Safety Council Meeting Tucson Arizona 10 – 11 April 2014 1 Safety Council Meeting Tucson Arizona 10 – 11 April 2014 LSST Project Status Victor L. Krabbendam.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

DECam Community Pipeline Review Closeout Presentation DES Council of Directors’ Review August 30-31, 2010 NCSA, Urbana IL.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Server Virtualization: Navy Network Operations Centers
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
1 LSST dark energy science collaboration meeting Penn June 11-13, 2012 LSST dark energy science collaboration meeting Penn June 2012 Governance Document.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
ERCOT and Utilicast Public Document ERCOT Board of Directors Meeting April 22, 2009 Nodal Program Oversight Report 10 – Infrastructure.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Telescope Integration and Tests Tuesday Afternoon.
1 FINAL DESIGN REVIEW | TUCSON, AZ | OCTOBER 21-25, 2013 Name of Meeting Location Date - Change in Slide Master Overview of LSST Tools and Simulations.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
1 FINAL DESIGN REVIEW | TUCSON, AZ | OCTOBER 21-25, 2013 Name of Meeting Location Date - Change in Slide Master Title of Presentation Andrew Connolly LSST.
1 Large Synoptic Survey Telescope Status Update for AAAC October 13, 2011 Nigel Sharp Division of Astronomical Sciences, NSF Kathy Turner Office of High.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
COSMO Large Coronagraph Preliminary Design Review
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
2016 NSF Large Facilities Workshop Matthew J. Hawkins Head, Large Facilities Office May 24-26, 2016 Washington, DC 1.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Project Management PTM721S
Large Synoptic Survey Telescope
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Camera PDR/CD1 Planning 19 September 2008
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
Jim Fast Pacific Northwest National Laboratory
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Project Management W. J. Foyt
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
Chuck F Claver LSST System Scientist & Commissioning Lead
LDF “Highlights,” May-October 2017 (1)
City-wide LED Street Light Conversion Program
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
Stan Whitcomb LSC meeting Livingston 21 March 2005
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Mark McKinnon EVLA Project Manager
ONGARD Modernization Project Certification: Planning: Change Request September 17th, 2014 Tim Elsbrock, Project Manager Tony Hoffman, Director of.
Details supporting the increase
North American ALMA Development Program
Preliminary Project Execution Plan
Question 1: Contingency for “extra” year
Presentation transcript:

Safety Council Meeting Tucson Arizona 10 – 11 April Safety Council Meeting Tucson Arizona 10 – 11 April 2014 LSST Project Status Victor L. Krabbendam LSST Project Manager 10 April 2014

Safety Council Meeting Tucson Arizona 10 – 11 April Outline and Summary Project organization status –PBR for 2015 and NSF response provided MREFC TPC and profile –Project schedule remains synchronized –Commissioning plan and schedule float –LSST is ramping up Project technical status is ready for construction –NSF project elements ready for MREFC start in July Systems Engineering Telescope and site ready for rapid start Data Management Teams are ready for construction EPO continues to develop and is ready to shift to construction –Camera transition to TEC in 2014

Project Organization Status

Safety Council Meeting Tucson Arizona 10 – 11 April LSST in the FY14 President’s Budget NSF “In FY 2014, NSF requests funding to continue construction of four projects: Advanced LIGO (AdvLIGO), Advanced Technology Solar Telescope (ATST), Ocean Observatories Initiative (OOI), and the National Ecological Observatory Network (NEON). NSF is planning to begin construction of one new project in FY 2014, the Large Synoptic Survey Telescope (LSST).” “The FY 2014 Budget Request for the Large Synoptic Survey Telescope (LSST) is $27.50 million. This is the first year of support for an eight-year project that will begin in July The total project cost to NSF is estimated at $ million. This project is being developed in partnership with the U.S. Department of Energy (DOE). “

Safety Council Meeting Tucson Arizona 10 – 11 April LSST in the FY14 President’s Budget DOE “The Large Synoptic Survey Telescope Camera (LSSTcam ) … will open a new window on the universe and address a broad range of astronomical topics with an emphasis on enabling precision studies of the nature of dark energy. … The project is carried out in collaboration with NSF, along with private and foreign contributions. DOE will provide the camera for the facility. CD-1 for the LSSTcam project was approved in April 2012, with an estimated total DOE cost range of $120,000,000–$175,000,000 and estimated completion date of FY 2021.” “Overall, funding for Cosmic Frontier activities ramps up due to the increase for the Large Synoptic Survey Telescope (LSST) experiment camera (LSSTcam), and for facilities operations for dark energy and dark matter research. Experimental operations and research funding increase to support the increased activities in this area.”

