PDS Radio Science Dick Simpson Stanford University Stanford Status PDS4 Status at Stanford o Testing o Mission Support o Migration Proposal o Tools o Issues.

Slides:



Advertisements
Similar presentations
1 External Review Results November 30, 2011 Reta Beebe.
Advertisements

PDS MC April 2-3, Wash. D. C.1 PDS4 Data Model Working Group Status Report to the PDS Management Council April 2-3, 2008.
Placing Movies in the PDS Archive Engineering Node Pasadena, California Nov 30, 2006
Lecture Nine Database Planning, Design, and Administration
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
PDS Radio Science Dick Simpson Stanford University Overview Activities MC Support PDS-Internal Support (PDS4) Mission Support Node and User Support Local.
PDS4 Phoenix Beta Review Lynn D. V. Neakrase Atmospheres Node.
InSight Archive Status Ed Guinness and Susie Slavney PDS Geosciences Node PDS Management Council Berkeley, California November 18-19, 2014.
Database Planning, Design, and Administration Transparencies
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
IPDA Update Dan Crichton Tom Stein August 2014 International Planetary Data Alliance.
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
Interim Presentation Group 4 - May 14th, 2012 Langson Library Redesign.
PDSMC November 29-30, PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA.
Banner Document Management Suite David Cheney SunGard Higher Education.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Navigation and Ancillary Information Facility NIF Preview of a Web-based GUI Interface to SPICE “WebGeocalc” The NAIF and UCD Teams August 22, 2011 SPICE.
Rings Node Mitch Gordon Mark Showalter MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Radio Science PDS Management Council Node Report 2 April 2009 Dick Simpson Stanford University.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
06/30/ Data Product Service (DPS) Packaging and Context Dan Crichton Steve Hughes Ron Joyner Chris Mattman Paul Ramirez Peter Shames.
Feasibility study A feasibility study is a preliminary investigation of a problem. It is used to decide whether a solution is possible and what effects.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
AMMOS-PDS Pipeline Service (APPS) NASA-Planetary Data System Management Council Meeting Berkeley, CA November 18, 2014 Costin Radulescu *, Steve Spohn.
1 PDS 4 Data Design Report PDS Management Council April 2, 2009 PDS 2010 Data Design WG.
PDS Atmospheres Node Plans for PDS4 User Roll-out 8/28/12PDS4 Roll-outStatus 1 Reta Beebe Lyle Huber Lynn Neakrase Jim Murphy Nancy Chanover Joni Johnson.
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
Data Model & DDWG Update Management Council Face-to-Face Flagstaff, Arizona August 22-23, 2011.
PPI Node R.J. Walker, T.A. King, S.P. Joy, J.N. Mafi MC Face-to-Face Meeting Westwood, California 26 August 2014.
ESA UNCLASSIFIED – For Official Use Data Stewardship Interest Group WGISS-40 Meeting Preservation of SW & Documents at CEOS Agencies Approaches and Lessons.
PDS Geosciences Node Page 1 Archive Status MRO and Phoenix Ed Guinness PDS Management Council August 13, 2007 Ed Guinness.
Geosciences Node Ed Guinness, Susie Slavney, Tom Stein, Ray Arvidson PDS Management Council UCLA August 26-27, 2014.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
User Centered Design Update Jay Trimble NASA ARC
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Using RSNA’s Teaching File Software (MIRC): A Hands on Course Mary Wyers, MD.
SBN Experience with PDS4 Workshops for the Community Anne Raugh PDS MC 26 August 2014.
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
SOFTWARE ARCHIVE WORKING GROUP (SAWG) REPORT TODD KING PDS MANAGEMENT COUNCIL MEETING FEB. 4-5, 2016.
Objectives 4 Identify the meaning of software maintenance and it’s importance in the project life cycle 4 Understand why maintenance is needed.
Planetary Data System (PDS) Tom Morgan November 24, 2014.
PDS M/C November 2012 PPI MAVEN Report PDS4 Mission Report: MAVEN PDS Management Council November 28, 2012 J. Mafi.
Tools Report Engineering Node March 2007
Radio Science PDS Function Report 25 March 2010 Dick Simpson Stanford University.
Movies Engineering Node Standards August 13, 2007.
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
IPDA PDS4 Report July 17, PDS4: The Next Generation PDS PDS4 is a PDS-wide project to upgrade from PDS version 3 to version 4 to address many.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
Tools Report Engineering Node August 2007
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
PDS4 Update Dan Crichton August 2014.
IPDA PDS4 Report PDS Team July 2015.
Costin Radulescu Steve Spohn 26 August, 2014
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
Helping Active Missions Convert to PDS4
Observing with Modern Observatories (the data flow)
Presentation transcript:

PDS Radio Science Dick Simpson Stanford University Stanford Status PDS4 Status at Stanford o Testing o Mission Support o Migration Proposal o Tools o Issues August 20121Radio Science Report to PDS MC

3+ People at Stanford - PI Len Tyler (~1% FTE) - Manager Dick Simpson (~30% FTE) - System Software Analyst Ray Jackson (~12% FTE) - System Administration - System Software Development and Maintenance - Mars Odyssey Archiving - Administrative Support Several Networked Computers and a Telephone Sun Blade 2000 (NASA/MEX funding: being phased out) Mac Mini (PDS funding: being phased in) Library of data, software, and documentation Funded through PDS Management (FY13 = 0.84*FY12) August 2012Radio Science Report to PDS MC2 FY13 Stanford Status

28-29 August 2012Radio Science Report to PDS MC3 PDS4 Status - Testing

28-29 August 2012Radio Science Report to PDS MC4 PDS4 Status - Testing Migrated a single DSN binary data product (RSR) to PDS4 0900B o Data file unchanged o XML label created (based on PPI template from Ron Joyner and PDS3 label) Migrated three documents to PDS4 o One TXT file unchanged o Three ASC files unchanged o One HTM file unchanged o Three XML labels (based on RSR label above) Created one XML schema product o One XSD file from Steve Hughes o One SCH file from Steve Hughes o One XML label based on template from Ron Joyner Created 7 Context products o One mission, two host, one instrument, three target XML files

28-29 August 2012Radio Science Report to PDS MC5 PDS4 Status - Testing Created Product_Collection for each Collection o Created ASCII inventory table from IM 0900B o Created XML label Created Bundle Product for the Bundle o Created XML Product_Bundle oXygen validation successful Dialog in progress with EN regarding other issues

28-29 August 2012Radio Science Report to PDS MC6 PDS4 Status – Mission Support Nothing planned

28-29 August 2012Radio Science Report to PDS MC7 PDS4 Status – Migration Proposal 1.Gain experience with PDS4 by migrating a few high-level, investigator-produced, ASCII data sets (e.g., radio occultation profiles, spherical harmonic gravity models). May reorganize some PDS3 data sets into more convenient pieces. 2.Develop a set of templates and labeling tools which can be applied to DSN output files (mostly binary) — both old and new 3.Use the opportunity to port/upgrade software to the new Stanford computer and work on the restoration queue as resources allow

28-29 August 2012Radio Science Report to PDS MC8 PDS4 Status – Tools Mac OSX readers for DSN output files Templates for XML labels Search-and-Replace Mac OSX scripts to create XML labels Scripts to create Collection inventory tables and labels Scripts to create Product_Bundle products Test, analysis, and display software as needed Time frame: unknown, but probably years

28-29 August 2012Radio Science Report to PDS MC9 PDS4 Status – Issues There are a lot of details Forward motion depends on stability of the Information Model, schemas, and the supporting system Documentation (and its medium) remains a patchwork How PDS4 evolves will depend on tools, how users react to them, and what needs to be upgraded to support the unanticipated requirements