Nigeria’s Power Privatisation Process: Learning Curves

Slides:



Advertisements
Similar presentations
1 Why the World Bank Successful Privatisations are Useful for the Audit of Privatisation? The World Bank rich experience worldwide through providing technical.
Advertisements

+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Privatised Electricity Distribution Companies: A Bankable Prospect? A Presentation at the Bankers Committee/BPE Technical Workshop on Nigerian Power Sector.
Privatisation of public electricity company as a strategy for sustainable energy use in Nigeria by K. B. Oyende PhD Being a paper presented at the 14 th.
CPCS Transcom Limited Solutions for growing economies Industry and Transaction Review Conference The Reductions in Aggregate Technical and Non- Technical.
A 2030 framework for climate and energy policies Energy.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Enabling Private Sector Investment To Deliver Privatisation Bolanle Onagoruwa Director General Bureau of Public Enterprises Presidential Power Sector Workshop.
Simon Par Keeling, Société Générale Paris
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
BY S. U. YAMUSA II AND A. H. ANSARI
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
Business Acquisition Process Implementation & transition Closing Negotiation of the transaction Due Diligence Engagement TargetIdentification.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Selling a Small Business and Succession Planning F OR A S MALL B USINESS.
13th Annual Meeting of the INTOSAI Working Group on the Audit of Privatisation, London, 26 – 28 September SUPREME AUDIT OFFICE CZECH REPUBLIC Audit.
Financing Urban Public Infrastructure
Accounting and Tax for the Small Business NOVEMBER 8, 2012.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
Working with internationally oriented contractors Training event on PPP programming and process management 27 May 2008 Twinning Project CZ/2005/IB/FI/04.
Organizational Structure of RAO UES Executive Administration During Reform Period 22 March 2004.
21 Risk Management ©2006 Thomson/South-Western. 2 Introduction This chapter describes the various motives that companies have to manage firm-specific.
ProFina - Project and Private Finance Feb 2002 Whither Private Sector Participation? Private Investment in the Utility Industries – Energy, Transport,
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
New Jersey Board of Public Utilities (c) 2013 New Jersey Government Energy Aggregation P.L c. 24 “GEA Act” Gary E Finger Ombudsman New Jersey Board.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Nigerian Electricity Regulatory Commission IMPLEMENTING AN EFFECTIVE COST REFLECTIVE TARIFF Dr. Sam Amadi Chairman, Nigerian Electricity Regulatory Commission.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 18 More on Understanding Corporate.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Introduction to Accounting & Business CPA, MBA By Rachelle Agatha, CPA, MBA Slides by Rachelle Agatha, CPA, with excerpts from Warren, Reeve, Duchac.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Power Industry Reform: expansion of investment opportunities London,October 12-13, 2005 Russia: going global Russian Trade and Investment Conference Vasily.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
REFORMS IN DELHI. Reforms in Delhi --- Points of Concern Heavy urbanization, unbridled influx, ballooning population, haphazard growth, abundant availability.
Energy Agency of the Republic of Serbia
By Sarah Ahmed.  PTCL, by far, has been the highest profit earning state-owned company with real estate assets worth billions of rupees across the country.
UNCTAD/AU TRAINING WORKSHOP ON TRADE IN SERVICES FOR AFRICAN NEGOTIATORS: 24 – 28 August 2015, Hilton Hotel, Nairobi KENYA’S EXPERIENCE IN THE PREPARATION.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
Profit and Loss Account. Introduction The Profit and loss account is one of the thee most important financial statements The Profit and loss account is.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Indy Butany DeSouza Consumer Benefits from the Competitive Provision of Energy Services and the Ontario Smart Meter Implementation.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Request for Approval Document: HBO Latin America Divestiture Opportunity February 2010.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Use of Islamic Finance in PPP Energy Projects (Case: Ijara for IPP) Fida Rana PPP Investment Lead Hassan Idirissi Legal Counsel Islamic Development Bank.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
The Company Bureau of Public Enterprises Transmission Company of Nigeria The Role of The Management Contractor For TCN The Company Brian Wales and Geoff.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
CPCS Transcom Limited Solutions for growing economies The Privatization Transaction Process and the Opportunities for Investments in the Nigerian Power.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
World Bank Presidential Villa, Abuja-Nigeria Day 2, November 29, 2011 Nigeria Electric Power Transaction & Power Industry Reform Review Conference Nigeria.
ATC&C “ATC&C Loss The Aggregate Technical, Commercial, and Collections Loss. This loss is the difference between the amount of electricity received by.
“Energy Sector Governance and Cost Reflective Pricing in West Africa”
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
progress of the water reform in bulgaria
Concepts and Objectives of Cost Accounting
Chief Executive Officer RAO “UES of Russia”
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Nigeria’s Power Privatisation Process: Learning Curves Chijioke Okonkwo Senior Consultant June 2015