Safety Council Meeting Tucson Arizona 10 – 11 April Very successful NSF FDR held in December 2013! From the Executive Summary: “The Panel regards the project team as very strong, with well-developed plans, schedules and cost estimates. We have no hesitation in our assessment that the project will be ready for start of construction on July 1, 2014.” The Committee encouraged the NSF to fully fund the project at the presented budget levels, but acknowledged that we had appropriate plans in place to accommodate the lower PDR level funding if necessary. –$466M PDR budget went to $488M at FDR –Cause was extra year for new DOE schedule and more mature estimates The Project has submitted a detailed response to explicit recommendations in the report and to comments requiring actions. –In general, we found Panel recommendations to be valid and helpful. –But, Final TPC ruling would have to await Appropriations and PBR release

Safety Council Meeting Tucson Arizona 10 – 11 April Omnibus Bill Budget Language in January and 2015 PBR in March include favorable LSST language NSF: “This Act includes $200,000,000 for Major Research Equipment and Facilities Construction. Funds are provided at the request level for all projects for which construction has already begun, and remaining funds are for the initiation of the Large Synoptic Survey Telescope (LSST) project. If NSF determines that LSST requires additional funding in fiscal year 2014, NSF may submit a transfer proposal to provide such funds.” The FY15 President’s Budget Request indicated that we will indeed get the full $27.5M planned for FY14. Next step is National Science Board approval at their meeting on May 6, leading to a construction start on July 1. DOE: LSST not called out explicitly, but full funding of $22M in FY14.

Safety Council Meeting Tucson Arizona 10 – 11 April Project has re-programmed the effort to accommodate revised budget and profile Burdened Total Cost FDR Update FY2014$27,500 FY2015$79,640 FY2016$99,670 FY2017$67,120 FY2018$55,800 FY2019$47,890 FY2020$45,750 FY2021$39,900 FY2022$9,730 Grand Total$473,000

Safety Council Meeting Tucson Arizona 10 – 11 April Revised plan removes 6 month of full system commissioning for reduced science verification Commissioning is still three phases: –Early commissioning with single raft camera, –system integration and test after full camera delivery, and –science verification. Science verification reduction eliminates one last iteration of on-sky data to optimize data algorithms in pipelines. –Still sufficient commissioning to validate system performance and hardware optimization –Risk is to the performance of first data release at 6 months into survey; this is fully recoverable in next release at end of Survey Year 1. The single raft commissioning camera is an important element for mitigation of schedule and science impact. – Camera will provide tool for early commissioning of summit and DM assets. – Also provides significant risk mitigation to full camera delivery and reduces schedule dependency of NSF and DOE projects

Safety Council Meeting Tucson Arizona 10 – 11 April Original Integrated Project Schedule shows where descope has occurred Remove 6 months here: Maintains 2 years of commissioning and schedule contingency

Safety Council Meeting Tucson Arizona 10 – 11 April Single Integrated Project Schedule (IPS) has All Subsystems and All Phases: Construction to Operations July 1, 2014 MREFC Start Start Early Commissioning with ComCam Install Camera Science Verification Early Completion 7 Mo Float Operations Review April 1, 2019 Early Ops Start We status 70 interface milestones between IPS and Cam schedule at SLAC Revised commissioning plan for new TPC is not reflected in this graphic

