Flexible Budgets and Variance Analysis JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP.

Slides:



Advertisements
Similar presentations
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Advertisements

THE PRODUCTION CONCEPTS. JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA- ECONOMICS, B.COM. ECONOMICS OF ICMAP, ICAP, MA- ECONOMICS, B.COM. FINANCIAL ACCOUNTING.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Budgeting.
Slide # 1 STANDARD COSTING & VARIANCE ANALYSIS KHALID AZIZ FRESH CLASSES MA-ECONOMICS 15 TH FEBRUARY 2010.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Direct Input Variances, and Management Control: I Chapter 7.
The Islamic University –Gaza
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
1-1.
JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM.
The Law of Equi-Marginal Utility ………
The Market Forces of Supply and Demand
Accounting for Overhead .
Inventories: IAS 2. JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE B, B.COM, BBA,
KHALID AZIZ COMMERCE EXPERT Externalities. KHALID AZIZ COMMERCE EXPERT JOIN KHALID AZIZ  ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM.  FINANCIAL ACCOUNTING.
Strategy and the Master Budget. 2 JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE.
1-1 PRODUCT COSTING 2. JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE B, B.COM,
Product Costing Systems
1 The Master Budget 2 JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE B, B.COM,
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Performance Evaluation for Decentralized Operations & TRANSFER PRICING.
Decision Making and Relevant Information. JOIN KHALID AZIZ FRESH CLASSES OF ICMAP STAGE 1 FUNDAMENTALS OF FA & ECONOMICS. FRESH CLASSES OF ICMAP STAGE.
Basic Accounting Principles The Financial Statements.
Accounts Receivable, Inventory, and Total Quality Management.
1 - 1 The Accountant’s Role in the Organization JOIN KHALID AZIZ l ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. l FINANCIAL ACCOUNTING OF ICMAP.
Flexible Budget, Overhead Cost Variances and Management Control
Throughput Accounting
Inventory Management, Just-in-Time, and Backflush Costing.
UTILITY ANALYSIS Utility is the Power of a Commodity to satisfy human wants. There are two different Approaches to Utility Analysis Cardinal approach to.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Elasticity and Its Application. JOIN KHALID AZIZ n ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. n FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE.
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Flexible Budgets and Variance Analysis
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
1 Absorption and marginal costing. 2 JOIN KHALID AZIZ FRESH CLASSES FOR ICAP MODULE D…COST ACCOUNTING REGISTER YOUR SELF NOW COMPLETION OF SYLLABUS WITH.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
1 Chapter Eleven Standard Costs and Variance Analysis.
The effect of price and income on demand quantities ELASTICITY OF DEMAND.
1 Budgeting as a control mechanism 1. Budgeted levels are the standards to follow in operation 2. Variance evaluation for performance measurement A variance.
ACC3200 STANDARD COSTING.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Flexible Budgeting Chapter 07, 08
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
KHALID AZIZ 0322* The Measurement Fundamentals of Financial Accounting.
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Introduction to Management Accounting
Performance Evaluation Using Variances from Standard Costs
Flexible Budgets and Variance Analysis.
© 2017 by McGraw-Hill Education
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
© 2017 by McGraw-Hill Education
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Flexible Budgets and Variance Analysis

JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE B, B.COM, BBA, MBA & PIPFA. COST ACCOUNTING OF ICMAP STAGE 2,3 ICAP MODULE D, BBA, MBA & PIPFA. CONTACT: R-1173,ALNOOR SOCIETY, BLOCK 19,F.B.AREA, KARACHI, PAKISTAN.

