Lily Lake Solar Farm “Ontario’s First 10 MW Municipally Owned Solar Farm”

Slides:



Advertisements
Similar presentations
Sustainable Energy Innovation A New Era in Solar Dominic Drenen – Manager Solar Energy Systems.
Advertisements

October 16, 2013 Feed In Tariff (FIT) and Renewables Procurement in Ontario Dirk van de Waal – Business Analyst, Renewables Procurement.
The SunAirCool Eco Power Station
Green Energy Co-operative of Ontario Introduction to H.A.R.E. (Hamilton Association for Renewable Energy)
Community Choice Aggregation Renewable Energy for your Home and Business July 16, 2013.
Jan Buijk Biogas Fuelled Cogeneration Systems.
1 PSE&G’s Solar 4 All™ Program: Pole-Attached Solar Installations in Your Area December 22, 2009 January 12, 2010.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
A SUSTAINABLE ENERGY COMPANY. VISION  Informed Energy Solutions Inc. is committed to promoting environmental stewardship through renewable energy and.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Understanding Ontario’s Electricity System
25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large.
What is Solar Power? A Simple Example How Does Solar Work? Where do we use Solar Power? What is Photovoltaic Power? What are the Components of a Solar.
1 Economic Advantages of Community Power Khlaire Parré, MA, PMP Ontario Sustainable Energy Association.
Solar Power: Types, Capacities, Potential What is solar power? R. Todd Gabbard, LEED-AP, Assoc. AIA Asst. professor, Dept of Architecture, KSU
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
SOLAR CELL PRESENTED BY ANJALI PATRA ANKITA TRIPATHY BRANCH-EEE.
A Collaboration of two Co-operatives World Wind Energy Association Annual Conference, Kingston, Ontario, Canada 2008 Jun 25 Wed Doug Fyfe General Manager.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Solar Power EDSGN 100 Sec. 13 Design Team 1 Kyle Feaster Alex Shivetts Kait Levin.
Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy.
Slide 1 Patents Pending © SolFocus, Inc Solar CPV 201 September 15, 2010 Kelly Desy Manager, Government Relations and Public Policy.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
MECH 4692 / 7470 Renewable Energy. Introduction  John Woods, P. Eng.  B.Sc. EE 1983 University of Manitoba  M.Sc. EE 1986U of M  PhD ?U of.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
1 Managing Renewables Integration Valerie Fong Utilities Director Power Association of Northern California September 17, 2013.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Presentation to San Diego Sierra Club Richard Caputo 12 Nov 07 Renewable Energy Parks.
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
MEC: Customer Profitability Models Topic DSM – DR, Advanced EE and Dispatch Ability Jesse Langston, OG&E Oct 20 th 2013.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Energy Sector ETAAC Meeting July 2, 2007 Sacramento, CA.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Demand Response How to make money by not using electricity?
City of Fort Collins Wind Power Program March 24, 2004 John Phelan, PE Energy Services Engineer.
Ontario’s Future Energy Plan Abridged. Ontario’s Electricity Accomplishments Until 2003, ___% of electricity generation came from polluting.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Colorado Harvesting Energy Network Jonathan Moore Director, Renewable Energy Development
WFEC and Its Rural Electric Cooperative Members Solar Power October 16, 2015 Fall PR-MR & Marketing Meeting.
Regional Recycling Solutions, LLC.   County purchased 103 acres in July of 1993 from Greene Land Company  Elchin Inc purchases 40 acres in April 1998.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
Net Metering Implications for Community Shared Solar and Security Exchange Commission Considerations.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
Presented to: Wisconsin Industrial Energy Group Board of Directors May 8, 2008 Alliant Energy Generation Update.
Medors.in DESCRIPTION Off-grid refers to not being connected to a grid generally National grid Off-the-grid homes are autonomous, they do not rely on.
15MW ac UTILITY SCALE SOLAR FARM Municipal Association of Victoria 12 th July 2016.
Allington Waste Management Facility
15MWac UTILITY SCALE SOLAR FARM
PV SOLAR PROJECT OPPORTUNITIES
Green Energy and Green Spaces
Dale Davis – President, CMI Solar & Electric, Inc.
Development of Solar PV Projects on Brownfields
Grafton Solar Photovoltaics (PV) March 28, 2013
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Module 40 Planning Our Energy Future
15MWac UTILITY SCALE SOLAR FARM
Community Solar Clearinghouse Solution Program (CS2)
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

Lily Lake Solar Farm “Ontario’s First 10 MW Municipally Owned Solar Farm”

Peterborough Utilities Inc. (PUI) has constructed a new 10.0 MW solar PV generating facility on approximately 140 acres of rural lands located at the northwest corner of Lily Lake Road and Fife’s Bay Road across from Hydro One’s Dobbin Transformer Station. PUI has developed the project in an environmentally responsible manner in accordance with applicable legislation and to following up on project related commitments. PUI has completed the Environmental Impact Statement (EIS) and has obtained the requisite permits for the project from the Otonabee Region Conservation Authority (ORCA) and Ministry of the Environment. PUI has committed to creating a minimum 30 meter buffer between the project and Middle Jackson Creek wetland. Within this buffer, PUI will replant trees and allow existing agricultural lands to return to a natural environment. PUI has committed to planting five new trees for every tree removed from the project properties. PUI will be working cooperatively with neighbouring residences regarding options to screen the view of the solar farm with the intent of completing this work by the fall of The Lily Lake solar farm will provide a number of environmental and social benefits (wetland protection, local employment & service contracts) and will produce enough energy annually to supply approximately 1,500 homes with green energy. About the Facility

The Lily Lake Solar Farm has a capacity of 10 MWac comprised of 20 solar blocks of 500 kWac. The facility will utilize thin film amorphous silicon (a-Si) solar PV modules from two different suppliers. Thin film a-Si solar panels are less efficient than crystalline silicon solar but are significantly less costly to manufacture, more flexible and durable, and able to absorb more diffuse light than crystalline silicon solar panels. Phase 1 will comprise 5 solar blocks of 500 kWac and will utilize a total of 9,600 Optisolar solar PV panels. Each Optisolar panel is 2 m high by 3 m wide comprised of twelve solar PV modules of 0.5 m by 1.0 m arranged in a 4 x 3 grid and generates between 305 and 372 Watts. Phase 2 will comprise 15 solar blocks of 500 kWac and will utilize a total of 94,230 Masdar PV solar modules assembled on 3,490 panels. Each Masdar solar panel is approximately 4.0 m high by 10.0 m wide comprised of twenty seven solar modules of 1.1 m by 1.3 m arranged in a 3 x 9 grid, and generates between 2,295 and 2,700 Watts. Fact Sheet

Fact Sheet (cont’d) PUI has a Renewable Energy Standard Offer Program (RESOP) contract with the Ontario Power Authority (OPA) for the project with a 20-year term and a fixed rate of 42 cents per kWh. PUI has a completed Connection Impact Assessment (CIA), Connection Cost Recovery Agreement (CCRA) and Distribution Connection Agreement (DCA) with Hydro One Networks Inc. for the project that permits connection and operation of the facility on Hydro One’s local distribution grid. The general contractor for the project was Miwel Construction. At the peak of construction, the project employed approximately 120 workers. Masdar panels were assembled off-site within a warehouse and delivered to site fully assembled to facilitate construction during the winter. The facility entered into commercial opeation in early April 2011 with the entire 10 Mwac project completed in late June 2011.