March 26, 2014 Space Weather Product Team (SWPT) Kick Off Meeting.

Slides:



Advertisements
Similar presentations
A Search for Earth-size Planets Borucki – Page 1 KEPLER; Data Validation and Follow Up Observations CoRoT Symposium W.J. Borucki & the Kepler Team 5 February.
Advertisements

GOES-R Instrument Operations Tim Walsh GOES-R Flight Project January 2008 GOES User’s Conference.
Lightning Imager and its Level 2 products Jochen Grandell Remote Sensing and Products Division.
Jeffrey Kronenwetter PLT Director PLT Coordination & Field Campaign Preparations.
GOES-R Space Weather L2+ Algorithms GOES Science Week William F. Denig, Chief Solar & Terrestrial Physics Division NOAA/NESDIS/NGDC
GOES-R Program Calibration and Validation Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (1), Steve Goodman (2), Changyong Cao (3), Jaime Daniels (3),
Algorithm Working Group Space Weather Team Activities and Plans S. Hill, H. Singer, T. Onsager, R. Viereck, D. Biesecker, C. Balch – NOAA/NWS/NCEP/SEC.
National Weather Service Space Weather Products in AWIPS2 Steven Hill, NOAA/SWPC SWPC: Chris Lauer, Ratina Dodani, Kelvin Fedrick, Mike Carpenter, Ann.
GOES-R Space Weather L2+ Algorithms GOES-R3 Review William F. Denig, Chief Solar & Terrestrial Physics Division NOAA/NESDIS/NGDC
1 GOES-R Calibration Working Group (CWG) June 16, 2010 Presented By: Changyong Cao 1 NOAA/NESDIS/STAR CWG Progress Update.
Bob Iacovazzi Jr. September 20, 2011 GOES-R GLM Calibration GLM Science Meeting 2011.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC2 Closeout Meeting 2 June, 2006 S. Ritz Gamma-ray Large Area Space Telescope.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
Calibration Working Group L1b Cal/Val Update 1 Presented by Changyong Cao NOAA/NESDIS/STAR GOES-R Calibration Working Group January 9, 2014.
July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.
NOAA Satellite Science Week 2015 Bob Iacovazzi GOES-R Cal/Val Coordination Team (CVCT) Lead February 23, 2015 GOES-R Cal/Val.
RBSP-ECT Suite Status: Instrument Status and Instrument Operations Flexibility Harlan E. Spence on behalf of RBSP-ECT Team University of New Hampshire.
GOES-R Satellite Proving Ground and User Readiness Meeting May 17-19, 2011 Boulder, CO E. J. Rigler, J. Vickroy, M. Shouldis, T. Loto’aniu, J. Rodriguez.
Bob Iacovazzi, Jr. GOES-R POSST Ops Manager (POM) January 9-10, 2014 GOES-R Product Operations Science Support Team: Planning for GOES-R Cal/Val AWG Second.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
GOES-R Program Calibration and Validation (Cal/Val) Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (2), Steve Goodman (1), Changyong Cao (3), Jaime Daniels.
Multi-satellite Solar Spectral Irradiance Composite (MUSSIC) M. Snow, J. Machol, & E. Richard University of Colorado LASP & CIRES
