Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.

Slides:



Advertisements
Similar presentations
New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
“Do not take anyone’s advice as to how this building should be assembled.”
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Electrical Power Systems
Chapter 4: Air Leakage Control: Materials and Techniques
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
HVACR116 – Trade Skills Mechanical Drawings.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Building Codes and Interior Design
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Name of Building(s) or Project Speaker(s) Organization(s)
Fire Safety Month Fire Safety Tips for October Department of Risk Management James Madison University.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Tangible Property Regulations Presented by David W. Jennings, CPA.
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
1/21/2016D.S. Sachdev1 Internal Cladding Systems in Buildings.
SERVICE ENTRANCE EQUIPMENT
FACILITIES MAINTENANCE PLANNING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Energy Conservation Building Upgrades Alma School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Flammable Liquids Directorate of Training and Education
EXAMINATION 3 REVIEW FORMAT & AREAS COVERED DISTRIBUTION SYSTEMS DELIVERY DEVICES UNITARY SYSTEMS HEAT PUMPS SPACE REQUIREMENTS & DESIGN CONSIDERATIONS.
Cuba-Rushford CSD Capital Project
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Objective 6.02 part 2: Recognize components of construction
Capital Projects Requests
How Completed Interiors Are Achieved: Designing & Building
Earthquake effects on health care facilities
Electrical Gas Plumbing Heating & Cooling
Total Fitness Gym By Student Architect Jhonatan Rubio
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Arch205 building construction Windows- glazed curtain wall, skylights
M&E SYSTEM.
2018 Bond Review and Proposal
Arch205 building construction Introduction
FBE03: Building Construction & Science
Recent Bond Accomplishments
Arch205 Materials and building construction I
Master Facilities Committee Evaluation and Identification
© OnCourse Learning.
Mount Vernon Community School
Stoughton Public Library
Community Practice Asset Management.
The Edge Extreme Makeover.
Presentation transcript:

Dirty Tour December 2005 UN Capital Master Plan

2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was originally built in The building support, administration and infrastructure was designed to handle 70 member states and approximately 700 meetings per year.

3 Dirty Tour- Introduction The building now supports 191 member states and approximately 8,000 meetings per year, Requiring the building to run at maximum capacity 8 months of the year and over capacity for the 4 months of the year during the General Assembly. As a result, the building systems run at full capacity all year long with almost no down time.

4 Dirty Tour- introduction The building systems, designed to last 25 years, are now 35 years beyond their anticipated life span. The main campus operates with virtually no fire suppression systems, with limited fire alarm and public address systems and an air distribution and smoke exhaust system, that is below basic indoor air quality standards. For an organization that is increasingly becoming an international target for terrorism.

5 Lack of Monitoring and Controls The manufacturer of the original equipment, which no longer produce these controls, has requested we donate our panels to their company museum. The building control systems are pneumatic, which use the original copper tubing for its operations, was state of the art in 1950, is now ineffectual and obsolete. Modern systems use computer cabling and desktop computers to control equipment.

6 Electrical Large electrical transformers vaults, located in the high-rise, are usually insulated and located away from staff and sensitive equipment. These vaults, which are owned and operated by the local power provider, are right near staff spaces and are inaccessible to the UN. Although the UN shields these rooms, we do not locate staff on floors above and below the vaults due to the adverse affect on computers and electronic equipment.

7 Electrical The building relies on outdated electrical breakers, fuse boxes and protective systems. The electrical and cable distribution wiring in the Secretariat Building is overstuffed and outdated. Mechanical rooms have exposed cable and wire.

8 HVAC- Equipment Asbestos covered mechanical equipment are unreliable and do not have the monitoring and measurements devices. Control capabilities are limited and inflexible. The parts for the equipment are crafted by UN staff in our basement shops. Equipment requires constant adjustments.

9 HVAC- Ductwork Central and distributed heating, ventilation and control systems can not handle increasing load demands with partially clogged pipes, undersized ducts and inability to control on a zone by zone basis.

10 HVAC- perimeter heating system At the perimeter of the Secretariat Building on each side of each floor are high pressure lines feeding perimeter heating/cooling units for the office floor above. The Pipes are 50 years old, are high pressure and encased in asbestos. If an explosion were to happen, a 10 block containment would most likely happen to abate the asbestos. Poor quality of insulation is due to 50 year old pipes leaking

11 Plumbing problems Many parts of the existing water, steam and chilled water pipes are experiencing local disintegration, and frequent leaks requiring emergency shutdowns. There are no local shut off valves to isolate and maintain leaks.

12 Leaking Roofs, Joints, Façade and windows Many areas of the façade and expansion joints are progressively worsening leaks. Repointing of all facades, required by NYC laws, has been defered.

13 Leaking Roofs, Joints, façade and windows GA Hall entrance areas, copper dome roof and drainage systems are all experiencing heavy water leaks. All exit ramps are progressively deteriorating and need urgent repairs to provide safe exits.

14 Leaks around Curtain Walls and Windows The Secretariat Curtain wall (the exterior glass and metal wall system), standard for most modern office buildings today, was the first such system used in New York City.

15 Leaks around Curtain Walls and Windows Today the system is deteriorating from the inside out. The connections and framing are rotting. The single pane glass is extremely inefficient.

16 Conference Support Systems- central audio cabling Systems designed by the UN in 1950 remain active and act as the primary source for audio and video signal distribution.

17 Lack of Fire Suppression systems The interior office spaces have virtually remained the same since The demountable partition system, light fixtures and ceiling system are still intact. A building-wide sprinkler system, never installed in 1950, is still lacking for most office areas.

18 Project Scope CMP goals remain unchanged. 1)Achieve code compliance in all buildings 2)Replace or refurbish deteriorating equipment and systems 3)Ensure the health and safety of occupants in all buildings and areas 4)Improve Security 5)Increase energy efficiency 6)Adjust and retrofit facilities for modern uses, loads and technologies