Learning Curves from Structure and Process Adopted for the PHCN Privatisation

OUTLINE Introduction Review Reform Activities Privatisation Plan Transaction Strategy Privatisation Transaction Process Achievements Challenges to Long Term Success Lessons

Introduction – Pre-Reform Highly insufficient supply, dependent on self-generation for consistent electricity Highly Illiquid sector Very high distribution losses Approx. half of end consumers unmetered and receiving estimated bills Lack of clear and enforceable contracts between entities Insufficient maintenance and investment carried out, assets deteriorated

Introduction – The Reform The reform and privatization of NEPA/PHCN was carried out to liberalize the NEI and integrate Private Sector Participation in the power sector The success of the reform and privatization exercise meant different things to different stakeholders: Government savings on budgetary allocation with the withdrawal from power business Investors saw an opportunity to invest and operate a very viable business Labour wanted job security and severance package Nigerians yearned for adequate and sustained electricity supply

Introduction - Unbundling PHCN (Power Holding Company of Nigeria) 6 Generation Companies 1 Transmission Company 11 Distribution companies Generation Production of Wholesale Power Transmission Wheeling of Power from Gencos to Discos Distribution Wheeling of power at low voltage levels (33KV and below) Responsible for retail functions of sale and collections

Review Reform Activities CPCS was engaged as Transaction advisor in 2010 Reviewed the Due Diligence Reports and preparatory activities for the transaction Financial and Accounting due diligence Technical due diligence Legal, HR and Organisational review Assets and Liabilities identification Business Plans of each SC Business Valuation of each SC NERC Signed Gas Supply Agreements (GSA) GACN/NNPC BPE

Diagnostic Assessment and Development of Privatisation Plans for SCs Evaluated operations of each SC – issues and challenges Assessment of FG preferred privatization options Advised current and prospective competitiveness of each SC Identified measures to attract private sector interest Assessed various transaction options for each SC Developed sales methodologies for each SC

Privatisation Plans - Gencos

Privatisation Plan - Discos

Privatisation Plans Successor Company Transaction Type Reasoning Distribution Companies Share Sale (60% shares) Retain minority shares for states and for employees To list on stock exchange Geregu Genco Share Sale (51%) Geregu is newer plant low rehabilitation costs and higher returns expected Afam, Ughelli & Sapele Gencos Share Sale (100%) Very old plants In poor state of repair Kainji, Shiroro Concession (30 year) Due to water rights and other sovereign concerns, companies concessioned as opposed to sale Long term concession to ensure private sector has necessary incentive to make long term investments

Transaction Strategy – Options for Gencos Non – Divestment Options Management Contract Independent contractor operates the plant Ownership of plant retained by the government Lease Independent party acquires use of plant Payment to the government on an annual basis Asset returned at the end of the term Concession Independent operator runs plant Upfront payments at the commencement of the concession followed by annual payments throughout concession term Asset returned to the government at end of term Divestment Option Plant is sold to independent party/consortium Payment to current ownership at closing of sale Existing owner may opt to retain a minority interest

Transaction Strategy Bids for generation companies was evaluated based upon a standard highest bid value format Bids for distribution companies was evaluated based upon highest reduction in aggregate technical, commercial and collection (ATC&C) losses ATC&C is a concept in the power sector used as a measure of the efficiency and effectiveness of a distribution company It accounts for the difference between power purchased by discos and revenue collected by discos

