1 Presentation for Border Transportation Partnership Detroit River International Crossing May 31, 2005.

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

A Multimodal Goods Movement Strategy for Ontario Canada-United States Transportation Border Working Group Fall Plenary November 7 – 8, 2012 James Perttula.
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
New I-65 Interchange at Worthsville Road Welcome!.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Detroit Intermodal Freight Terminal Michigan Department of Transportation Gloria J. Jeff, Director Michigan Department of Transportation.
Freight-Supportive Guidelines ACT Canada – Sustainable Mobility Summit 2012 November 7, 2012 Ontario Ministry of Transportation.
Presented by: Detroit International Bridge Company Canadian Transit Company March 27, 2010 Ambassador Bridge U.S plaza of the bridgeCanadian plaza of the.
MTF Rail Development Forum
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
Canada Auto industry Part 2. Historical Maps
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Transport Investing in Regions SEATS Meeting 17 February 2012.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
IAIA 2007, Seoul, South Korea Detroit River International Crossing Project Navigating the Multi-Jurisdictional Maze for a Large-Scale Transportation Project.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
U.S. Department of Transportation Federal Highway Administration Transport Transports Canada Canada Transportation Border Working Group New York State.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
National Multimodal Freight Trends/Issues/Forecasts/ Policy Implications.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
Canada Border Services Agency Update Presentation to: Transportation Border Working Group Bellingham, Washington June 7, 2006.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
May 14, Our transportation system will provide a safe and accessible range of options that enhances existing urban areas communities while providing.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador.
Southwestern Ontario Border Wait Time Project Update Mike Barnet, P.Eng Intelligent Transportation Systems Program Ministry of Transportation of Ontario.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
The Border, Canada-US Trade and the Post-9/11 Security Regime with implications for Immigration and Diversity.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
USA Parkway Project Welcome Public Information Meeting to the
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Lakes Region Transportation Workshop November 15, 2013.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Transport Action Ontario Detroit River International Crossing (DRIC): Road Based Infrastructure In the Era of Climate Change.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Detroit River International Crossing Project March 31, 2010.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
0 Freight Activities: Year in Review Dec. 12 th 2015.
OFFICIAL PLAN 5-YEAR REVIEW & TAKE ACTION FOR SUSTAINABLE HURON.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
NGTA Halton Planning and Public Works Committee
Draft Transportation Element September 6, 2017
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Partnering at our Borders
Presentation transcript:

1 Presentation for Border Transportation Partnership Detroit River International Crossing May 31, 2005

2 Presentation Outline Background Planning/Need and Feasibility Study Existing and Proposed Crossings DRIC Study Elements DRIC Study Process DRIC Study Schedule

3 The Border Transportation Partnership

4 The Project Team Lead Partner Canadian Side Ontario Ministry of Transportation Lead Partner U.S. Side Michigan Department of Transportation Consultant Team Canadian Side Consultant Team U.S. Side

5 Why a Border Transportation Partnership? Individual studies by Michigan and Ontario in the 1990’s Need for long-term improvements was recognized Within the mandates of: –Transport Canada; –U.S. Federal Highways Administration; –Ontario Ministry of Transportation; and –Michigan Department of Transportation Each agency agreed to partner in a joint study

6 Planning/Need and Feasibility Study (“The Bi-National Study”) Develop a 30-year transportation strategy: –Consistent with environmental assessment requirements: Canadian Environmental Assessment Act Ontario Environmental Assessment Act U.S. National Environmental Policy Act –Multi-modal Completed January 2004

7 P/NF Study: Broad Geographic Area

8 P/NF Study Daily Travel Demand Base Case 5,700 19,300 12,700 14,100 Year 2000 Year 2030 Port Huron / Sarnia 12,800 69,300 51,600 27,900 Year 2000 Year 2030 Detroit / Windsor

9 P/NF Study Projected International Trade Two-Way Canada-U.S. Trade Passing Through Detroit-Windsor (U.S. Dollars) $90 Billion +/- $150 Billion+/- (64% Increase)

10 Opportunities Lost If No Improvements By Year 2030 P/NF Study Economic Opportunities SEMCOG-Essex Economy Michigan-Ontario Economy Cumulative Employment (Full Time Equivalent Jobs) 19,750 – 24,000 70,000 – 84,000 Annual Production (Year 2000 U.S. Dollars) $3.0 - $3.4 Billion $6.2 – $6.8 Billion

11 P/NF Study Network Connections Options for maintaining the movement of people and goods should be provided The current border crossings are 75 years old and will reach capacity in years This key trade route requires a new or expanded border crossing

12 P/NF Study Summary Elements of 30-Year Strategy Ensure sufficient border processing resources Optimize the use of existing network in the short to medium-term (5-10 years) Encourage use of other modes and diversion to Bluewater Bridge to reduce travel demand Construct a new or expanded crossing from the interstate freeway system in Michigan to the provincial highway system in Ontario

13 P/NF Conclusions Clear need for improvements at Windsor-Detroit Planning and approval process is unique Integrated bi-national public planning process Initiate Ontario EA Terms of Reference

14 Private Sector Proposals AMB ETR Mich-Can Proposal Detroit-Windsor Truck Ferry Twin AMB DRTP Proposal Hennepin Pt. Crossing, Inc.