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
GOES-R Instrument Operations Hal Bloom GOES-R Program January 2009 AMS Conference.
Comparison of Solar EUV Irradiance Measurements from CDS and TIMED/EGS W. T. Thompson L3 Communications EER, NASA GSFC P. Brekke ESA Space Science Department.
Develop Project Charter
2015 AMS Annual Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES- R.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
1 Solar / Geophysics – 23 February 2015 Solar / Geophysics W. Denig, Chief Solar & Terrestrial Physics Division NOAA/NESDIS/NGDC
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
A Long Term Data Record of the Ozone Vertical Distribution IN43B-1150 by Richard McPeters 1, Stacey Frith 2, and Val Soika 3 1) NASA GSFC
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
Noteworthy Items (1/2) Product Software Update Process – What is the process? – When can updates be done? – How nimble and timely can it be? – Prioritization.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO A WMO perspective on GSICS Joint Meeting of the.
AMS Meeting, January 2008J1.3. Eparvier - 1 EXIS: The Next Generation of Solar EUV and X-Ray Sensors for GOES-R + F.G. Eparvier, T.N. Woods, W. McClintock,
1 PG-UR Annual Meeting: Welcome from the GOES-R Program Scientist Steven J. Goodman GOES-R Program Senior Scientist NOAA/NESDIS Annual NOAA Satellite Proving.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
Sample Fit-Gap Kick-off
NWA Annual Meeting Joint Satellite Workshop
Pre-launch Characteristics and Calibration
GLAST Large Area Telescope Instrument Science Operations Center
Fangfang Yu, Fuzhong Weng, Xiangqian Wu, and Ninghai Sun
4:40 pm EST Wednesday November 16th
I&T&C Organization Chart
NESDIS-JMA AHI Collaboration
Enterprise Algorithm Change Process
Concept study GOME-2/AVHRR radiance inter-comparison
GOES-16 ABI Lunar Data Preparation to GIRO
Fangfang Yu and Fred Wu 22 March 2011
Lunar data preparation for FY-2
Establish Process Governance
NOAA Satellite Cal/Val Progress Update
Evaluation of ABI Radiometric Characteristics Using Lunar Measurements
GOES-R Program Systems Engineering (PSE) Cal/Val Lead
Launch and On-orbit Checkout
Lunar Observation Activities with a Small Satellite and a Planetary Exploration Satellite. Hodoyoshi-1 Hayabusa-2 Toru Kouyama, AIST
goes-16/17 abi lunar calibration
G16 vs. G17 IR Inter-comparison: Some Experiences and Lessons from validation toward GEO-GEO Inter-calibration Fangfang Yu, Xiangqian Wu, Hyelim Yoo and.
Instrument Commissioning SDO SOWG - January 18-19, 2007 Purpose/Goal:
Solar EUV Irradiance Monitoring beyond SDO-EVE: GOES EXIS Preliminary Measurements and Validation F.G. Eparvier, A.R. Jones, T.N. Woods, M. Snow, E.M.B.
Integration & Test Instrument Operations Coordination
Presentation transcript:

