July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
First Look at the July-August12 TestBeam Data T. Alexopoulos, G. Iakovidis, S. Leontsinis, K. Ntekas 1.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
GIF++ DAQ architecture 1. Requirements Support of SRS, VMM (UDP packets), VME Several groups can run at the same time Each group should be able to start,
UA9 Collaboration H8 Sept’10 Run - Preparatory Meeting Review & Status of the Telescope DAQ and Online/Offline Software Mark Pesaresi Jonathan.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Finger Sci (SA) Beam profile wire chamber 727 TEST BEAM SETUP Jul-Aug2012 ( ) Si3 Si6 Y-inverted 26 Jura TOP VIEW SIDE VIEW.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
The Application of DAQ-Middleware to the J-PARC E16 Experiment E Hamada 1, M Ikeno 1, D Kawama 2, Y Morino 1, W Nakai 3, 2, Y Obara 3, K Ozawa 1, H Sendai.
Shuei MEG review meeting, 2 July MEG Software Status MEG Software Group Framework Large Prototype software updates Database ROME Monte Carlo.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Experience with medium-size SRS for muon tomography Michael Staib Florida Institute of Technology.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
ATLAS micromegas activities (MAMMA)
News on GEM Readout with the SRS, DATE & AMORE
A simple Desktop DAQ for U2F readout Ulf jörnmark Physics Dept. Lund Status and plans.
High Speed Detectors at Diamond Nick Rees. A few words about HDF5 PSI and Dectris held a workshop in May 2012 which identified issues with HDF5: –HDF5.
+ Running Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 9/10/2012 MM weekly M.
+ Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 25/09/2012 MAMMA extended M. Byszewski(CERN)
+ Running Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 2/10/2012 RD51 Stony Brook.
Source Controller software Ianos Schmidt The University of Iowa.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Florida Institute of Technology, Melbourne, FL
A new web Slow Control & Monitoring system featuring SRS ZeroSuppression implementation StefanoC*, S. L. Goentoro F. Costa, A. Zybel *on behalf of FIT.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
MMDAQ Content – Overview – Case study – adding support for VMM1 chips – Drawings (data flow, concurrency, error reporting, scalability, monitoring) 13.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Monitoring for the ALICE O 2 Project 11 February 2016.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Integration with ATLAS DAQ Marcin Byszewski 23/11/2011 RD51 Mini week Marcin Byszewski, CERN1.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
SRTSC A LabVIEW based Test and Hardware Configuration System for SRS Volkan Gezer Eskisehir Osmangazi University & CERN.
Slow Control and Run Initialization Byte-wise Environment
Slow Control and Run Initialization Byte-wise Environment
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
Christoph Blume Offline Week, July, 2008
PRAD DAQ System Overview
VMM and the SRS - update Michael Lupberger.
JEDI polarimetry – Developments at SMART|EDM_Lab
Calicoes Calice OnlinE System Frédéric Magniette
Testing and Configuration for VMM1 on the mini-MMFE
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Large CMS GEM with APV & SRS electronics
Example of DAQ Trigger issues for the SoLID experiment
Tracker Software Status
Electronics and DAQ for the GEM Detector
Presentation transcript:

July test beam DAQ status Marcin Byszewski Konstantinos Ntekas

Tracker (4x) XY chambers Tracker (4x) XY chambers Tracker (4x) XY chambers tracker (4x) XY chambers FPGA Eval Board FPGA Eval Board External Sci TRG 16x trigger LVDS micromegas (8x) X chambers micromegas (8x) X chambers micromegas (8x) X chambers micromegas (8x) X chambers micromegas (8x) X chambers micromegas (8x) X chambers micromegas (8x) X chambers micromegas (8x) X chambers 4 x HDMI ADC-Card (APV) ADC-Card (APV) FEC 2012 July Micromegas Test Beam Readout Schematics VMM1 events APV25 events Trigger data 10/07/ BNL DAQ card Avnet LX9 AZ Adapter Card VMM1 switch 16x New “C-Card” DCS HV/LV, T-H-P mmdaq PC SDC

DAQ schematics DAQ server Online monitor User Client mmdaq3-client commands C:> start C:> stop C:> configure Configuration-files APV, VMM data Root-file./mmdaq3-server –config-file=./config/server.xml Text log-file

Receiver DAQ schematics UDP receiver UDP frame EQ.ID + data Chip 1 Chip 2 Chip 3 FEC 1 FEC EID; data Event-ID: Trg#, TS ? Decoder UDP Event data out-of-order APV Decoder: ZS, x-talk data EID Wait … Decoder Root writer BNL tree APV tree Unique address (channel, strip) Q, T, User data (APV) FEC Shared memory Online Monitor EB FEC

TODO list DAQ - write shared data to root apv tree + bnl tree (difficult) - write current config in Tenv (intermediate) - write text log file (easy) - prepare mmdaq3 configuration files (easy) (J.V.) - prepare slow control configuration files - Configuration tool (write xml) Hardware: - prepare fast network card (Gigabit) - prepare good quality network cable Tests of decoder + EB + root writer: - prepare DAQ PC for tests (not the old one in lab, mmdaqpc2 from H6) - single fec apv data - single fec bnl data - multiple fec (bnl, apv, bnl + apv) - speed, bottlenecks? Offline - fast analysis of finished run (one-command-script) See V.P.’s slides Event browser : Handle multiple types of raw trees (apv + bnl) (easy) Full detector event overview (intermediate) Overlay cluster results on raw data (difficult) Recomm : Handle multiple types of raw trees (apv + bnl) (difficult) Configuration files (intermediate) – filters – Clusterisation ( 0,10,20 angles) Can we use RD51’s tracker program ? Display results