1 QUALITY ASSURANCE EVALUATOR TRAINING ADVISORY & ASSISTANCE SERVICES CONTRACTS.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

VENDED PROGRAMS SFSP FY 05. What is a Food Service Management Company? Any organization (including commercial for profit companies, schools, or private.
ASC CONTRACTING ASC/CC FOCUS WEEK TRAINING (CONTRACT CLOSEOUT)
U.S. Army Expeditionary Contracting Command 409 th Contracting Support Brigade Contract Closeout. as of March 22, 2012 UNCLASSIFIED 1.
CONTRACT CLOSEOUT NORTH REGIONAL CONTRACTING OFFICE 13 January 2010.
Procurement Management
Massachusetts Department of Elementary & Secondary Education
COR Program Nov 11, v5. Learn. Perform. Succeed. Terminal Learning Objective: Given various unique contingency environments determine the issues and determine.
FAR Part 44: Subcontracting Policies & Procedures February 5, 2012.
Phase I Training USCENTAF / A4 LGC - QAPC.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
ACA Directorate of Contracting, Fort Bragg RECAP OF COR FUNDAMENTALS BY ADMINISTRATION DIVISION 15 February 2007.
Marcy Mealy Procurement Specialist CDBG Program
Grant Management Webinar Presenters – Karla Freeman – Beth Romero – Chris Epoca.
MODULE 8 MONITORING INDIANA HPRP Training 1. Role of Independent Financial Monitors 2 IHCDA is retaining an independent accounting firm to monitor its.
Post Award Workshop April 5, Fiscal Responsibilities 1. University Wide Responsibilities Every university employee has a responsibility to ensure.
Basic Financial Requirements for DoD Government Contracting 2015 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Phase II Training Briefed By [CA insert name] For Quality Assurance Personnel.
ISO 9000 Certification ISO 9001 and ISO
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
Contracting Officer Representative Appointment and Responsibilities
1 SILVER FLAG BPA ORDERING OFFICIAL TRAINING. 2 Purpose Is to provide you, our customer, the information and knowledge to perform as an Ordering Official.
Introductions Mike Dement Multi Management Services
410th COR Training COR Files Maintenance.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
Managing Project Procurement
1 | Weatherization Assistance Programeere.energy.gov Eric Bell 1 Federal/State Monitoring 2010 Orientation for State WAP Directors and Staff.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Financial Resource Management Recommended Best Practices Training for Volunteers and Support Groups.
FAR PART 45 – Government Property
1 INTERNAL CONTROLS Matthew Pakos School Improvement Grant Programs May 23, 2011.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
Contract Types PAO Approved SPR Contract Types
88 CONS/PK Revised November 2004 BPA Ordering Officer Training.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Pwc NDIA Annual Educational Seminar Contracting for Services March 31, 2008.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
JOB CORPS HELPFUL HINTS FOR ACCELERATED CLOSEOUT Department of Labor.
PwC Service Contracting DCAA Interests & Initiatives March 31, 2008.
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
NWPP Multiple-Award Technical Support Contract (eff. 08/2005) Unit 8 Unit 8 “Managing the Task Order”
New Time and Material Requirements Glenn Baer March 2007.
Procurement Card Program. This program was established to allow rapid purchases of repetitive or low dollar goods and services while simultaneously reducing.
Contracting Officer Representative (COR) Appointment and Responsibilities Slides: Homepage - Staff Sites – G8 – P&C - COR 15 December 2015.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Copyright © Texas Education Agency Accounting for Grant Funds, including Documentation for Expenditures.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Effort 101. Effort Theory Review –Why Certify Effort –Audits –Select Definitions –Effort Management –Effort Certification –Risks of Non-Compliance.
1 Consent to Subcontract Breakout Session # D12 Name: Rita Wells Daniel Johnson Anthony Simmons Date:July 12, 2011 Time:11:15 – 12:30.
Responsibilities of Sponsor, Investigator and Monitor
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
UW Whitewater Procurement Card Program
SUBRECEPIENTS POST-AWARD PROCEDURES
Award Set-Up and Advances
Subaward - 2 CFR A formal legal agreement between your institution and another legal entity An award provided by a pass-through entity (PTE) to.
Responsibilities of Sponsor, Investigator and Monitor
Consent to Subcontract
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
City of Norfolk Office of the Purchasing Agent
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Grants Management 101 Part A
Waiver Assurances and Performance Measures
Presentation transcript:

1 QUALITY ASSURANCE EVALUATOR TRAINING ADVISORY & ASSISTANCE SERVICES CONTRACTS

2 OVERVIEW l GENERAL CONTRACTING ISSUES l CONTRACTOR’S (KTR’S) QUALITY CONTROL PLAN (QCP) l QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) l YOUR TASK ORDER REQUIREMENTS l DOCUMENTATION

3 GENERAL CONTRACTING ISSUES l ONLY THE CONTRACTING OFFICER (CO) CAN: –OBLIGATE THE GOVERNMENT –MODIFY THE TASK ORDER l QUALITY ASSURANCE EVALUATORS (QAES): –MONITOR CONTRACTOR PERFORMANCE –DIRECT REPERFORMANCE OF WORK –CERTIFY THAT SATISFACTORY SERVICES ARE RECEIVED BY THE GOVERNMENT

4 GENERAL CONTRACTING ISSUES l CONTRACTOR IS BOUND BY: –BASIC CONTRACT (GSA OR CAAS) –INDIVIDUAL TASK ORDER YOUR STATEMENT OF WORK CONTRACTOR’S PROPOSAL –SOLUTION & PRICE –CONTRACTOR’S QUALITY CONTROL PLAN (CAAS CONTRACT)

5 GENERAL CONTRACTING ISSUES l CAAS CONTRACT: CHANGING/SUBSTITUTING PERSONNEL –KTR MUST USE PERSONNEL IDENTIFIED IN THEIR PROPOSAL –CANNOT SUBSTITUTE WITHOUT CO's APPROVAL –SUBSTITUTIONS MUST MEET OR EXCEED QUALIFICATIONS OF ORIGINAL ASSIGNED PERSON

6 GENERAL CONTRACTING ISSUES l INSPECTION AND ACCEPTANCE –INSPECTION PERFORMED AT DESTINATION AT GOVERNMENT SITE BY ASSIGNED QAES –ACCEPTANCE PERFORMED BY THE QAES OR FAC

7 GENERAL CONTRACTING ISSUES l INSPECTION OF SERVICES CLAUSE –GOV’T WILL INSPECT IN A MANNER THAT WILL NOT UNDULY DELAY KTR’S WORK –KTR WILL FURNISH ALL REASONABLE FACILITIES AND ASSISTANCE TO GOV’T –GOV’T MAY REQUIRE REPERFORMANCE OF ANY UNACCEPTABLE WORK

8 GENERAL CONTRACTING ISSUES –WHEN REPERFORMANCE IS NOT FEASIBLE KTR TAKES CORRECTIVE ACTIONS FOR FUTURE ACTIONS TASK ORDER AMOUNT IS REDUCED GOV’T MAY PERFORM SERVICES AND CHARGE KTR MAY TERMINATE CONTRACT FOR DEFAULT

9 GENERAL CONTRACTING ISSUES l GRATUITIES –DO NOT ACCEPT ANY GRATUITY (E.G... AN ENTERTAINMENT OR GIFT) FROM THE KTR –NOTIFY THE CO IF OFFERED A GRATUITY l CONFLICTS OF INTEREST – PROHIBITIONS AGAINST EMPLOYMENT – DISCUSS W/JA IF CONSIDERING EMPLOYMENT DISCUSSIONS

10 GENERAL CONTRACTING ISSUES l PROPERTY RECORDS –GOV WILL MAINTAIN OFFICIAL PROPERTY RECORDS FOR ALL GOV FURNISHED EQUIP QAES TAKE INVENTORY OF ALL GFE BEFORE PROVIDING IT TO CONTRACTORS –DETAILED DESCRIPTION AND CONDITION OF ALL EQUIPMENT –GET CONTRACTOR TO ACKNOWLEDGE –FILE WITH QA DOCUMENTS

11 GENERAL CONTRACTING ISSUES l SECURITY SPECIFICATION (DD254) –REQ’D IF KTR WILL HAVE ACCESS TO CLASSIFIED DATA –KTR WILL ESTABLISH AND MAINTAIN A LIST OF ALL PERSONNEL AND CLEARANCES UNDER TASK ORDER –KTR MUST NOTIFY FAC/QAES OF ANY CHANGES –MAKE SURE KTR PERSONNEL ARE CLEARED!