JOIN KHALID AZIZ o FRESH CLASSES o ICMAP STAGE 3 o FINANCIAL ACCOUNTING & COST ACCOUNTING PERFORMANCE APPRAISAL o INDIVIDUAL & GROUPS

JOIN KHALID AZIZ FRESH CLASSES ICMAP STAGE 1 & 2 FUNDAMENTALS OF FINANCIAL ACCOUNTING & COST ACCOUNTING INDIVIDUAL & GROUPS

Favorable and Unfavorable Variances ProfitRevenue Costs Actual > Expected F F U Actual < Expected U U F Favorable variances arise when actual results exceed budgeted. Unfavorable variances arise when actual results fall below budgeted. Favorable (F) versus Unfavorable (U) Variances

Static and Flexible Budgets A static budget is prepared for only one level of a given type of activity. Differences between actual results and the static budget for level of output achieved are static-budget variances. Learning Objective 1 A flexible budget (variable budget) adjusts for different levels of activities. Differences between actual results and the flexible budget are flexible-budget variances.

Flexible Budget Formulas To develop a flexible budget, managers determine revenue and cost behavior (within the relevant range) with respect to cost drivers. Learning Objective 2 Note that the static budget is just the flexible budget for a single assumed level of activity.

Activity-Based Flexible Budget An activity-based flexible budget is based on budgeted costs for each activity and related cost driver. For each activity, costs depend on an different cost driver. Learning Objective 3

Evaluation of Financial Performance 2) revenue or variable costs per unit of activity and fixed costs per period were not as expected. Actual results may differ from the master budget because... 1) sales and other cost-driver activities were not the same as originally forecasted, or Learning Objective 4

Evaluation of Financial Performance Units 7,000 – 7,000 2,000U 9,000 SalesRs217,000 – Rs217,000 Rs62,000 U Rs279,000 Variable costs 158,200 5,670 U 152,600 43,600 F 196,200 Contribution marginRs 58,730 Rs 5,670 U Rs 64,400 Rs18,400 U Rs 82,800 Fixed costs 70, U 70,000 – 70,000 Operating incomeRs (11,570) Rs5,970 U Rs(5,600) Rs18,400 U Rs 12,800 Actual results at actual activity level (1) Flexible- budget variances (2) = (1)-(3) Flexible budget for actual sales activity (3) Sales- Activity Variance (4) = (3)–(5) Static Budget (5)

Isolating the Causes of Variances Managers use comparisons among actual results, master budgets, actual results, master budgets, and flexible budgets to evaluate organizational performance.

Isolating the Causes of Variances Effectiveness is the degree to which a goal, objective, or target is met. Performance may be effective, efficient, both, or neither. Efficiency is the degree to which inputs are used in relation to a given level of outputs.

Flexible-Budget Variances Total flexible-budget variance = Total actual results – Total flexible-budget planned results Flexible-budget variances ActualresultsRs(11,570)FlexiblebudgetRs(5,600)Learning Objective 5 Rs5,970 Unfavorable

Sales-Activity Variances Total sales - activity variance = Actual sales unit – Master budgeted sales units × Budgeted contribution margin per unit Activity-level variances (7,000 – 9,000) × Rs9.20 Rs18,400 Unfavorable Flexible budget Master budget =

Setting Standards An expected cost is the cost that is most likely to be attained. A standard cost is a carefully developed cost per unit that should be attained. Perfection (ideal) standards are expressions of the most efficient performance possible under the best conceivable conditions, using existing specifications and equipment. No provision is made for waste, spoilage, machine breakdowns, and the like.

Currently Attainable Standards... are levels of performance that managers can achieve by realistic levels of effort. They make allowances for normal defects, spoilage, waste, and nonproductive time.

Trade-Offs Among Variances Improvements in one area could lead to improvements in others and vice versa. Likewise, substandard performance in one area may be balanced by superior performance in others.

When to Investigate Variances When should management investigate a variance? Many organizations have developed such rules of thumb as “investigate all variances exceeding Rs5,000 or 25% of expected cost, whichever is lower.”

Comparison with Prior Periods Some organizations compare the most recent budget period’s actual results with last year’s results for the same period. These comparisons are not as useful as comparisons of actual outcomes with planned results.

