Members: Margaret Symmes Mark Garber Michael Wanless Song Ju Kim.

Slides:



Advertisements
Similar presentations
Michael Kubler Managing Director Presentation: Multipath Storytelling.
Advertisements

Shared Space Admin Demo March Admin demo introduces - Adding users Moderating users Moderating resources Adding communities and sub groups.
A SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas. A SharePoint site is a tool.
COMMUNICATION TECHNOLOGY IN A CHANGING WORLD A = 3 C=4 D=1 E=1 G=3 H=2 I=4 L=2 M=2 N=6 0=5 R=1 T=2 U=1 W=1 Y=1.
All in the Spirit of Teamwork Tyler Wade
Project Owner: Ron Sweatland Team Members: Jamar Salmon (Project Manager) Cody Collins Jeff Melara Joshua Berner 1.
Matt Guthrie, Christopher Kreps, Ryan Borth. Objectives  To construct and assemble an assigned project in Catia  Conduct a complex project with multiple.
Useful free software. Skype Free phone calls (to computers) Free video calls Video chat Get help from family members Cheap phone calls (to phones) Download.
BASIC LAYOUT WITH SMALL FLORAL Edit Layout: Click Layout in the top menu Home. And choose between +30 different layouts. Edit Header and footer: In the.
1 Uploading and Publishing New Tools Michael McLennan Software Architect HUBzero™ Platform for Scientific Collaboration This work licensed under Creative.
ILASFAA: 2014 Doing More With Less Presented by: Tina Baskin Director of College Aid.
1 2
CCT355H5 Final Presentation R Nicholls Distribution Nicholas Wiradharma Jamie Robinson.
Submitting your work online This is a two stage process 1.First you need to add your submission to Moodle, this is usually done by uploading one or more.
Managing your website in OpenCMS Yvonne Aburrow Web Services Team.
“Team Snap” for Dummies Tutorial for Brighton Youth Boys Lacrosse
Emergency Communication Tree Procedures. The Emergency Communication Tree procedures enhance the company’s current objectives around emergency preparedness.
Collaborative Workspace Team Sutica!.  Collaborative Workspace  Advantages  Disadvantages  Insights  What We Posted  Demo.
Fort Worth Area Swim Team Year-round competitive swim program for ages 6 to adult. Location: Wilkerson-Greines Activity Center Pool at IH-20 and Wichita.
Step 4 Presenter: Updated 6/21/2013. Training Overview Introduction Walk Through Step 4 Scheduled FET Trainings & Completion Dates for FET Step(s) Question(s)
File Server Systems Administration Set Up Access Rights for Each Directory, File –The ability to even see a directory or file (otherwise, it will be invisible)
Ensures project work is divided evenly and everyone has the necessary resources to keep the project on track as well as making sure all members contribute.
Riordan Manufacturing Going Green Team Member Names Here University of Phoenix.
Developing personal and team effectiveness using IT
Presented by: Mark Forgette Patrick Fritz-Morkin Riley Schiefelbein 1.
William Sanborn Pfeiffer Kaye Adkins
Lesson 2: Web Development Teams
Cobb County Schools Introductions Support Team of 6 New Mindset Inspirational Video Activity District Priorities Burning Issues Celebrations Survivors,
Collaborative Workspace Team Sutica!.  Collaborative Workspace  Advantages  Disadvantages  Insights  What We Posted  Demo.
Assembling Lego Bricks. Click File and New Choose Assembly.
Production Planning and Control.  APP does not account for the detailed timing of flow within the production system  MRP material requirement planning.
Gothenburg May 2015 The Latest Trends in Dry Cargo Trade.
Membership/Member Involvement Public Relations Public Boating Course Manager.
Hands On time! Screencast-O-matic 20 min length Cannot edit If need to add any features, need to open in paint(if file is saved as jpeg) Snag It.
By Joshua Mello. The Tower of Babel  The tower of Babel was man’s second major engineering feat.  Noah’s ark being the first great engineering project.
Presented by: George Elias MULTISITE COLLABORATION TOOLS.
Members: Margaret Symmes Mark Garber Michael Wanless Song Ju Kim.
TE-MPE-EM: Subcontracting Raphaël Berberat
Team Work Project Timeline – Approximate dates Team Duties – Individual team contributions Team Work Issues & Resolutions.
Brian Varela Group F February 2, 2010  Collaboration occurs when two or more people work together to achieve a common ◦ Goal ◦ Result ◦ Work product.
Project 1 Data Communication Spring 2010, ICE Stephen Kim, Ph.D.
2-1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Chapter 2 Mastering Team Skills and Interpersonal Communication.
 In My.Wartburg you can…  Facilitate Class Discussions  Allow students to research topics, reflect, and all students contribute  Learning Teams 
ONLINE GROUP LEARNING… Challenges and Solutions!.
Some Great Benefits You Can Avail By Joining a Private Country Club
6 Important Things to Consider Before Opting for a Cocktail Wedding Reception
Area Covered. Work Done Quantity Financial Progress of work.
HOW TO SEND A GIANT 1GB FILE USING DROPBOX.
International Lego Design Project
Rogers customer service Rogers support number
Phone: + 40 (728) | +40 (733)
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Session 4: Total Quality Management
Using Glip for Lab Management
SCC Supplier Performance Management (SPM) Training
Guidance for Proposers Day Poster
Useful free software.
ME 280 Lab Final Project Begins November 3rd for sections 3, 4 and 5, and November 7th for sections 1 and 2 Due December 1st for sections 3, 4 and 5 and.
How will Dropbox work for Team Projects?
TES Data Platform Providing business users with the tools to connect share and analyse data 2018.
Kinetic LEGO Sculpture
ME 280 Lab Final Project Begins March 20th for sections 4 and 5, and March 21st for sections 1, 2 and 3 Due April 17th for sections 4 and 5 and April 18th.
TG-1101 Engineering Design I Assembly & Sub-Assembly Drawings
ME 280 Lab Final Project Begins November 5th for sections 4 and 6, and November 9th for sections 1, 2 and 3 Due December 2nd for sections 1, 2 and 3 and.
Guidance for Proposers Day Slide
ME 280 Lab Final Project Begins November 4th for sections 3, 4 and 5, and November 8th for sections 1 and 2 Due December 2nd for sections 3, 4 and 5 and.
ME 280 Lab Final Project Begins March 22nd for sections 4 and 5, and March 23rd for sections 1, 2 and 3 Due April 19th for sections 4 and 5 and April 20th.

Presentation transcript:

Members: Margaret Symmes Mark Garber Michael Wanless Song Ju Kim

 To create a 3D model of a Lego Cargo Ship in collaboration with a design team in Quebec.

 A master block and general unit system was used to ensure that parts modeled by all groups were compatible.  Most communication was done by phone and , and files were shared over Dropbox.

 One of two sub-assemblies that the University of Idaho team was responsible for.

 The snap function was used to assemble the parts for sub- assemblies. This simplified the design tree and made editing assemblies much easier.

 The assembly references the sub- assemblies that contribute to it by assembly number and quantity.  The sub-assemblies reference the parts that contribute to it by part number and quantity