Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
0ATLAS Pixel Mechanics meeting at LBNL 13 April 2000 P.Netchaeva, INFN/Genoa Study of bump stresses The aim of this study is to check the effect of stresses.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
M. Gilchriese Update on Pixel Prototype Mechanics/Cooling Structures at LBNL February 1, 2008 M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese and.
I T i womiller VG1 Meeting UCSC November 10, 2005 ATLAS Upgrade Workshop Silicon Tracker Stave Mechanical Issues.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Mechanics and Cooling of Pixel Detectors Pixel2000 Conference Genoa, June 5th 2000 M.Olcese CERN/INFN-Genoa.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
M. Gilchriese ATLAS Upgrade Mechanics/Cooling and System Design by LBL January 2008.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
VELO Module Kickoff Summary Richard Plackett – VELO Pixel Chip Meeting CERN, 13th November 09.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Low Mass Rui de Oliveira (CERN) July
The Mechanical Structure for the SVD Upgrade
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
GIGATRACKER SUPPORTING PLATE COOLING SYSTEM SIMULATION 1Vittore Carassiti - INFN FECERN, 11/12/2007.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
9 December 2011Eddy Jans 0 LHCb-VELO CO 2 cooling plans CO 2 - meeting Present VELO - physics running in LongShutdown1 2013& physics running.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Detector building Notes of our discussion
T. Bowcock University of Liverpool
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
Simulated vertex precision
Vertex Detector Mechanical R&D Design Questions and Issues
Strawman module design
WG4 – Progress report R. Santoro and A. Tauro.
Hybrid Mechanical/Thermal Design ideas
Presentation transcript:

Velo Module 0 minus minus Paula Collins

Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s Modulus) Can the elements stand the strain? What about the bump bonds? What about repeated thermal cycling (-40 →+20 o C)? Is the thermal performance in vacuum as expected? Different approaches are possible to optimise (flexible glue, splitting silicon into smaller pieces) Kapton: C -1 Silicon: C -1 Diamond: C -1

Thermal Performance and Simulation Power consumption varies as a function of lifetime ~ constant in chips: 0.5-? W/cm 2 Silicon rises to ~ W/cm 2 in the part most remote from the cooling See presentations of Steve Blusk and Brian Maynard from upgrade meetings for more details

Ultimately the cooling attachment will be a huge challenge Second stage of mechanical tests would be to investigate different methods of cooling pipe attachment Could be clamped between additional diamond pieces Or could go for ATLAS style approach: use RVC foams to couple round metallic tube to rest of structure Use of small glass capillaries has been suggested by Nikhef 2 diamond pieces Enclose in CF frame Cooling pipe around the edge Or One TPG core large hybrid? Bus cable Hybrids Coolant tube structure Carbon honeycomb or foam Carbon fiber facing Readout IC’s Silicon sensors

Properties of Thermal Grease Extensively studied for ATLAS and CMS upgrade (both strips and pixels) >8 different compounds tried by ATLAS (dow corning, wlpg, cgl 7018 etc pdf pdf Example candidate for foam development is Allcomp, Inc but lots of R&D even for non vacuum environments – lowering density of graphitic foams, increasing density of RVC foams etc. etc. No need to reinvent the wheel, but have to try things out in our scenario…

Some strain could be taken up in the glue “ Fluid Glues” exist and can be tried: Dow Corning 734RTV (tens. strength= 16 Kg/cm 2, 321% elongation, CTE~ C -1, e r ~2.5, dielectric rigidity~18KV/mm Epotek 353ND (flex. strength= 750 Kg/cm 2, CTE= C - 1, viscosity = 2000 cps) Other things to watch for: radiation resistance, outgassing properties, thermal conductivity In view of the cost of the diamond.. Dismountable tests? Maybe a hard glue needed for a one sided firm connection e.g. cyanoacrilate.

CERN interest We are interested in procuring piece(s) of diamond from Diamond Materials and testing various aspects of the module 0 construction. The initial try for the shape would be the rectangular 3x2 chip piece, plus a margin on 3 sides to allow for potential cooling pipe attachment Initial thickness: 200 micron Interest in mechanical and electrical tests 7

Vacuum test stand development Raphael Dumps Vacuum test stand essential for LHCb (and possibly other groups) Design is in progress Incorporate germanium window and camera Position measurements Peltier cooling High speed feedthroughs Inerchangeable flanges for testing different modules 8

Mechanical tests Verify planarity and surface roughness of diamond Use of scanning EM at CERN metrology department Populate with 6 pieces of silicon and heater chips (total thickness 300 micron), and temperature measuring sensors First cooling try to tie back edge and sides to a plate of fixed temperature Later can try various methods of attaching cooling pipes and mount in vacuum tank Heat with various powers, and cooling temperatures and compare the temperatures achieved with the thermal simulations Practice measurements of temperature with the thermal camera and deflection Thermally cycle and check for damage If severe deflections are seen, we possibly can try to attack this with structuring the diamond (e.g. grooves) CERN has measurement devices for cryogenic tensile testing 9

Stage 0 minus one test 300 um thick silicon piece glued onto diamond and instrumented with smd components to allow uniform and non uniform heating Glued to diamond cooling plane Loosely clamped with a lot of thermal grease to Peltier cooled heatsink Possibility to mount assembly inside vacuum tank

Electrical tests One piece of diamond to be instrumented as a timepix readout See if a standard timepix planar silicon assembly can be read out via diamond metallisation lines Check on issues such as metal deposition, reliable attachment of connectors, bonding issues, and thermal interface To be done in collaboration with CERN PCB workshop Device can go to testbeam and also be irradiated First step will be to thermally cycle and check bump bond integrity 11 LHCb VELO Upgrade Meeting April 14 th Paula Collins

Irradiation tests (Phil, Jan, Maurice) Diamond pieces are being irradiated The evolution of the thermal conductivity will be checked A number of samples will be irradiated in parallel and removed after a certain time The performance will be calibrated against a non-irradiated piece 12 LHCb VELO Upgrade Meeting April 14 th Paula Collins