Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.

Slides:



Advertisements
Similar presentations
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Advertisements

A Multimodal Goods Movement Strategy for Ontario Canada-United States Transportation Border Working Group Fall Plenary November 7 – 8, 2012 James Perttula.
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Briefing for the Transportation Border Working Group November 8,
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
The Alameda Corridor: Lessons Learned Presented to: UCI Conference on the New Generation of Transportation Financing in California Costa Mesa, CA Gill.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Spokane Transportation Planning Partnerships August 23, 2013.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Elk Grove – Rancho Cordova – El Dorado Connector Project Elk Grove – Ranch Cordova – El Dorado Connector Joint Powers Authority Project Briefing JPA Board.
Transportation Border Working Group Chicago Plenary - Ottawa Update April 29, 2009 Ted Mackay, Transport Canada.
Detroit Intermodal Freight Terminal Michigan Department of Transportation Gloria J. Jeff, Director Michigan Department of Transportation.
Presented by: Detroit International Bridge Company Canadian Transit Company March 27, 2010 Ambassador Bridge U.S plaza of the bridgeCanadian plaza of the.
Longmeadow Parkway Fox River Bridge Corridor
MTF Rail Development Forum
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Canada Auto industry Part 2. Historical Maps
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
1 Presentation for Border Transportation Partnership Detroit River International Crossing May 31, 2005.
August 2011Beyond the Border1 Beyond the Border: A Shared Vision for Perimeter Security and Economic Competitiveness CSG-ERC Canada-U.S. Relations Committee.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Transport Investing in Regions SEATS Meeting 17 February 2012.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
IAIA 2007, Seoul, South Korea Detroit River International Crossing Project Navigating the Multi-Jurisdictional Maze for a Large-Scale Transportation Project.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
Canada Border Services Agency Update Presentation to: Transportation Border Working Group Bellingham, Washington June 7, 2006.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador.
Southwestern Ontario Border Wait Time Project Update Mike Barnet, P.Eng Intelligent Transportation Systems Program Ministry of Transportation of Ontario.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
The Canada Border Services Agency and Coordinated Border Management Regional Conference of Customs Directors General, April 22-25, 2012.
POS Regional Transportation Investments Viaduct/Seawall Discussion September 15, 2004.
Canada’s Asia-Pacific Gateway and Corridor Initiative 2006.
The Border, Canada-US Trade and the Post-9/11 Security Regime with implications for Immigration and Diversity.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
USA Parkway Project Welcome Public Information Meeting to the
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Transport Action Ontario Detroit River International Crossing (DRIC): Road Based Infrastructure In the Era of Climate Change.
TBWG – Ottawa Update Quebec City, October 28, 2010 Ted Mackay, Transport Canada.
The TBWG/Bi-National Planning: A TC Perspective Jacques Rochon, Director, Highway Policy Transport Canada, December 4, 2002.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
Detroit River International Crossing Project March 31, 2010.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Madera Ranchos Avenue 12 Enhancement Plan Community Visioning Workshops Workshop #3 – July 30, 2009.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Rice University – Baker Institute
NGTA Halton Planning and Public Works Committee
Technical and Public Advisory Committee Meeting #3
Draft Transportation Element September 6, 2017
Grey County Transportation Master Plan
September 2011 Public Open Houses
September 2011 Public Open Houses
Presentation transcript:

Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007

The Border Transportation Partnership

Why a Border Transportation Partnership?  Need for long-term improvements was recognized  Within the mandates of: U.S. Federal Highway Administration Transport Canada Michigan Department of Transportation Ontario Ministry of Transportation  Both countries must agree to make a new crossing happen!

As part of this long-term strategy, the Partnership is conducting a study to provide for the safe, efficient and secure movement of people and goods across the border. For more than two years, teams of experts in Canada and the U.S. have been working on the Detroit River International Crossing Study. We are making excellent progress! The DRIC Study

The DRIC study is addressing regional transportation and mobility needs: New border crossing capacity to meet long-term demand Improved system connectivity to enhance flow of people and goods Improved border operations and processing capabilities Reasonable, secure crossing options (redundancy) We are seeking solutions that will minimize community and environmental impacts. Purpose of the DRIC Study

Detroit-Windsor: A Vital Link  Approximately 28% of U.S.-Canada surface trade  Over 80% of all goods crossing the Detroit River are carried by truck  Significant to the economies of two nations  The partnering governments must protect transportation services

Busiest commercial land border in North America. Each year at Windsor-Detroit:  More than 3.5 million trucks and 12 million cars cross both ways;  More than $122 billion (25% total Canada-U.S. trade) flows through;  Approx. 35% of Canada-U.S. road trade crosses. Under high-growth scenarios, cross-border traffic demand could exceed the capacity of the present border crossings at Windsor-Detroit as early as Why a New Crossing at Windsor-Detroit?

Travel Demand vs. Capacity: Combined Detroit River Crossings

Ohio-Canada Trade Stats Ohio exported $16.8 billion to Canada in Ohio imported $13.7 billion from Canada in Canada is Ohio’s largest export market, with trade almost equivalent to the state’s export sales to all other countries combined. 276,500 Ohio jobs are supported by U.S. - Canada trade. Canadians made more than 511,300 visits to Ohio in 2005, spending $96 million (USD). In turn, Ohio residents made 698,400 visits to Canada, spending $235 million.