12 GENERAL CONTRACTING ISSUES l GOV’T SUPERVISION OF KTR EMPLOYEES –GOV’T SHALL NOT SUPERVISE OR OTHERWISE DIRECT ANY KTR EMPLOYEES –KTR PERSONNEL SHALL NOT BE PLACED UNDER GOV SUPERVISION BE PLACED IN GOV STAFF OR POLICY MAKING POSITION. BE PLACED IN COMMAND, SUPERVISION, ADMINISTRATION OR CONTROL OF GOV PERSONNEL

13 CONTRACTOR’S QUALITY CONTROL PLAN (QCP) CAAS CONTRACT

14 QCP l QUALITY CONTROL PLAN (QCP) (CAAS CONTRACT) –CONTRACT REQUIRES CONTRACTOR TO DEVELOP AND MAINTAIN SUFFICIENT QCP –KTR MUST ENFORCE THEIR QCP –ENSURES SATISFACTORY PERFORMANCE –QAE SHOULD REVIEW KTRS QCP AT START OF PERFORMANCE WHENEVER A DISCREPANCY OCCURS NOTIFY CO IF REVISIONS ARE NEEDED

15 Quality Assurance Surveillance Plan (QASP)

16 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) l QUALITY ASSURANCE SURVEILLANCE PLAN: PROVIDES GENERAL SURVEILLANCE GUIDELINES WRITTEN BY THE QAE/FAC IDENTIFIES QA PERSONNEL IDENTIFIES DELIVERABLES AND METHODS OF INSPECTION

17 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) l OBJECTIVE –TO ENSURE THE GOV’T RECEIVES THE GOODS AND SERVICES WE ARE PAYING FOR l FOUR BASIC PRINCIPLES –FOSTER GOV’T AND KTR TEAMWORK –ENSURE DISCREPANCIES ARE RESOLVED AT LOWEST POSSIBLE LEVEL –EMPHASIZE REPERFORMANCE RATHER THAN WITHHOLDING OF FUNDS –ENSURE KTR QC PLAN IS ADEQUATE

18 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) l SURVEILLANCE METHODS (2 TYPES) –PERIODIC INSPECTION FOR ONGOING PERFORMANCE FREQUENCY BASED ON TASKS PERFORMED AND QAE/FAC’S BEST JUDGMENT –ONE HUNDRED PERCENT INSPECTION FOR ALL KTR DELIVERABLES (REPORTS)

19 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) l DEFICIENCY RESOLUTION (3 OPTIONS) –VERBAL NOTIFICATION TO TASK LEADER ONLY ON NON-MISSION CRITICAL TASKS –WRITTEN NOTICE TO TASK LEADER OR PROGRAM MANAGER OPTIONAL FORM 27 ISSUED BY QAE OR FAC –WRITTEN NOTICE TO PROGRAM MANAGER AF FORM 802 ISSUED BY FAC AND CO

20 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) l CERTIFICATE OF SERVICE (COS) REPORT –REQUIRED MONTHLY –CO CAN’T OK PAYMENT WITHOUT COS –COS IS SIGNED BY THE FAC OR QAE –COST REIMBURSABLE TASK ORDERS ALSO REQUIRE REVIEW OF INVOICES TYPICAL MAN-MONTH IS 160 HRS l QAE REVIEWS –ANNUAL REVIEW OF QAES BY THE CO –ANNUAL BRIEFINGS TO THE FAC BY THE CO

21 YOUR CONTRACT REQUIREMENTS l DEVELOPING THE GOV’T ESTIMATE l PREPARING THE STATEMENT OF WORK (SOW) l PREPARING THE QASP l SAFEGUARDING THE KTR’S PROPOSAL

22 GOVERNMENT ESTIMATE l GOV’T ESTIMATE –MUST BE INDEPENDENTLY DEVELOPED INCLUDE LEVEL OF EFFORT INCLUDE ANTICIPATED TRAVEL –CAN USE EXISTING CONTRACT RATES AS BASIS FOR ESTIMATE ACC CONS & ACC PMS CAN PROVIDE ASSISTANCE

23 STATEMENT OF WORK l DESCRIPTION OF OUR NEEDS –WHAT WE WANT DONE, NOT HOW TO DO IT –BREAK INTO DISCRETE TASKS, IF APPROPRIATE –IDENTIFY ALL DELIVERABLES –INCLUDE PLACE OF PERFORMANCE AND DURATION OF TASK ORDER SERVICE CONTRACTS CANNOT EXCEED 12 MONTHS IF USING ANNUAL APPROPRIATIONS

