Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop General Structure of a Survey Plan.
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Wednesday Agenda  Questions from yesterday or last evening  TC Responsibilities  Program Requirements  TC requested items  1102w setup  TC Responsibilities.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Update COPC Action Item Jim Vermeulen 13 November 2008.
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
The BIG Picture Study Visit Presentation1. General ICT Vision The integration of Information Communication and Technology for the true differentiation.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #44 Plenary DCL Trials.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #15 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Be a Team player… Science of Electronics 101 LACC.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
New Paradigms for Capital Planning in IT Security Sandy Washington Federal Railroad Administration July 22, 2008.
State of Georgia RCA Process Narrative Review Training Session Aug. 09’
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
International Civil Aviation Organization
Data Communications Implementation Team (DCIT)
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
Data Communications Implementation Team (DCIT)
SUNY Technology Conference June 20, 2019
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
Presentation transcript:

Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki

Federal Aviation Administration DCL Trials Update DTAP Development Work Ongoing: -Requirements firming towards June 7 CDR -FAA/Thales bi-weekly TIMs ongoing -Facility rep CHI Working Session #1 Complete -CHI modifications complete for CHI WS #2 (June 5-6) -DTAP delivery scheduled for Aug 17 delivery to FAATC MEM Coordination Activities: -5/8 visit to MEM to review DTAP display and equipment sizing/placement options with ATC and Tech Ops reps -Preferred equipment locations sent to ESA Tech Ops CM for permanent assignment by MEM Tech Ops Management -Reviewed Draft Training and Trials Planning materials/logistics

Federal Aviation Administration 3 DTAP 15” display to reside beside TDLS 15” display (base mount) Maintains clear visibility to airfield and gate areas from CD and SUP positions NATCA/ATC collaboration on display location/placement Desktop Keyboard/Mouse MEM DTAP Monitor Clearance Delivery Position BONUS ? – CAN YOU GUESS WHO THIS IS? DTAP TDLS Strip Printer

Federal Aviation Administration MEM - Space For DTAP Automation Rack and FTI Communications Connections – Preferred Option #1 4 T1212 Electronic Equipment Room FTI connections to basement Demarc Contractors Allowed 24 Hour Access with Badge/Proxy Empty 19” Equipment rack cabled to power in T1212 Would fit DTAP automation CPU if available Otherwise space for a new DTAP 19” rack space is required in T1212 Fiber, CAT5, Copper Cabling Options to Tower

Federal Aviation Administration MEM - Space For DTAP Automation Rack and FTI Communications – Alternate Option #2 5 Basement Communications Room Existing and New Rack Space Options ID’ed Contractors Allowed 24 Hour Access with Badge/Proxy FTI Demarc Location DTAP Communications to ZME HADDS and ARINC/SITA CSPs Fiber Only Option to Tower

Federal Aviation Administration DCL Trials Update FTI/ISS Architecture: -Initial Trials SCAP Documentation package complete -Meeting with ISSM office to review docs pending -FTI architecture design complete (part of ISSM Doc package) -NAIMES issued DTAP IP assignment complete -IPs sent to HADDS configuration team for inclusion in July build/field ZME deployment FAA-FDX MOU Draft Review complete: -FDX review of language complete -Agreement signatures pending -Same MOU template expected with UAL and DAL

Federal Aviation Administration DCL Trials Update Trials SRMD Approved: -Final signatures complete -MEM, EWR, ATL ATC panel representation -Attached to Test NCP Case Files Test NCP Update: -(5) Technical, Space, Power, HADDS, Rev # -Test plan documents approved and baselined with CMRT -HCS Rev # and HADDS interface NCPs approved via CCB -New FDIO Echo Port Test NCP in development (CMRT baseline on June 6)

Federal Aviation Administration DCL Trials Update Trials CSP Service: -Boeing/ARINC/FAA contract pending -POP begins 6/1 – thru 12/1 -Initial pDTAP AFN testing possible by mid-June via ARINC -Boeing/SITA Contract status pending (mid-July?) -KMEM, KACY log in addresses assigned -FAATC Data Comm lab FNTB-FEP/CSP connectivity pending

Federal Aviation Administration

Federal Aviation Administration