Lecture 11 Implementation Issues – Part 2. Monte Carlo Simulation An alternative approach to valuing embedded options is simulation Underlying model “simulates”

Slides:



Advertisements
Similar presentations
Value-at-Risk: A Risk Estimating Tool for Management
Advertisements

McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. A PowerPoint Presentation Package to Accompany Applied Statistics.
1 Overview of Simulation When do we prefer to develop simulation model over an analytic model? When not all the underlying assumptions set for analytic.
11 Simulation. 22 Overview of Simulation – When do we prefer to develop simulation model over an analytic model? When not all the underlying assumptions.
Credit Risk Plus.
Introduction CreditMetrics™ was launched by JP Morgan in 1997.
Desktop Business Analytics -- Decision Intelligence l Time Series Forecasting l Risk Analysis l Optimization.
TK 6413 / TK 5413 : ISLAMIC RISK MANAGEMENT TOPIC 6: VALUE AT RISK (VaR) 1.
Financial Risk Management Framework - Cash Flow at Risk
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
Introduction to Algorithmic Trading Strategies Lecture 8 Risk Management Haksun Li
Chapter 3 Measuring Yield.
Valuation and Rates of Return
 Known dividend to be paid before option expiration ◦ Dividend has already been announced or stock pays regular dividends ◦ Option should be priced on.
RISK VALUATION. Risk can be valued using : Derivatives Valuation –Using valuation method –Value the gain Risk Management Valuation –Using statistical.
Real Options1 Real Options Back To Reality Stefan Bary.
FIN 685: Risk Management Topic 5: Simulation Larry Schrenk, Instructor.
Chapter 11 Bond Yields and Prices. Learning Objectives Calculate the price of a bond. Explain the bond valuation process. Calculate major bond yield measures,
Simulation.
Value at Risk (VAR) VAR is the maximum loss over a target
Chapter 14 Simulation. Monte Carlo Process Statistical Analysis of Simulation Results Verification of the Simulation Model Computer Simulation with Excel.
03 July 2015Course Overview1 Energy Project Evaluation RES Course ESP606 Goal: To build up knowledge to so that participants will be able to assess if.
Robert M. Saltzman © DS 851: 4 Main Components 1.Applications The more you see, the better 2.Probability & Statistics Computer does most of the work.
Chapter 14 Risk and Uncertainty Managerial Economics: Economic Tools for Today’s Decision Makers, 4/e By Paul Keat and Philip Young.
Financial Risk Management of Insurance Enterprises 1. Embedded Options 2. Binomial Method.
Introduction to ModelingMonte Carlo Simulation Expensive Not always practical Time consuming Impossible for all situations Can be complex Cons Pros Experience.
Component Reliability Analysis
Fixed Income Analysis Week 2 Measuring yields and returns
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
Risk Management and Financial Institutions 2e, Chapter 13, Copyright © John C. Hull 2009 Chapter 13 Market Risk VaR: Model- Building Approach 1.
Ewa Lukasik - Jakub Lawik - Juan Mojica - Xiaodong Xu.
FFIEC Capital Markets Conference Portfolio Management and Theory Steve Mandel May 18-19, 2004.
Financial Risk Management of Insurance Enterprises
The Oxford Guide to Financial Modeling by Ho & Lee Chapter 8. Investment Grade Corporate Bonds: Option Adjusted Spreads The Oxford Guide to Financial Modeling.
Alternative Measures of Risk. The Optimal Risk Measure Desirable Properties for Risk Measure A risk measure maps the whole distribution of one dollar.
Simulation Prepared by Amani Salah AL-Saigaly Supervised by Dr. Sana’a Wafa Al-Sayegh University of Palestine.
LECTURE 22 VAR 1. Methods of calculating VAR (Cont.) Correlation method is conceptually simple and easy to apply; it only requires the mean returns and.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Valuation and Rates of Return 10.
1 Derivatives & Risk Management: Part II Models, valuation and risk management.
Chapter 8 Jones, Investments: Analysis and Management
Valuation and Portfolio Risk Management with Mortgage- Backed Security.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
CHAPTER ELEVEN Bond Yields and Prices CHAPTER ELEVEN Bond Yields and Prices Cleary / Jones Investments: Analysis and Management.
Delivering Integrated, Sustainable, Water Resources Solutions Monte Carlo Simulation Robert C. Patev North Atlantic Division – Regional Technical Specialist.
1 Interest Rate Risk Part 2, Convexity. 2 Convexity Empirical evidence shows that duration works well in estimating the percent change in value of relatively.
Outline of Chapter 9: Using Simulation to Solve Decision Problems Real world decisions are often too complex to be analyzed effectively using influence.
Calculating Project Schedule Risk Using Monte Carlo Simulation Curt Blair, PMP.
Simulation is the process of studying the behavior of a real system by using a model that replicates the system under different scenarios. A simulation.
Fang-Bo Yeh, Dept. of Mathematics, Tunghai Univ.2004.Jun.29 1 Financial Derivatives The Mathematics Fang-Bo Yeh Mathematics Department System and Control.
VALUATION OF CMOS. Introduction STATIC VALUATION DYNAMIC VALUATION MODELING Option-adjusted spread(OAS) Other products of the OAS models Illustration.
Value at Risk Chapter 20 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull 2008.
Financial Risk Management of Insurance Enterprises
Chapter 19 Monte Carlo Valuation. Copyright © 2006 Pearson Addison-Wesley. All rights reserved Monte Carlo Valuation Simulation of future stock.
Simulation in Healthcare Ozcan: Chapter 15 ISE 491 Fall 2009 Dr. Burtner.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
Chapter 12 – Single Investment Risk Analysis u Reasons for looking at risk from a single project prospective u lack comprehensive knowledge u of the rest.
VALUATION OF FIXED INTEREST SECURITIES FOCUS Bond valuation Yield measures Yield maturity relationship Effect of reinvestment on realised return Calculating.
THE ARBITRAGE-FREE VALUATION FRAMEWORK CHAPTER 8 © 2016 CFA Institute. All rights reserved.
Types of risk Market risk
Computer Simulation Henry C. Co Technology and Operations Management,
Actuarial Valuation Methods
Financial Risk Management of Insurance Enterprises
Prepared by Lloyd R. Jaisingh
Introduction to the Valuation of Debt Securities by Frank J. Fabozzi
Financial Risk Management of Insurance Enterprises
Duration and convexity for Fixed-Income Securities
Types of risk Market risk
Market Risk VaR: Model-Building Approach
Financial Risk Management of Insurance Enterprises
Presentation transcript:

Lecture 11 Implementation Issues – Part 2

Monte Carlo Simulation An alternative approach to valuing embedded options is simulation Underlying model “simulates” future scenarios –Use stochastic interest rate model Generate large number of interest rate paths Determine cash flows along each path –Cash flows can be path dependent –Payments may depend not only on current level of interest but also the history of interest rates

Monte Carlo Simulation (p.2) Discount the path dependent cash flows by the path’s interest rates Repeat present value calculation over all paths –Results of calculations form a “distribution” Theoretical value is based on mean of distribution –Average of all paths

Option-Adjusted Spread Market value can be different from theoretical value determined by averaging all interest rate paths The Option-Adjusted Spread (OAS) is the required spread, which is added to the discount rates, to equate simulated value and market value “Option-adjusted” reflects the fact that cash flows can be path dependent

Using Monte Carlo Simulation to Evaluate Mortgage-Backed Securities Generate multiple interest rate paths Translate the resulting interest rate into a mortgage rate (a refinancing rate) –Include credit spreads –Add option prices if appropriate (e.g., caps) Project prepayments –Based on difference between original mortgage rate and refinancing rate

Using Monte Carlo Simulation to Evaluate Mortgage-Backed Securities (p.2) Prepayments are also path dependent –Mortgages exposed to low refinancing rates for the first time experience higher prepayments Based on projected prepayments, determine underlying cash flow For each interest rate path, discount the resulting cash flows Theoretical value is the average for all interest rate paths

Simulating Callable Bonds As with mortgages, generate the interest rate paths and determine the relationship to the refunding rate Using simulation, the rule for when to call the bond can be very complex –Difference between current and refunding rates –Call premium (payment to bondholders if called) –Amortization of refunding costs

Simulating Callable Bonds (p.2) Generate cash flows incorporating call rule Discount resulting cash flows across all interest rate paths Average value of all paths is theoretical value If theoretical value does not equal market price, add OAS to discount rates to equate values

Effective Duration Determine interest rate sensitivity of cash flows that vary with interest rates by increasing and decreasing the beginning interest rate Generate all new interest rate paths and find cash flows along each path –Include option components Discount cash flows for all paths Changes in theoretical value numerically determine effective duration

Using Simulation to Determine the Effective Duration of Loss Reserves Step 1 1.Determine a model for loss payments as a function of interest rates 2.Select an interest rate model and the appropriate parameters 3.Simulate a number of interest rate paths 4.Calculate the cash flow of loss payments for each interest rate path 5.Discount each cash flow based on the corresponding interest rate path 6.The economic value of the loss reserves is assumed to be the average discounted value

Using Simulation to Determine the Effective Duration of Loss Reserves Step 2 1.Increase the starting short term interest rate by 100 basis points 2.Simulate a number of interest rate paths with the new short term interest rate 3.Calculate the cash flow of loss payments for each interest rate path 4.Discount the cash flow based on the interest rate path corresponding with each cash flow 5.The economic value of the loss reserves if interest rates were to change in this direction is assumed to be the average discounted value

Using Simulation to Determine the Effective Duration of Loss Reserves Step 3 1.Decrease the starting short term interest rate by 100 basis points 2.Repeat points 2-5 from Step 2 3.Use the economic values for the interest rate increases and decreases to determine the sensitivity of loss reserves to interest rate changes

Advantages of Simulation Type of cash flow distribution may not be clear –If one statistical distribution is used for the number of claims and another distribution determines the size of claims, statistical theory may not be helpful to determine distribution of total claims –Distribution of results provides more information than mean and variance –Can determine tails of the distribution (e.g. 95 th percentile)

Advantages of Simulation (p.2) Mathematical estimation may not be possible –Only numerical solutions exist for some problems Can be easier to explain to management Possible to revise values and re-run simulation to examine the effect of changes

Disadvantages of Simulation Computer expertise, cost, and time –Mathematical solutions may be straight forward –However, computing time is becoming cheaper Modeling only provides estimates of parameters and not the true values –Pinpoint accuracy may not be necessary, though Models are only approximately true –Simplifying assumptions are part of the model

Tools for Simulation Spreadsheet software (Excel, Lotus) –Include many statistical, financial functions –Macros increase programming capabilities Add-in packages for simulation –Crystal Ball Other computing languages –FORTRAN, Pascal, C/C++, APL Beware of “random” number generators

Applications of Simulation Usefulness is unbounded Any stochastic variable can be modeled based on assumed process Interaction of variables can be captured Complex systems do not need to be solved analytically –Good news for insurers

Conclusion Simulation can be a powerful tool for interest rate modeling Output can be extensive and impressive Effort involved in developing a model is generally challenging and time consuming Usefulness of results depends on how well the model reflects reality Understanding the model is essential to know when it is reliable and when it is not