Project Management Software Application PRM 705 Lecture 19.

Slides:



Advertisements
Similar presentations
MS Project.
Advertisements

FUNCTIONAL ICT LEVEL 2 Advanced Excell. Data types.
Project Management 6e..
ORÇUN B İ LEN Maintenance involves fixing any sort of mechanical or electrical device which has become out of order or broken. It also includes.
Recap Chapter 6. Product-Process Matrix 6-2 Volume Flexibility/Variety The diagonal represents the “ideal” match Hybrid process are possible (e.g., job-shop.
Asset Management Lecture 10. Table 27.2 Make up a view and replace the one in spreadsheet Recalculate the optimal asset allocation and portfolio.
Project Management Software Application PRM 705 Lecture 27.
Selection Sort
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management Software Application PRM 705 Lecture 30.
Quiz#1 Chapter 5: Estimating Project Times and Cost
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Advanced Scheduling In MS Project Provided by FrontRange MPUG.
Ahmad Al-Ghoul. Learning Objectives Explain how to begin working in your project by Gathering Information, Determining detail tasks, Determining detail.
Software Project Management Lecture # 7. Outline Project Scheduling.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTERMEDIATE COURSE.
Project Management Software Application PRM 705 Lecture 23.
Corporate Overview. Established in 1999 as development partner of IBM California based with R&D facility located in Timisoara, Romania Grown to over 270.
Microsoft Project – Tutorial 4 Assigning Resources to Tasks Switch to the Gantt Chart View Then click the Assign Resources button on the Standard toolbar.
Creating Effort Driven Schedules.  Objectives Understanding Your Job and the Tools Job Understanding Task Types Six Steps to an Effort Driven Project.
Project Management Software Application PRM 705 Lecture 32 1.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Estimating Project Times and Costs Chapter 5.
Project Management Software Application PRM 705 Lecture 15 Mian Wasim Irshad.
Planning BOMS or Product Families: That is the Question? Jerry Edwards.
Project Management Software Application PRM 705 Lecture 4 Mian Wasim Irshad.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Management Software.
Estimating projects Estimating  The process of forecasting or approximating the time and cost of completing project deliverables  The task of balancing.
Resource analysis Project management (lecture + seminar)
Microsoft Project – Tutorial 4 Work, Duration and Units work = duration * units units are Resources open LAN-4-2 save it with your initials as usual click.
General HP LaserJet/DeskJet Printer Maintenance Training 4 Provided by: 4 Ed Quillian 4 For: 4 Harris PC-Technicians, EIT Dept.
Selection Sort
Project Management Software Application PRM 705 Lecture 29.
Project Management Software Application PRM 705 Lecture 16 Mian Wasim Irshad.
Project Management Software Application PRM 705 Lecture 24.
Project Management Software Application PRM 705 Lecture 22.
Monitoring Risk Factors General attitude of team members based on project pressures The degree to which the team is jelled Interpersonal relationships.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Resource analysis 1 Project management (seminar).
10/23/2009 Alpha Prototype. 10/23/2009 TOPICS FOR TODAY Project Schedule o Achievements o The last few weeks... System Design and Architecture (new) Prototype.
Celeris Systems Microsoft Project Association March 7, 2007.
E. M. Hanna; 7/31/03 DXI Management Consulting 1 Resource Leveling.
Shortlisting applicants. Today’s case study task: Using the information and advice provided in your case study materials: Choose the 2 best applicants.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Microsoft Project Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In:1 (800)
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Project Management 6e..
Project Management 6e..
Estimating Project Times and Costs
Estimating Project Times and Costs
Project Management Software Application PRM 705
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Project Management Software Application PRM 705
Estimating Project Times and Costs
Estimating Project Times and Costs
ACG 3351 Innovative Education--snaptutorial.com
MS Project 2016 Level II
In this tutorial you will:
مدیریت استراتژيک منابع انسانی
The 4 Functions of Management
Familiar Metrics Management
Operations Manager- the person responsible for supervising the production of goods and services for the company. 7 activities of the operations manager.
Work Breakdown Structure
A summary of part 1 of Chapter 7 CEP 812 Kay Paff March 24, 1999
Ռազմավարական կառավարում
OUTLINE Questions? News, Experiences? Chapter 3
Estimating Project Times and Costs
CGS 3763 Operating Systems Concepts Spring 2013
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
THANK YOU for helping make tonight possible
Presentation transcript:

Project Management Software Application PRM 705 Lecture 19

Recap Assignment units Accrual at fix cost Effort driven scheduling Resource allocation

Today’s Outline Changing resources Fixed Cost Creating S-Curve Tables Grouping Sorting Filtering Work contours

To Resolve Over Allocation 1.Replace the resource 2.Change the relationship 3.Change the percentage of allocation 4.Perform automatic leveling (Not recommended) Resource > Level Resource

Fixed Cost Sometimes a fixed cost is associated with a task, such as the cost of equipment used to accomplish the task, or a job bid on a flat rate. Such costs are fixed because they remain constant even if a task takes more or less time than planned.

Setting Fixed Cost for a Task

Creating “S Curve” Project > Visual Report > Cash Flow

Tables

Creating Your Own Customized Tables

Grouping

Sorting

Filters

Res. Assignment Information

Work Contour

Thank You