15 The DRIC EA/EIS Study Will: Coordinate the U.S. and Canadian work programs Assess impacts for route, plaza, and crossing alternatives –Engineering –Social –Economic –Cultural –Natural environment Incorporate public and agency input

16 Preliminary Statement of Project Purpose The purpose of the Detroit River International Crossing Project is to, for the foreseeable future (i.e., at least 30 years): Provide safe, efficient and secure movement of people and goods across the Canadian-U.S. border in the Detroit river area to support the economies of Michigan, Ontario, Canada and the U.S. Support the mobility needs of national and civil defense.

17 Preliminary Statement of Project Need To address future mobility requirements across the Canada-U.S. border, there is a need to: Provide new border crossing capacity to meet increased long-term demand; Improve system connectivity to enhance the seamless flow of people and goods; Improve operations and processing capability; Provide reasonable and secure crossing options in the event of incidents, maintenance, congestion, or other disruptions.

18 Ontario EA Terms of Reference Purpose of the Undertaking The purpose of the undertaking is to provide for the safe, efficient, and secure movement of people and goods across the Canadian-U.S. border in the Detroit River area to support the economies of Ontario, Michigan, Canada, and the U.S.

19 Our Goal: Approved location for a river crossing Approved connections to freeways in Canada and U.S. Approved locations for plazas in Canada and the U.S. Comprehensive engineering to support approvals, property acquisition, design and construction Submission for approval by December 2007

20 Detroit River Crossings Forecasted Traffic Volumes

21 Sensitivity Analysis ScenarioYear Capacity Reached Base Forecast10 to 15 years Sensitivity Tests High Trade GrowthAdvance 3 years Low Trade GrowthDefer 3 years Diversion to Intermodal RailDefer 2 years High Diversion to St. Clair River CrossingDefer 6 years High Passenger Car DemandAdvance 4 years Low Passenger Car DemandDefer 5 years Extreme Low ScenarioDefer 11 years Extreme High ScenarioAdvance 7 years

22 Detroit River Crossing Capacity Crossing Facility Year Capacity Reached US Road Access US Border Processing Bridge / Tunnel CAN Border Processing CAN Road Access Ambassador Bridge> 30 years 5 to 10 years 10 to 15 years 5 to 10 years Detroit-Windsor Tunnel 0 to 5 years 5 to 10 years > 30 years 5 to 10 years

23 Bridge Types Cable Stay Bridges –Main spans up to 1,500 ft Greenville Mississippi River Bridge – 1,300 ft

24 Bridge Types Suspension Bridges –Main spans over 1,500 ft Tacoma Narrows Bridge – 2,800 ft

25 Tunnel Types Soft Ground Bored Tunnels Rock Bored Tunnels Cut/Cover – Submerged Mined (Drill and Blast) Construction –Bored tunnels in soft ground up to 80 ft/day –Bored tunnels in hard rock up to 30 ft/day Cost –Comparable to very long span bridges –$160 to $240 US million/mile

26 Tunnel Feasibility CategorySouthernCentralEastern Soft Ground Bored Tunnel Not feasible Insufficient soil depth Possibly Feasible Soil depth varies from marginal to insufficient Feasible Marginal soil depth Rock TunnelNot Feasible Poor rock Deep tunnel/ long approaches Poor history Not Feasible Poor rock Even deeper tunnel/ long approaches Poor history Not Feasible Poor rock Very deep tunnel/ long approaches Submerged TunnelNot Feasible Rock excavation required Environmental Issues Technically Feasible – Engineering Not Feasible & Prudent – Environmental Issues Technically Feasible – Engineering Not Feasible & Prudent – Environmental Issues

27 Crossing Feasibility Summary Location Type South CentralEast Grosse IleFighting Island Soft Ground Bored Tunnel No Yes Rock Bored TunnelNo Submerged TunnelNo BridgeYes

28 Plaza Functions

29 South Crossing Corridor Further Distances to Freeways Intensely Developed in US Detroit River is approximately 3 miles wide Piers Likely in Detroit River Detroit River International Wildlife Refuge Numerous Natural Environmental Impacts Poor Connections to West Airport Flight paths Rural in Canada Direct Route Southerly