The Partnership has developed a coordinated process that is: thorough; open and transparent; fully accessible to the public. On both sides of the border, this coordinated process will: enable joint selection of a recommended river crossing that meets environmental requirements; ensure environmental concerns and community impacts are addressed. Environmental Assessment – A Coordinated Approach

TIME Steps in Evaluation Process Aug ‘05 Jan ‘06 Jan ‘07 Spring ‘08 AMOUNT OF ANALYSIS NUMBER OF ALTERNATIVES Assess Illustrative Alternatives & Identify Practical Alternatives Purpose of the Undertaking, Assess Planning Alternatives and Develop Illustrative Alternatives Refine and Assess Practical Alternatives Select Technically Preferred Alternative; Refine & Complete Preliminary Design Evaluation Process __________________ The underlying principle for the alternatives generation and evaluation process is to start with a broad perspective and become more focused/ detailed as the project progresses.

Broad Consultation Throughout The Project THE PARTNERSHIP CANADIAN BORDER AGENCIES COMMUNITY CONSULTATION GROUP CANADIAN PROJECT TEAM EXPERTISE CANADIAN MUNICIPAL COUNCILS MUNICIPAL ADVISORY GROUP FIRST NATIONS CANADIAN PUBLIC CDN REGULATORY AGENCIES LOCAL ADVISORY COUNCIL PRIVATE SECTOR ADVISORY GROUP FEDERALLY RECOGNIZED TRIBES LOCAL AGENCY GROUP U.S. CITY COUNCILS U.S. PROJECT TEAM EXPERTISE U.S. BORDER AGENCIES U.S. PUBLIC U.S. REGULATORY AGENCIES CROSSING OWNERS OPERATORS PROPONENTS

 Developed Initial Set of Crossing Alternatives, Plaza Locations & Connecting Routes in Canada and the U.S.  Defined Area of Continued Analysis  Presented Specific Crossing, Plaza and Access Road Options  Presented Preliminary Results of Social, Economic, Environmental and Engineering Assessments Identify Preferred Crossing Location, Plaza Locations & Connecting Routes in Canada and the U.S. ( SPRING 2008) Finalize Engineering and Mitigation Measures Document Study and Submit for Approvals Environmental Assessment Key Study Activities

Illustrative Alternatives

Practical Crossing, Plaza & Route Alternatives

Plaza and Crossing Locations

U.S. Study

X-10 Crossing Alternatives

X-11 Crossing Alternatives

Composite of the Two Footprints

Delray Land Use Options

Canadian Study

The Canadian DRIC team faces a distinct challenge – to extend the existing Highway 401 to the new border crossing. New six-lane highway, approximately 8 km in length Several alternatives considered; at-grade, below grade, tunneled, ‘Parkway’. Goal is to improve quality of life, take trucks off city streets, and improve movement of traffic across the border. All access road alternatives, as well as plaza and crossing alternatives, will be evaluated against seven factors. An End-to-End Solution

Evaluation Factors  Changes to Air Quality  Protection of Community and Neighborhood Characteristics  Consistency with Existing & Planned Land Use  Protection of Cultural Resources  Protection of Natural Environment  Improvements to Regional Mobility  Cost and Constructability

Access Road Alternatives 1A One-way service roads on either side of 6-lane freeway at grade. 1B One-way service roads either side of 6-lane freeway below-grade. 2A Six-lane freeway at grade, along side Huron Church/Highway 3. 2B Six-lane freeway below-grade, parallel to Huron Church/Highway 3. 3 Cut and cover tunnel below rebuilt Huron Church Road/Highway 3 Corridor.

Addresses the future transportation and mobility needs of the region Responds to local concerns - Covered sections of highway (short tunnels) at 10 locations to improve community connections across the corridor Landscaping to reduce visual impacts Recreational trails for pedestrians and bicycles along and across the corridor Opportunities for gateway entrance features to Canada, Ontario, Windsor/Essex County Parkway Option

Views of the Parkway – Huron Church Line area (looking east)

Views of the Parkway – Labelle area (looking east from EC Row)

Next Steps Continue to consult with the public Complete the technical and environmental studies Present a single technically and environmentally preferred alternative Spring 2008 Submit final study documents to approving agencies

DRIC Project Timeline EA/EIS Review & Approval EA/EIS Review & Approval NEW CROSSING 2013 Land Acquisition Technically and Environmentally Preferred Alternative Selected Spring 2008 Technically and Environmentally Preferred Alternative Selected Spring 2008 Detroit River International Crossing Route Planning and Environmental Assessment (EA) / Environmental Impact Statement (EIS) Detroit River International Crossing Route Planning and Environmental Assessment (EA) / Environmental Impact Statement (EIS) ENGINEERING / CONSTRUCTION

Contacts Mohammed Alghurabi Senior Project Manager Michigan Department of Transportation (517) Sean O’Dell Executive Director Windsor Gateway Project Transport Canada (613)