Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology Mark Leeson Christopher Pountnay Marvin Lee Jonathan Portlock David Richards.

Slides:



Advertisements
Similar presentations
STRATEGIC FACILITIES MASTER PLAN for Village of Holmen, WI BRIEF OVERVIEW.
Advertisements

Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Vision For Sport To design a Dynamic and leading edge Sports Facility to enable University staff, students and members of the public to enjoy involvement.
Behaviour and Design of Steel Structures Lecture 3 Conceptual design.
Municipality of Zagreb (HR) Klaićeva Street Parking PPP Project.
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
Andrew renfree PULSE - home. andrew renfree PULSE - home.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Paving the way for Regeneration of Crewe Proposed Lifestyle Centre Christ Church Car Parks Crewe.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Building Project Update January Contents Recap Options Order of Cost Where do we go from here?
J ump START! christchurch. Chicago today Great Lisbon Earthquake 1755 Great Chicago Fire LISBON TODAY CHICAGO TODAY 1989 San Francisco Earthquake.
Southwark’s New District Heating Network.
Hinckley Town Centre Developments 24 March WHAT WE WILL COVER 1.Key Development Sites. 2.Regent Street. 3.Station Road improvements.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA Academic Senate 19 JANUARY 2011.
Joint Service Centre and the Extended School CASTLE GREEN London Borough of Barking & Dagenham.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
The Durham Project Presented by The Registrar and Treasurer 02 June 2008.
GEOG 442 Day 19: Commercial and Retail Analysis, and Community Facilities.
Building for Life Bonnie Kwok & Tracy Mann 10 October 2014 Information extracted from Green Cluster Workshop Document August 2013 and NW Cambridge Design.
Value of Flexibility an introduction using a spreadsheet analysis of a multi-story parking garage Tao Wang and Richard de Neufville.
A Brief Overview Midwest COOLING TOWERS, INC. A Full Checklist of Products & Services for Your Cooling Tower Project Quality Service Integrity Value Quality.
Controls & Data Services
Town of Pulaski and Pulaski County Preliminary Building Concept for Virginia’s Nanotechnology Park October 3, 2008.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
Scope of Project Developing 9,5000 sq ft in Building 80/81 at Ebrington by April 2014; The creation of incubation space, follow on space, meeting rooms.
North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010.
Forgebank – Environmental cohousing project Jan Maskell Director of Process Lancaster Cohousing.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
________________________________________________________________________________________________________________________________________________________.
Hunslet Nelson CC 1 st Xl 2012 – CYCL Premier Division Gipsy Lane Beeston Leeds LS11 5TT © Hunslet Nelson Cricket Club 2011.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
RIVERSIDE ELEMENTARY SCHOOL CalTrans Overpass MARCH 12, SALLY SWANSON ARCHITECTS, INC. West Contra Costa Unified School District.
Facilitating the Growth of New Technology-based Firms through Incubation: An Integrated Model. Professor David A. Kirby University of Surrey March 2007.
Sunderland University: Making a place (to) work Reinvention of the City Campus September 2010.
A VALUE BASED APPROACH TO SELECTION Professor John R Kelly.
Cougar’s Quest Travel Agency Meyer, Richard Tobias, Rudy Zhuchenko, Andrei.
Science Education Center Outreach Program May 18-19, 2005PAC Meeting1 LIGO The LIGO Science Education Center Michael E. Zucker (LIGO Livingston Observatory)
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
HKU SPACE Po Leung Kuk Community College Building Causeway Bay, Hong Kong 9 September 2008.
Trowbridge Museum at Courtfield House: A Bigger and Better Museum A £2.6 million opportunity for The Trowbridge Museum and Art Gallery.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Management Approaches. Construction Management Customer appoints Design team and Management team.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
PH-EDU Education lab in Bat Space Policy Board Meeting 17 November 2011.
February 2, 2012 City of Lee’s Summit Cultural Facilities Master Plan 1.
Whitstable Harbour Development Consultation ( ) JOHN DAVISON Port & Harbour Development Engineer.
Compressed Air Energy Storage (CAES) Wind Integration Study Team September 10, 2009.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
Shakopee Convention Center A study of sustainable design and technology.
SPACE 4 ARTISTS FEASIBILITY STUDY FOR IMPROVEMENTS AT MANOR GARDENS.
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
Physical Security at Data Center: A survey. Objective of the Survey  1. To identify the current physical security in data centre.  2.To analyse the.
Thank You for attending
Group 8 David Boley, Deneb Bosch, Nathen Miller, Thanh-an Sam
Eastern Pennsylvania Laboratory Facility
MA Buddhist Art: History and Conservation
Design a sports and leisure centre complete with swimming pool which requires very little electrical energy from the national grid to run. Decide on the.
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Fair Lawn BOE: Concept Planning
Demmer Library Mission Statement
Waste-To-Energy Plant Conceptual Design and Operation By NGWAN TECHNOLOGIES INTERNATIONAL.
On-Site Facilities for Pre-production deployment
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
Technology, costs and projections
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology Mark Leeson Christopher Pountnay Marvin Lee Jonathan Portlock David Richards

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 2 brief concept design development ground conditions energy strategy costs

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 3 brief centre for computing history storage & sorting area technology incubating unit Offices meeting spaces possible commercial use WC’s & reception gateway to the site maintain the view down to the pump room consider modular options energy strategy - renewable

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 4 Centre for computing history known to be considering a move currently visits by appointment only only 5% of the exhibits on show Proposals for £120m new build scheme Technology Incubator administration facilities flexible space potential for growth

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 5 concept - iconic

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 6 design proposal option 1: Site Location Centre for Computing History and museum administration/office space Pedestrian and vehicular entrance Technology Incubator

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 7 S teel frame construction L ightweight Cladding O n site construction S tandard techniques L ack of Flexibility L ose the site during construction design proposal option 1: Construction

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 8 shared car park storage loading energy centre pedestrian entrance vehicular entrance design proposal option 2: Site Location

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 9 design proposal option 2: site layout

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 10 concept old/ historic new/ contemporary

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 11 design proposal option 2: development

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 12 design proposal option 2: development

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 13 design proposal option 2: view from cheddars lane

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 14 ground conditions: brown field site Metals (lead, zinc >SGV) minimize disturbance MG/RTG ~ 25 kN/m 2 lightweight building 20kN/m 2 GC MG RTG raft foundation modify pathway Support large point loads

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 15 energy strategy ‘exhibit in action’ minimise running costs solution dependent on size

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 16 Option 1: Costs Spec: Tin Shed Cladding Price: £494, m2 (GIFA: 490)

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology 17 Option 2: Costs Spec: GRP Price: £1,347, m2 (GIFA: 490) Modular Pre-Fab Option 2 costs approx. x 2.5 more.

Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology conclusion adopt modular system start with current bin store area prove viability look to expand going forward 18