Flexible-Budget Variance in Detail Standard per unit of output: Std. inputs Flexible expected Budget Amount expected Budget Amount Direct Material5 pounds Rs 2 /pound Rs10 Direct Labor ½ hour Rs16/hour Rs 8 Std. price expected

Variances from Material and Labor Standards Actual results for 7,000 units produced: Direct material Pounds purchased and used: 36,800 Price/pound: Rs1.90 Total actual cost: Rs69,920 Direct labor Hours used: 3,750 Actual price (rate): Rs16.40 Total actual cost: Rs61,500

Variances from Material and Labor Standards Units of good output achieved Input allowed per unit of output Standard unit price of input × × = Flexible Budget or Total Standard Cost Allowed

Variances from Material and Labor Standards (1) (2) (3) (1) (2) (3)Flexible Actual Flexible Budget Actual Flexible Budget Costs Budget Variance Costs Budget Variance Direct Materials Rs69,920 *Rs70,000 Rs 80 F Direct Labor 61,500 **Rs56,000 Rs5,500 U Standard Direct-Labor Cost Allowed: 7,000 units X 1/2 hour X Rs16 per hour = Rs56,000** Standard Direct-Materials Cost Allowed: 7,000 units X 5 pounds X Rs2.00 per pound = Rs70,000*

Price and Quantity Variances (Actual quantity used – standard quantity allowed for actual output) × Standard price (Actual price – Standard Price) × Actual quantity used Learning Objective 6

Price Variance Computations (Rs16.40 – Rs16.00) per hour × 3,750 hours = Rs1,500 U (Rs1.90 – Rs2.00) per pound × 36,800 pounds = Rs3,680 F

Quantity (Usage) Variance Computations [3,750 – (7,000 × ½)] hours × Rs16 per hour = Rs4,000 U [36,800 – (7,000 × 5)] pounds × Rs2 per pound = Rs3,600 U

Favorable or Unfavorable Variance? To determine whether a variance is Favorable or unfavorable, use logic rather than memorizing a formula. A price variance is favorable is the actual price is less than the standard. A quantity variance is favorable if the actual quantity used is less than the standard quantity allowed.

JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE B, B.COM, BBA, MBA & PIPFA. COST ACCOUNTING OF ICMAP STAGE 2,3 ICAP MODULE D, BBA, MBA & PIPFA. CONTACT: R-1173,ALNOOR SOCIETY, BLOCK 19,F.B.AREA, KARACHI, PAKISTAN.

Direct Materials Flexible Budget Variance Direct-Labor Flexible-budget variance: Rs1,500 unfavorable + Rs4,000 unfavorable = Rs5,500 unfavorable Direct-Materials Flexible-budget variance: Rs3,680 favorable + Rs3,600 unfavorable = Rs80 favorable

Interpretation of Price and Usage Variances Price and usage variances are helpful because they provide feedback to those responsible for managing inputs. Managers should not use these variances alone for decision making, control, or evaluation.

Variable-Overhead Spending and Efficiency Variances A variable-overhead efficiency variance occurs when actual cost-driver activity differs from the standard amount allowed for the actual output achieved. A variable-overhead spending variance occurs when the difference between the actual variable overhead the difference between the actual variable overhead and the amount of variable overhead budgeted for the actual level of cost-driver activity. Learning Objective 7

Variable-Overhead Variances variable- actual standard standard overhead cost-driver cost-driver variable-overhead efficiency activity activity rate per variance allowed cost-driver unit X = - variable- actual standardactual overhead variable variable-overhead cost-driver spendingoverhead rate per unit activity variance of cost-driver used =X -

Fixed Overhead Spending Variance The difference between actual fixed overhead and budgeted fixed overhead Is the fixed overhead spending variance. Learning Objective 8

JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE B, B.COM, BBA, MBA & PIPFA. COST ACCOUNTING OF ICMAP STAGE 2,3 ICAP MODULE D, BBA, MBA & PIPFA. CONTACT: R-1173,ALNOOR SOCIETY, BLOCK 19,F.B.AREA, KARACHI, PAKISTAN.