Working Group 3 Summary M. Sullivan / Y. Funakoshi.

Slides:



Advertisements
Similar presentations
Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Beam-beam simulations M.E. Biagini, K. Ohmi, E. Paoloni, P. Raimondi, D. Shatilov, M. Zobov INFN Frascati, KEK, INFN Pisa, SLAC, BINP April 26th, 2006.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Beamstrahlung and energy acceptance K. Ohmi (KEK) HF2014, Beijing Oct 9-12, 2014 Thanks to Y. Zhang and D. Shatilov.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
Partial summary of WG3 M. Sullivan and Y. Funakoshi.
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
Luminosity of the Super-Tau-Charm Factory with Crab Waist D. Shatilov BINP, Novosibirsk TAU’08 Workshop, Satellite Meeting “On the Need for a Super-Tau-Charm.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
Simulation on beam loss from radiative Bhabha process Y. Funakoshi KEK.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Preliminary Result on L*=1.5m CEPC Interaction Region Yiwei Wang, Dou Wang, Sha Bai Yingshun Zhu, Teng Yue CEPC acc. meeting, 5 September 2014.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Summary WG 9 Instrumentation and Control 1 session: 2 presentations 1 contribution discussion Oct 12, 2014 M. Minty, H. Schmickler.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
Choice of circumference, minimum & maximum energy, number of collision points, and target luminosity M. Koratzinos ICFA HF2014, Thursday, 9/10/2014.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
1 FCC-ee as Higgs Factory Jörg Wenninger CERN Beams Department Operation group - LHC 23/07/2014 Future Circular Collider Study Acknowledgments to my FCC-ee.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
News from the interaction region study Bernhard Holzer, Anton Bogomyagkov, Bastian Harer, Rogelio Tomas Garcia, Roman Martin, Luis Eduardo Medina Presented.
FCC-ee Interaction Region design
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
The Interaction Region
Final Focus Synchrotron Radiation
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Updates on IR and FF for super-B factory
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
Interaction Region Design Options e+e- Factories Workshop
Y Cai and K. Ohmi Summary of WG2 Y Cai and K. Ohmi
Beam-Beam Effects in the CEPC
Mini-Workshop on BEPCII Background Study
Parameter Optimization in Higgs Factories Beam intensity, beam-beam parameters, by*, bunch length, number of bunches, bunch charge and emittance.
Overall Considerations, Main Challenges and Goals
Beam-Beam Effects in High-Energy Colliders:
Cost Algorithm for a Super-B Factory
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Sawtooth effect in CEPC PDR/APDR
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Working Group 3 Summary M. Sullivan / Y. Funakoshi

We had 6 sessions and 14 talks – 3 sessions were joint (WG2 and WG4) Fri. – Oct. 10 – CEPC IR Optics, Y. Wang (IHEP) – Status of FCC-ee interaction region design, R. Martin (CERN) – Crab waist interaction region, A. Bogomyagkov (BINP) – SuperKEKB background simulations, H. Nakayama (KEK) – Beam-beam limit vs. number of IPs and Energy II: scaling law, M. Xiao (IHEP) – Beam-beam limit vs. number of IPs and Energy I: beam- beam simulation, K. Ohmi (KEK) – Long-Range beam-beam interaction with the CESR bunch train operation, D. Rice (Cornell U.)

Sessions 4-6 Sat. – Fri Oct. 10 – Choice of L* I and SR in the HF IR, M. Sullivan (SLAC) – Choice of L* II: IR optics and dynamic aperture, E. Levichev (BINP) – Choice of L* III: requirement from the detector, G. Li – Lost particles in the IR and Touschek effects, M. Boscolo (INFN-LNF) – Infrared synchrotron methods and systems for monitoring and controlling particle beams in real time, M. Maltseva (TENZOR) – Detector beam background simulations for CEPC, H. Zhu (IHEP) – Synchrotron radiation absorption and vacuum issues in the IR, J. Seeman (SLAC)

Some highlights The CEPC IR optics have been improved – The strong bend magnets in the local chromaticity correction blocks have been softened and the L* has moved down to 1.5m The FCC-ee IR design is being studied – Double ring – 11 mrad crossing angle – A very flexible design to cover Z0 to ttbar Ecm range A crab waist IR design was presented that looked promising There was a very comprehensive talk on superKEKB background studies – Very extensive work on detector and local accelerator component modeling

Highlights (2) Two interesting studies of beam-beam limits – Scaling laws and simulations compared against measured values from several machines – Larger  y* gives more luminosity for CEPC design 2mm  y* should have more lumi than 1.2 mm  y* Presentation on pretzel design with bunch trains from CESR – Difficult to maintain even with extreme machine flexibility

Highlights (3) Three talks on L* choices – First talk also included general SR issues There is a lot of SR in the IR Beam tails are important – Second talk included general non-linear effects and suggested lowering beta maximum values – Third listed detector requirements and pointed out desire for a small radius IP beam pipe Comprehensive presentation on beam particle losses – Beamstrahlung is very important for the CEPC and FCC-ee

Highlights (4) Interesting presentation on a new detector using infrared SR to monitor beam conditions in real time Detector background simulations for CEPC – General indication is that backgrounds do not look too bad at this stage – More detailed simulations to follow A look at PEP-II B-factory issues for SR power and vacuum requirements in the IR – SR power must be carefully controlled – Everything in the vacuum system has to be water cooled

Summary Some general impressions and thoughts for further study – L* needs further optimization Final focus magnets are still quite strong Beta maximums are still fairly large Strong SR generators – Beam pipe sizes need further investigation – Beam-stay-clear definition – what is needed? Beam tail distributions

Summary (2) – Storage ring beams have beam halos The ILC does not. So ring backgrounds should be higher than the ILC? Beam backgrounds (SR and lost particles) will set IR beam pipe size(s) Beam tails used for PEP-II B-factory Minimal tail distribution since the B- factories do not have beamstrahlung

Conclusions We had a very interesting set of presentations and a great deal of discussion on many topics There is always much more to do and many good points were raised that will require further thought and study These large ring e+e- colliders (factories!) are very interesting machines with challenging issues!