Safety Council Meeting Tucson Arizona 10 – 11 April LSST Director Steve Kahn Deputy Director Open Chief Scientist Tony Tyson Science Advisory Committee Michael Strauss Education and Public Outreach Project Manager Suzanne Jacoby Subsystem Scientist Tim Axelrod Telescope and Site Project Manager Bill Gressler Subsystem Scientist Open Camera Project Manager Nadine Kurita Subsystem Scientist Steve Ritz Data Management Project Manager Jeff Kantor Subsystem Scientist Mario Juric Systems Engineering SE Manager George Angeli Systems Scientist Chuck Claver Project Office Business Manager Daniel Calabrese Safety Manager Chuck Gessner Project Science Team Project Manager: Victor Krabbendam Project Scientist : Zeljko Ivezic LSST Team is Organized as a single project with a single Director and Project Manager

Safety Council Meeting Tucson Arizona 10 – 11 April LSST Hiring Campaign Deputy Director and Telescope Scientist Currently active recruitments 2 Dozen hires in next 12 months Getting out the Hiring message with campaign approach –AURA Open House –AAS – June –SPIE – July –Print and Web

Safety Council Meeting Tucson Arizona 10 – 11 April LSST Project Office is finalizing revised plan and making final preparations for July MREFC Start Recently completed an NSF “Budget Sufficiency Review” conducted by Booz Allen Hamilton “Assess and form an opinion on the sufficiency of the estimate for construction of the National Science Foundation (NSF) sponsored scope for the Large Synoptic Survey Telescope Project; including whether the estimate is: –Adequate with regard to the validity of cost and schedule assumptions and cost estimating methodology, –Complete, and –Prepared in accordance with the recipient’s cost accounting practices and relevant Office of Management and Budget administrative requirements and cost principles. Revised Project Plan, budget details, and schedule being completed and integrated into EVMS for May submittal to NSF

Safety Council Meeting Tucson Arizona 10 – 11 April Camera Team is preparing for two formal reviews in 2014 CD-3A for Sensor Procurement is scheduled for May 7 –Long lead procurement authorization for production commitment –Successful Director’s Review held at SLAC 1-3 April CD-2 Review scheduled for November 2014 –Sets the formal LSSTCam Project Baseline cost and schedule –Director’s Review will be in early October –All requirements must be finalized –All costs and schedules with updated Basis of estimate

Safety Council Meeting Tucson Arizona 10 – 11 April Safety Council Meeting Tucson Arizona 10 – 11 April 2014 Project is Ready for Construction

Safety Council Meeting Tucson Arizona 10 – 11 April LSST Systems Engineering team is actively engaged with all subsystems LSST Systems Engineering team is actively engaged with all subsystems Physical and Data Interfaces Have Been Identified Between Subsystems

Safety Council Meeting Tucson Arizona 10 – 11 April N 2 Diagram Shows ICDs to Manage Interfaces √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ under formal change control in progress (Phase 1) √ √ √ √ √ √ √ √ √ √ Working with subsystems to complete interfaces in support of construction schedule

Safety Council Meeting Tucson Arizona 10 – 11 April The Telescope and Site team is ready to begin construction on site in September 1,380m 2 Service and Maintenance Facility Control Room Camera Clean Room Coating Chamber 1.2-m Atmospheric Telescope 30-m Dome 350-ton Telescope Base Facility Operations Support Data Access Center

Safety Council Meeting Tucson Arizona 10 – 11 April Early non-Federal Funds Supported Long Lead Procurements and Risk Reduction Primary mirror development and polishing Secondary mirror blank and Initial site excavation The Site today – ready for construction Secondary Mirror Substrate ready for optical polishing Primary mirror polishing to be completed mid 2014

Safety Council Meeting Tucson Arizona 10 – 11 April Major Early Procurements Support Technical and Programmatic Risk Reduction Early Design Build procurements also being placed to address vendor dependant designs, eliminate bid jeopardy risks and promote swift start to construction. –Secondary Mirror Optical Fabrication: Competed Nov ($15M) –Hexapod System Fabrication: Completed April 2013 ($4M) –Telescope Mount Assembly: Completed March 2014 ($35M) –Summit Facility Construction:May 2014 ($20M) Camera Hexapod/Rotator