March 26, 2014 Space Weather Product Team (SWPT) Kick Off Meeting

Outline 2 Space Weather Product Team (SWPT) SWPT Membership Support Team Interactions POSST SWPT Scope PLT/PLTP Links PLT/PLPT Test Forms (5 slides) Schedule (Notional)

SWx Products Team 3 The Space Weather Product Team (SWPT) consists of relevant subject matter experts and GOES-R program engineers supporting the effective handover/management of the GOES-R series space weather sensors and validation of GOES-R SWx L1b products. The SWPT operates under the auspices of the CWG but reports directly to the POSST Operations Manager. Principal Duties of the SWPT are to: –Develop procedures for Post-Launch Tests (PLTs) of the GOES-R sensors and Post-Launch Product Tests (PLPTs) for GOES-R L1b products. –Conduct analyses from assigned PLTs and PLPTs to verify nominal instrument performance and validate L1b products. –Report instances of L1b product non-compliance or anomalous behavior. –Advise Program on the efficacy of GS performance monitor tools at OSPO. –Provide needed information and support to Program and Project system integration, operations, transition and handover reviews.

SWPT Membership [TBD] 4 NGDC -Bill Denig, Team Lead -William Rowland, SWT SE -Juan Rodriguez, SEISS -Jon Darnel, SUVI -Janet Machol, EXIS/EUVS -Alysha Reinard, EXIS/XRS -Paul Loto’aniu, MAG -Rob Redmon, MAG -New hire, SEISS MIT/LL -Monica Coakley, Organizational Lead -Fred Rich, MAG, SEISS -New assignee, EXIS, SUVI CWG -Changyong Cao, CWG Chair MOST -Stan Markelov -Alicia Moore -Matt Garhart -Melissa Frederick Flight Project -Monica Todirita -Kumar Tadikonda -Dennis Chesters -Gus Comeyne, EXIS, SUVI -Dan Flanagan, SEISS Ground Segment Project -Randy Race -Farida Adimi DOST -Marge Ripley Bob Iacovazzi, POSST Ops Manager Vendor participation – TBD / Missing OSPO participation

Support Team Interactions Mission Operations Support Team (MOST) – Flight segment certification with support from Flight Systems Engineering, and mission operations validation [POC – Mission Operations Manager] Data Operations Support Team (DOST) – Product generation, distribution, and monitoring operations validation [POC- Data Operations Manager] Product Operations Science Support Team (POSST) – Calibration, image navigation and registration (INR), and product science validation [POC – POSST Operations Manager] You Are Here 5 Not to be confused with

6 Data Operations Tests (DOT Post- Launch Testing (PLT) Post- Launch Product Testing 1 (PLPT-1) Post- Launch Product Testing 2 (PLPT-2) O&M Handoff to OSPO Scope Utilize Mission Validation Test Data Sets (MVT- DS) and verify access to L1b products Validate instrument performance, including GS[?] calibration Product performance validation (GS/OSPO) Validate product science performance to the maturity expected at handover Operational product monitoring, analysis and anomaly resolution functions; ongoing product science performance validation Lead Organization DOST; supported by POSST MOST; supported by vendors and POSST POSST; supported by MOST, DOST and OSPO POSST; supported by MOST and DOST TBD Deliverables L1b Data Validation Reports Test forms and procedures; calibration analysis reports L1b product performance assessment Test forms and procedures; L1b data product reports Logistics support report Responsible for Deliverables Originator of input scenes, with assistance from recipients Assigned test lead and engineers POSST/SWPTAssigned test lead TBD POSST SWPT Scope Timeline

7 DOST POSST (GS Cal Capabilities Val) Instr. Vendor MOST OSPO Propose and evaluate Test plans Develop necessary test procedures. Coordinate, schedule, and execute Test. Perform and required analysis and create Test report. Cal/Val Pre- Incident Report Anomaly Triage and Exploration (PIRATE) and GOES Incident Report (IR) Processes Recommend Inspection or Demonstration Approval (Test Team Lead) Test Approval (MOM or Program Scientist) Coordinate, schedule, and perform Inspection or Demonstration.  POSST (Cal, INR & Product Val)  Propose and evaluate Inspection and Demonstration plans.      Create Inspection and Demonstration Report.      Inspection or Demonstration Approval (DOM) Recommend Test Approval (Test Team Lead) Cal, INR, & Product Val GS Cal Capabilities Val PLT / PLPT Links (per Bob)

PLT / PLPT Forms Test NameShort Title POSST_PLT_Test_Form_SEIS001SEISS In-flight Calibration POSST_PLT_Test_Form_SEIS002MPS-LO Microchannel Plate Bias Voltage POSST_PLT_Test_Form_SEIS003EHIS Sample Pulse Height Analysis POSST_PLT_Test_Form_SEIS004SGPS D3-D1 Contamination Correction POSST_PLT_Test_Form_SEIS005MPS-HI/LO Inter-telescope Correction POSST_PLT_Test_Form_SEIS006MPS-LO Overlapping Zone Comparison POSST_PLT_Test_Form_SEIS007MPS-HI/LO Pitch Angle Distribution POSST_PLT_Test_Form_SEIS008Solar Energetic Particle Anisotropy POSST_PLT_Test_Form_SEIS009MPS-HI/LO Inter-satellite Calibration POSST_PLT_Test_Form_SEIS010SEISS Backgrounds Trending POSST_PLT_Test_Form_SEIS011SEISS Ops in Storage Mode POSST_PLT_Test_Form_SEIS012SEISS Sensitivity to Interference SEISS (as submitted) MOST & DOST will assign PLTs and PLPTs

