expansion of step-free station Expansion will require hundreds of new lifts –Cost of lifts marginal compared to cost of programme –3 options for procurement Only space for 1 lift in most circumstances –No built in redundancy –Each lift critical to step-free route through station High Reliability Crucial