June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
June 2006Juan A. Valls - FPA Project1 Producción y validación de los RODs Read-Out Driver (ROD)
June 15, 2009HIE-Isolde Review1 HIE-Isolde Low Level RF proposal P. Baudrenghien BE/RF/FB.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
The TIMING System … …as used in the PS accelerators.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Interfaces to ROD Crate Components - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane,
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
SPS Beam Loss System The SPS Beam-Loss System Hardware: Gianfranco Ferioli Software: Lars K. Jensen CERN SL/BI SL/OP Linkman: Antoine Ferrari.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Transmission Media I (06.523) Types and properties of physical transmission media I.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
The CERN LHC central timing A vertical slice
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Sept-2003Jean-Claude BAU1 SEQUENCING AT THE PS Let’s take a quick tour.
1 LTC Timing AB/CO/HT Central timing hardware layout Telegrams and events Postmortem, XPOC LHC Central Timing API Fill the LHC Use Case Julian Lewis.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
 LAN ADVANTAGE  Workstations can share peripherals devices like printers. Cheaper that providing a printer for each computer.  Workstations do not.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
1 Fibre Channel Roadmap Graphics Scott Kipp
1 Events for the SPS Legacy & Common Implications.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
1 Radiation worries in the cavern L.Jirdén
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
1 Synchronization and Sequencing for high level applications Julian Lewis AB/CO/HT.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
CC LLRF SM18 test plan and BA6 infrastructure
BE-CO YETS 2015/2016 Planned BE-CO tasks during the YETS 2015/2016
352MHz Klystron Control for the 3MeV Linac test stand
Strategy for long-term support of the TTC system
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
TileCal ROD Commissioning Counting Room Installation
Digitally subtracted pulse between
Preparation for Installation at ESS
Prepared for CSC by Fred Borcherding FNAL
Presentation transcript:

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS PURPOSE –Today the Timing (SPS, LHC ) is distributed from the BT864 –To manage the new injection system two new racks will be installed in the C.C.C

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS SCOPE –Distribution rack: A) - GMT B) - REV C) - P-P D) - LHC E) – PS (CPS, PSB, LEIR, ADE) F) – Reflective Memory

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS SCOPE –Control rack: 1)- To drive the FOXCOM modules in the distribution rack 2)- To control this distributions by means of the Mil-1553 field bus

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS SCOPE –Cabling: 1)- Optical fibre connections from the distribution rack to the C.C.C Optical Fibre Star Point 2) - VH4 cable from VME crate 3) – BNC or LEMO connections to and from this two racks

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup DISTRIBUTION RACK P-P FOXCOM MODULES SPS, BT864, BT865, BT866 REV FOXCOM MODULES SPS, BT864, BT865, BT866 GMT FOXCOM MODULES FROM CONTROL RACK P-P FROM CONTROL RACK REV FROM CONTROL RACK GMT MNR PS FOXCOM MODULES CPS, PSB, LEIR, ADE TO / FROM CCC OPTICAL FIBRE STAR POINT OPTICAL MODULES CRATE REFLECTIVE MEMORY LHC

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup CONTROL RACK G64 REV GPSCCR, BC=8, RT=4 G64 P-P GPSCCR, BC=8, RT=2 G64 PLS PLS OUT P-P IN TFBTFB TFBTFB REV IN TO DISTRIBUTION RACK GPSCCR VME CRATE TG8TG8 CPUCPU BC8BC8 DELAY’S TOTIV’s GMT TOTIVTOTIV TORIVTORIV G64 GMT GPSCCR, BC=8, RT=8 GMT FROM MTG’s SWITCH MIL C/GPSCCR PLS IN AMPLIFIER GMT TO DISTRIBUTION RACK P-P TO DISTRIBUTION RACK REV