30 Central Crossing Corridor Short Connections to I-75 and EC Row Expressway Major Infrastructure Improvements Required for Connection to Freeway in Canada Difficult Connection to I-75 Industrial Development Many Brine Wells Environmental Justice Concerns Detroit River is Narrowest Natural Environmental Impacts

31 Eastern Crossing Corridor Densely Developed in Both Nations Less Desirable from a Travel Demand Perspective Impacts to Belle Isle Detroit River is Over one mile wide Natural Environmental Impacts Mid Length Connections to Freeways

32 Evaluation Process Select Technically and Environmentally Preferred Alternative; Refine & Complete Preliminary Design Refine and Assess Practical Alternatives Assess Illustrative Alternatives & Identify Practical Alternatives Purpose of the Undertaking Assess Planning Alternatives and Develop Illustrative Alternatives Purpose of the Undertaking Assess Planning Alternatives and Develop Illustrative Alternatives Steps in Evaluation Process TIME Aug ‘05 Jan ‘06 Jan ‘07 Dec ‘07 NUMBER OF ALTERNATIVES AMOUNT OF ANALYSIS

33 Balance of Social, Environmental and Engineering Factors PROPOSED EVALUATION CRITERIA Socio- Economic Environment Property and Access Community Effects (Noise, Disruption, etc.) Land Use Strategies Disposal Sites & Contaminated Areas Cultural Environment Archaeology Heritage and Recreation Natural Environment Air Quality Agricultural Areas Fisheries and Aquatic Habitat Groundwater and Surface Water Noise Other Resources Special Wildlife and Habitat Areas Wetlands Woodlands Technical Considerations Traffic and Network Operations Engineering/Constructability Cost

34 Consultation THE PARTNERSHIP PRIVATE SECTOR ADVISORY GROUP COMMUNITY CONSULTATION GROUP CDN PROJECT TEAM EXPERTISE MUNICIPAL COUNCILS MUNICIPAL ADVISORY GROUP CDN GENERAL PUBLIC CDN BORDER AGENCIES CROSSING OWNERS, OPERATORS PROPONENTS CDN REGULATORY AGENCIES LOCAL ADVISORY COUNCIL U.S. PROJECT TEAM EXPERIENCE CITY/ TOWNSHIP COUNCILS PUBLIC AGENCY GROUP U.S. GENERAL PUBLIC U.S. BORDER AGENCIES FIRST NATIONS U.S. REGULATORY AGENCIES

35 Study Process Schedule

36 Key Milestones Study Area Features, Opportunities & ConstraintsApril ‘05 Initial Set of Crossing Alternatives & Connecting Routes in Canada and the U.S. June ‘05 Final Set of AlternativesDecember ‘05 Results of Social, Economic, Environmental and Engineering Assessments Winter ‘06 Preferred Crossing Location & Connecting Routes in Canada and the U.S. Spring ‘07 Finalize Engineering and Mitigation MeasuresSummer ‘07 Document Study and Submit for ApprovalsEnd of ‘07

37 Who Decides? DRIC Study Partnership Recommendation OEAA Minister of Environment CEAA Federal Agencies NEPA U.S. Agencies APPROVALS

38 DRIC Project Time Line EA Review & Approval Coordinated Canada – U.S. process Streamlined within existing legislation Public meetings have begun NEW CROSSING 2013 Land Acquisition Technically and Environmentally Preferred Alternative Selected Mid-2007 Technically and Environmentally Preferred Alternative Selected Mid-2007 Detroit River International Crossing Route Planning and Environmental Assessment Detroit River International Crossing Route Planning and Environmental Assessment ENGINEERING / CONSTRUCTION

39 Project Contacts – Canadian Study Mr. Dave Wake Windsor Projects Coordinator Ministry of Transportation Tel. (519) Mr. Roger Ward Senior Project Manager Ministry of Transportation Tel. (519) DRIC Project Office 2465 McDougall Street, Suite 100 Windsor, Ontario N8X 3N9 Tel. (519) ; Fax (519) Mr. Len Kozachuk, P.Eng. Deputy Project Manager URS Canada Inc. Tel. (905) Project Web Site: Toll Free :

40 Project Contacts – U.S. Study Mr. Mohammed Alghurabi Senior Project Manager Michigan Department of Transportation Tel. (517) Mr. Joe Corradino DRIC Project Manager The Corradino Group Tel. (313) Project Web Site: Toll Free : Detroit Project Office The Corradino Group, Inc. 535 Griswold Street Buhl Building, Suite 918 Detroit, Michigan, Tel. (800) Southfield Project Office The Corradino Group, Inc Civic Center Drive, Suite 410 Southfield, Michigan, Tel. (248) Fax (248)