Safety Council Meeting Tucson Arizona 10 – 11 April Integrated Camera Camera Parameters PropertyValue Lifetime15 years Incident half-angle in air14.2 o o Focal plane diameter634 mm Maximum mass3060 kg Maximum diameter1650 mm Total length3732 mm Filter L1 Lens Utility Trunk— houses support electronics and utilities Cryostat—contains focal plane & its electronics Focal plane Behind L3 Lens L2 Lens L3 Lens Camera ¾ Section 1.65 m (5’-5”)

Safety Council Meeting Tucson Arizona 10 – 11 April Sensor Status: Ready for CD-3a and CD-2 Major accomplishments : –Received sensor prototypes that met specifications from 2 vendors –Sensor team has exhaustively tested and studied these prototypes –A successful Sensor Final Design Review executed –The award for first article sensors is imminent. –Executed end-to-end signal chain test from CCD  prototype electronics  prototype DAQ, all controlled by the Camera Control System (CCS); data will soon be analyzed with Data Management software 6 Month Major Milestones: –Award PO for first article sensors and Options for Lot1 –Prepare sensor production test facilities at BNL – June 2014 Sensor & Sensor Testing Manufacturing Readiness Review

Safety Council Meeting Tucson Arizona 10 – 11 April L1-L2 Status New composite Support Ring and Cross-section Excellent structural and thermal stability L2 Cell & Adjustable Bipods For optic alignment Recent Accomplishments –L1-L2 Procurement Review –Issued RFP & responses for design and manufacturing –Issued RFP & responses AR coat study 6 Month Major Milestones: –BBAR coating study award: 04/2014 –L1-L2 structure phase 1 award: 4/2014 –BBAR coating witness sample award: 8/2014 –L1-L2 preliminary design review: 11/2014 –L1-L2 structure phase 2 award: 11/2014 –L1-L2 blank award: 11/2014 –Update basis of estimates, cost books and schedule –Execute cost & schedule review

Safety Council Meeting Tucson Arizona 10 – 11 April Filter Status Current Design Frame: Aluminum Simplifies manufacturing Not dependent on Exchange Exact Constraint Reduced mass Realistic design Integrated baffles for Stray and scattered light Kinematic mount reduces stress Current 0.21MPa Recent Accomplishments –We have evaluated the various sets of transmission curves for the scientific areas –Various vendor-provided filter curves meet the SRD requirements –Witness sample and first article RFP review held on 02/18/2014 in preparation for procurement 6 Month Major Milestones: –Update basis of estimates, cost books and schedule –Filter preliminary design review: 6/2014 –Filter witness sample award: 07/2014

Safety Council Meeting Tucson Arizona 10 – 11 April Integrated DM Team has designed and prototyped critical algorithms, software, and hardware at scale Algorithm Design ~60% of the software functional capability has been prototyped Over 350,000 lines of c++, python coded, unit tested, integrated, run in production mode Released 3 terabyte-scale datasets, including single frame measurements, point source and galaxy photometry Petascale Computing Design Executed in parallel on up to 10k cores (TeraGrid/XSEDE and NCSA Blue Waters hardware) with scalable results

Safety Council Meeting Tucson Arizona 10 – 11 April DM Team has Designed and Prototyped Critical Database and Technologies at Scale Petascale Database Design –Conducted parallel database tests up to 300 nodes, 100 TB of data, 100% of scale for first year of operations. Gigascale Network Design –Currently testing at up to 1 Gbps –Agreements in principle are in hand with key infrastructure providers (NCSA, FIU/AmPath, REUNA, IN2P3.)

Safety Council Meeting Tucson Arizona 10 – 11 April Education and Public Outreach system development continues to optimize system for broad participation Construction elements –Data Center –An EPO Portal –Learning Experiences –A virtual workspace –Library of content and visualization modules –A model for professional development –Framework for Sustainable Partnerships EPO is scoped and costed for construction based on existing prototypes, lessons learned from other projects, and staff expertise. EPO program takes advantage of LSST’s science goals and unique capabilities, and is aligned with national STEM education and workforce development goals. The EPO subsystem is at an appropriate level of maturity and is Ready for a Construction Start!

Safety Council Meeting Tucson Arizona 10 – 11 April The LSST Project is Ready for Construction