24 STATEMENT OF WORK l INCLUDE ANTICIPATED TRAVEL REQUIREMENTS –TRAVEL CONDUCTED ON COST- REIMBURSABLE BASIS MUST BE COORDINATED & APPROVED BY QAE MONITOR CLOSELY

25 TYPE OF TASK ORDER l TYPES OF TASK ORDERS – FIRM FIXED PRICE (FFP) –COST REIMBURSABLE COST PLUS FIXED FEE (CPFF) TIME & MATERIAL/LABOR HOUR CO WILL DETERMINE MOST APPROPRIATE TYPE OF TASK ORDER AFTER REVIEW OF SOW

26 TYPE OF TASK ORDER l FIRM FIXED PRICE –LABOR AMOUNT FIXED EACH MONTH –REGARDLESS OF HOURS WORKED –ALL WORK MUST BE REQUIRED IN THE ORIGINAL TASK ORDER ADDITIONAL WORK REQUIRES MODIFICATION NOTIFY ACC CONS IMMEDIATELY

27 TYPE OF TASK ORDER l COST PLUS FIXED FEE –KTR REIMBURSED FOR ALL COSTS LABOR, TRAVEL, INDIRECT COSTS QAE MUST VERIFY PROGRESS (STATUS REPORTS/INVOICES) FINAL COST VERIFIED BY DCAA AUDITORS KTR IS ALSO PAID A FIXED FEE (PROFIT) ESTABLISHED IN THE TASK ORDER

28 TYPE OF TASK ORDER l TIME & MATERIALS/LABOR HOUR –CONTRACTOR BILLS FOR HOURS WORKED –HOURLY RATE IS SET; INCLUDES DIRECT & INDIRECT CHARGES, AS WELL AS PROFIT –QAE MUST VERIFY PROGRESS (STATUS REPORTS/INVOICES) BOTH CPFF AND T&M/LH HAVE CEILING CONTRACTOR MUST NOTIFY GOV’T WHEN 85% OF CEILING IS REACHED

29 CONTRACTOR’S PROPOSAL l DETAILS SOLUTION TO THE TASK ORDER –ACCEPTED BY GOV’T – BINDING ON THE KTR l CONTAINS PROPRIETARY DATA –PROTECT FROM UNAUTHORIZED DISCLOSURE –MUST BE SHREDDED WHEN CONTRACT IS COMPLETE

30 CONTRACTOR’S PROPOSAL l PROPOSAL WILL IDENTIFY CONTRACTOR PERSONNEL –PROGRAM MANAGER –TASK LEADER * –QUALITY MANAGER (CAAS CONTRACT) *QAES SHOULD CONTACT THE TASK LEADER FOR DEFICIENCY NOTIFICATIONS.

31 CONTRACTOR’S PROPOSAL l CONTRACTOR’S PROPOSAL –EXPLAINS KTR’S APPROACH TO ACCOMPLISH THE TASK. –SELECTION OF SUCCESSFUL KTR IS BASED IN PART ON THEIR PROPOSAL KTR IS BOUND TO PERFORM IAW THEIR FINAL PROPOSAL FAILURE TO PERFORM AS PROPOSED ASSESSED ON PERFORMANCE RATING

32 QAE RESPONSIBILITIES l DOCUMENTATION –DOCUMENT EVERYTHING –USE QAE LOGBOOK WRITTEN OR ELECTRONIC INCLUDE DATE AND TIME FOR EACH ENTRY NOTE DELIVERABLES & ACCEPTANCE ALL DEFICIENCIES/RESOLUTIONS RECORD AUTHORIZED TRAVEL

33 QAE RESPONSIBILITIES l QAE FILES –QAE APPOINTMENT CORRESPONDENCE –TASK ORDER/MODIFICATIONS –LOGBOOK, GENERAL CORRESPONDENCE –CONTRACTOR’S QCP –DELIVERABLES/REPORTS –COS REPORTS –CONTRACTOR INVOICES (CPFF, T&M/LH ORDERS)

34 QAE RESPONSIBILITIES l PERIOD OF PERFORMANCE SPECIFIED IN EACH TASK ORDER –CANNOT EXCEED 12 MONTHS IF USING ANNUAL APPROPRIATIONS l IF CONTINUED SERVICES ARE NEEDED –PREPARE NEW PACKAGE 90 DAYS PRIOR TO TASK ORDER COMPLETION –COORDINATE WITH ACC PMS/XR IF ADVISORY & ASSISTANCE SERVICES

35 l QUESTIONS?