Transaction Strategy A reduction in the ATC&C losses is equivalent to an increase in effective supply of electricity to end users Bidding on reductions in ATC&C losses is a method designed to use competition to maximize the efficiency of the energy sector This method of evaluation was chosen to maximize the benefit to Nigerian consumers and the efficiency of the energy sector

Privatisation Transaction Process Request for EOIs issued in early 2011 331 EOIs received by March 4, 2011 Roadshows held in Lagos, Dubai, London, New York, and Johannesburg between January and February 2011 Tremendous interest from the private sector 79% of firms shortlisted purchased the bid documents Short Listed Firms Purchasing Bid Documents Percentage Hydro 40 35 88% Thermal 87 56 64% Distribution 80 72 90% Total 207 163 79%

Privatisation Transaction Process RFP issued on September 1, 2011 276 Bid documents were subsequently issued to 163 bidders on September 1st Bidders were given access to the Virtual Data Room when they returned completed forms included in the RFP requesting such access On September 12th, transaction documents were also distributed to bidders and added to the Virtual Data Room Over 60,000 document views in the virtual data room Pre-Due Diligence Conference held in October 14, 2011 Physical Data Rooms Opened in October 24, 2011

Privatisation Transaction Process Site visits held in late 2011 over a three-month period Transaction and Industry Review Conference held in November 2011 Final bids received Gencos – 25 bids by July 17, 2012 Discos – 54 bids by July 31, 2012 Technical Evaluation took place in August 2012 Financial opening and preferred bidder announcements in October 2012 Negotiations with Preferred Bidders commenced Transaction and Industry agreements signed in February 2013 Completion and Handover November 1, 2013

Purchase Price (Naira) Achievement -Discos Successor Company Bidder Purchase Price ($) Purchase Price (Naira) Abuja Kann 164,000,000 25,799,000,000 Benin Vigeo 129,000,000 20,215,000,000 Eko West Power and Gas 135,000,000 21,182,000,000 Enugu Interstate 126,000,000 19,803,000,000 Ibadan Integrated 169,000,000 26,505,000,000 Ikeja NEDC 131,000,000 20,638,000,000 Jos Aura 82,000,000 12,852,000,000 Kaduna* Northwest 163,000,000 25,612,000,000 Kano Sahelian 137,000,000 Port Harcourt 4Power 124,000,000 21,438,000,000 Yola 59,000,000 19,506,000,000 *Kaduna was completed in 2014

Purchase Price (Naira) Achievement - Gencos  Successor Company Bidders Purchase Price ($) Purchase Price (Naira) Geregu Amperion 131,000,000 20,567,000,000 Sapele CMEC/Eurafric 201,000,000 31,557,000,000 Ughelli Transcorp 300,000,000 47,100,000,000 Kainji Mainstream 237,870,000 37,345,590,000 Shiroro North South 111,654,534 17,529,761,885 Afam* Taleveras 260,000,000 40,820,000,000 Total $2,660,524,534 N434,081,351,885 *Afam was completed in 2014

Equity Participation *Kaduna and Afam were completed in 2014

Equity Participation (excluding Nigeria) *Kaduna and Afam were completed in 2014

Challenges to Long Term Success Revenue Gap in Sector Revenue collected inadequate to cover all costs till investments are made Gas availability Unpredictability about the availability of gas to cover all capacity expansion plus new NIPP plants Transmission Capacity Critical link between Gencos and Discos Large investments from FGN needed in order to avoid bottleneck Public Patience Results will not be overnight, public awareness needed on long term nature of increasing electricity supply

Lessons Private participation in the sector necessitates the financial viability and liquidity of the sector Cooperation at the highest levels is key With so many actors (BPE, NERC, GACN, NNPC, TCN, NDPHC, PTFP, PHCN, etc.), cooperation from the highest level helps all actors work together While preparation is critical, cannot wait until every piece is “perfect” While things need to be in place, if we were to wait until every item was exactly as we would have liked it to be, transaction could not have happened In some cases, private sector needs to be in the sector to advocate for what it needs to make investments, cannot do this from sidelines

Thank You!!!