IBL CO 2 cooling control system development status 19.03.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
André Augustinus 16 June 2003 DCS Workshop Safety.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Michal Zimny Cracow University of Technology Seminar - Internship programmes at CERN PH-DT-DI.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
60kW Thermosiphon control system
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Alice TOF Production Readiness Review Gas Control Systems.
S A Griffiths CM42 June 2015 Electrical & Control.
Internship final report Joanna Staniszewska Cracow University of Technology –
Experience in Design and Implementation of CO2 Cooling Control Systems
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Forum on Tracking Detector Mechanics - Bonn, May 2016
IBL CO2 cooling control system development status
LCLS-II Cryoplant Controls Readiness to Procure
352MHz Klystron Control for the 3MeV Linac test stand
MAUVE CO2 cooling review
Insertable B Layer Cooling System
KAGRA PLC System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
Presentation transcript:

IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC

Presentation overview: Hardware A) control cabinets B) accumulator local box System architecture Electrical connections Cabling Control system development status: Fixed control rack position Prepared first version of control documents: -ATLAS IBL CO2 Cooling Station Functional Analysis For Continuous Process Control (CPC) EDMS Specification of control interface between cooling control system and ATLAS Detector Control System EDMS IBL CO2 cooling control system development

Status: Control/electrical rack layout design completed Electrical schematics nearly completed by Florian 95% of control hardware components ordered and delivered Assembly by EN/CV already started Control cabinets Lukasz Zwalinski IBL 18 th March 2013 IBL A IBL B Layout prepared by S.Berry

Intermediate control box for maintenance operation Lukasz Zwalinski IBL 18 th March 2013 What does it serves for? local maintenance manipulation independent from control racks! Status: Rack layout design completed Electrical schematics completed by Maciej Assembly in PH/DT started Still minor components to be ordered Front panel to be graved with P&ID by NIKHEF Characteristics -Individual 24V DC hot swappable power supplies -Separate 230V power -Local valve position indicators (LED + signal send to both PLCs) -Local valve manipulation panel -Local vacuum pressure indicator -Local vacuum pump start/stop with protection -Emergency switch

System architecture OWS Premium CPU IBL plant B Local MODBUS TCP/IP Pneumatic lines FESTO WAGO I/Os EN/CV Terminal server Detector Control System ATLAS DSS Local Touch Screen Hardware signals DIP Central Control Room IBL plant A Local MODBUS TCP/IP Pneumatic lines FESTO WAGO I/Os Local Touch Screen Critical data tunnel from PLC to DCS Premium CPU Lukasz Zwalinski IBL 18 th March 2013

System architecture Lukasz Zwalinski IBL 18 th March 2013 System architecture conclusions: 1.PVSS server location agreed with ATLAS ID and DCS to be in CCC 2.Server is already installed in CCC 3.The data base for long data storage has to be selected! (ATLAS vs LHC TIMBER) 4.PLC will send ~20 most critical signals with direct MODBUS protocol to the DCS 5.Rest of the signals will be send to DCS using the DIP protocol 6.The UNICOS library extended for WAGO Ethernet IP modules 7.There will be common accesses from Detector Cooling CCM IBL A IBL B

Status: Architecture, power requirements and electrical hardware discussed with Wieslaw Iwanski & EN/EL James Devine EN/EL with an agreement of the EN/CV will provide us ASAP Information about the staring point Florian will make TRACIEL calculations to verify protection sizing and guarantee correct selectivity Wieslaw agreed to supply all IBL control system from UPS UPS feeder will be decided depending on whether or not IBL system shall be – and if so in which part – interlocked with DSS ??? Electricity, system powering – ATLAS UPS Lukasz Zwalinski IBL 18 th March 2013

Status: Cable schedule with patching details completed (cable size, pinouts, wire colours NIKHEF is informed and terminals are send to them with patching details Signal cables installation between USA15 and UX15 already started by S. Malyukov Power cable for dummy load still need to be pulled once the TRACIEL calculations are completed Thermocouple type K halogen free cable for dummy load protection has to be purchased and pulled DSS and Bake-out cables has to be pulled whenever we know the destination racks Input file to print out ATLAS DB cable labels ready for Irina Malyukova The communication with Bake-out system has to be defined (we send 24V or Bake-out system sends 24V?) Cabling Lukasz Zwalinski IBL 18 th March 2013 Chiller A Cooling Plant A Cooling Plant B Chiller B Accumulator A&B Control A Control B Junction Box in UX15 Maintenance Box USA15 Level 3

Thank You Lukasz Zwalinski IBL 18 th March 2013