PLT/PLPT Forms Test NameShort Title POSST_PLT_Test_Form_SUVI001CCD Dark Current Characteristics POSST_PLT_Test_Form_SUVI002SUVI Camera Charactization POSST_PLT_Test_Form_SUVI003SUVI Thermal Characterization POSST_PLT_Test_Form_SUVI004SUVI LED Flat Field Characterization POSST_PLT_Test_Form_SUVI005Off Band Signal Characterization POSST_PLT_Test_Form_SUVI006SUVI E/W Scan Flat Field Characterization POSST_PLT_Test_Form_SUVI007SUVI N/S Scan Flat Field Characterization POSST_PLT_Test_Form_SUVI008Kuhn Raster Flat Field Charactization POSST_PLT_Test_Form_SUVI009SUVI Guide Telescope Alignment SUVI

PLT/PLPT Forms Test NameShort Title POSST_PLT_Test_Form_EXIS001Monitor all L1b EXIS Irradiances POSST_PLT_Test_Form_EXIS002EXIS FOV Mapping POSST_PLT_Test_Form_EXIS003XRS/SUVI Co-alignment POSST_PLT_Test_Form_EXIS004XRS/EUVS/SPS Co-alignment POSST_PLT_Test_Form_EXIS005XRS Cross-talk (Cruciform scan) POSST_PLT_Test_Form_EXIS006XRS Cross-talk (Flare) POSST_PLT_Test_Form_EXIS007XRS Inter-satellite Calibration POSST_PLT_Test_Form_EXIS008EUVS Inter-satellite Calibration POSST_PLT_Test_Form_EXIS009XRS High & Low Gain Comparisons POSST_PLT_Test_Form_EXIS010XRS Quad-diode Characterization POSST_PLT_Test_Form_EXIS011XRS and EUVS Inter-satellite Calibrations EXIS (1 of 2)

PLT/PLPT Forms Test NameShort Title POSST_PLT_Test_Form_EXIS012EUVS-C Channel Cross-calibration POSST_PLT_Test_Form_EXIS013EUVS 5-nm Proxy Model Comparison POSST_PLT_Test_Form_EXIS014XRS Dark Calibration POSST_PLT_Test_Form_EXIS015Filter Motor Opto-coupler Calibration POSST_PLT_Test_Form_EXIS016EXIS Particle Background Interference POSST_PLT_Test_Form_EXIS017XRS-EUVS Offset Characterization POSST_PLT_Test_Form_EXIS018EUVS Flat-field Response POSST_PLT_Test_Form_EXIS019EXIS In-flight Calibration POSST_PLT_Test_Form_EXIS020EUVS Bootstrap Method Test EXIS (2 of 2)

PLT/PLPT Forms Test NameShort Title POSST_PLT_Test_Form_MAGN001MAG Bias and Alignment POSST_PLT_Test_Form_MAGN002MAG In-flight Calibration POSST_PLT_Test_Form_MAGN003MAG Sensitivity to Interference POSST_PLT_Test_Form_MAGN004MAG Boom Deployment Analysis POSST_PLT_Test_Form_MAGN005MAG Comparison to Quiet Fields POSST_PLT_Test_Form_MAGN006Yaw-Flip Data Comparison POSST_PLT_Test_Form_MAGN007MAG Inter-satellite Calibration POSST_PLT_Test_Form_MAGN008MAG MLT-based Inter-satellite Calibration POSST_PLT_Test_Form_MAGN009MAG Sensor Difference Comparison POSST_PLT_Test_Form_MAGN010MAG Sensor Ratio Comparison POSST_PLT_Test_Form_MAGN011MAG Inter-sensor Contamination POSST_PLT_Test_Form_MAGN012MAG Diurnal Variations POSST_PLT_Test_Form_MAGN013MAG Eclipse Effects POSST_PLT_Test_Form_MAGN014MAG Gradiometer Method Test MAG

13 Schedule (Notional) NOTIONAL ONLY