Sulzer Dowding & Mills UNECE Regulatory Workshop - Forteleze IECEx Service Facility Scheme John Allen | 20/8/13.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Effectively applying ISO9001:2000 clauses 6 and 7.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
ISO 9001 : 2000.
Contractor Safety Management
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
ISO 9001 Interpretation : Exclusions
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Quality Assurance/Quality Control Policy
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9000 Certification ISO 9001 and ISO
Introduction to SQF Certification (Use “Notes “ View in PowerPoint to see additional guidance) Use this presentation to introduce SQF Certification.
(H.L.) HAZARD ANALYSIS CRITICAL CONTROL POINTS
CPA is a UKAS company The Assessment Process 2014 Seminars.
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
Effectively applying ISO9001:2000 clauses 5 and 8
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
ASEAN GMP TRAINING MODULE PERSONNEL
Introduction to ISO New and modified requirements.
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Support Programs version 2 March 2010 Cleaning and Sanitation
Setting up an Internal Audit Program By
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Webinar FSSC audit report 7th september 2015
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
CLAUDIA PANAIT TAIEX Expert – European Commission Legal Adviser Ministry of Health, ROMANIA.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
AIA and Exposure Data Collection By: Jaco van Rensburg
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
ISO/IEC
a Certificate of Conformity
ExTAG Training Workshop Calgary 2012 QAR related Issues
UNIT V QUALITY SYSTEMS.
IECEx Industry Seminar Integrating IECEx and ATEX for Europe
Michel BRENON IEC ExTAG Secretary
IECEx 02 Audits according to OD 005 Theo Pijpker
Testing and Certification according to ISO and ISO 17065
QPS EVALUATION SERVICES INC.
Setting up an Internal Audit Program
Current schemes within the IECEx System that may require assessment
Operationalizing Export Certification and Regionalization Programmes
How to conduct Effective Stage-1 Audit
HACCP HAZARD ANALYSIS CRITICAL CONTROL POINTS
On-Line Certificate System
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Radiopharmaceutical Production
Presentation transcript:

Sulzer Dowding & Mills UNECE Regulatory Workshop - Forteleze IECEx Service Facility Scheme John Allen | 20/8/13

| slide 2 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Why seek IECEX Service Facility Certification Over the last 25 year there have been many explosions in hazardous area installations, Piper Alpha, Buncefield, Texas City, Gulf of Mexico Etc Debruce & Port Bunge Grain Silos

| slide 3 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme How do you, as a user of Ex Equipment, know that your Service Facility is operating in accordance to the requirements of IEC and returning your Ex Equipment safe for use Publication of International Standards does not ensure standardisation on its own. International Standards provide “agreed technical requirements” The “ agreed technical requirements” need to be understood and applied in a standardised or uniform manner Do you have personnel with the knowledge, experience of Service Facility processes and practices to be able to access Service Facilities

| slide 4 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme What evidence can your Service Facility provide to prove that it is overhauling and repairing Ex Equipment correctly Health & safety legislation in most countries make the “User” responsible for safety of employees and the work equipment IEC specified in Clause “ It is the responsibility of the user to ascertain that the repair facility concerned can demonstrate compliance with the relevant stipulations of this standard” The Service Facility has the responsibility to demonstrate to the Ex Equipment user how they comply with the requirements of IEC

| slide 5 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme As Technical Director of a multi-site Service facility I asked myself 15 years ago, what evidence I could produce for a court of law, to verify that my Service Facility was overhauling & repairing Ex Equipment correctly? We had personnel who had been trained in Ex Equipment repair How could I prove that they were following correct procedures? We had personnel who had been repairing Ex Equipment for more than 30yrs. But was this 30yrs of bad practice or 30yrs of correct practice? The only way to evaluate this was to assess the work done but auditing 15 sites would take up too much time I needed an independent expert organisation to assess compliance initially this was EECS, part of UK HSE, currently it is IECEx

| slide 6 Sulzer Dowding & Mills What is IECEx? An International IEC System with Schemes covering Certification to Standards that relate to Equipment, Services and Personnel Competency in areas relating to Explosive Atmospheres, to provide an Internationally accepted means of demonstrating claimed compliance with International Standards IECEx is a “Conformity Assessment Tool” providing confidence that Products, Services and Personnel covered by an IECEx Certificate meet specified requirements, (International Standards) “IECEx is the International Standard way of doing Ex Certification”

| slide 7 Sulzer Dowding & Mills 7 Schemes within the IECEx System IECEx System IECEx Conformity Mark License Scheme IECEx Services Scheme Certification of Ex Service Providers, eg Repair and overhaul workshops IECEx Certified Persons Scheme (CoPC) Competency to work in Ex field (New) IECEx Equipment Scheme Certification of Ex Equipment IECEx Equipment Scheme Certification of Ex Equipment IECEx “Certificate of Conformity” IECEx “Unit Verification” Cert. Choice between: IECEx “Component Certificate” ExCBs 44 ExTLs 43 ExCBs 14 ExCBs 13 ExCBs 7

| slide 8 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Ex equipment manufactured for use within hazardous areas is controlled by product certification schemes such as:-  IECEx  ATEX  UL  GOST  CSA Ex equipment certified by IECEx complies with International Standards e.g:-  IEC General Requirements  IEC Ex d  IEC Ex p  IEC Ex e  IEC Ex n This is to ensure that the Ex equipment does not produce a source of ignition when used within a hazardous area

| slide 9 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme To ensure that the essential safety features of Ex Equipment are maintained, which ensure no sources of ignition are present, Ex Equipment has to be installed and maintained to international standards:-  IEC  IEC After the equipment has been installed but before it is energised an “initial inspection” is conducted, this is a safety critical requirement In many countries on going maintenance of Ex Equipment is a legal duty of the hazardous area operating company, (i.e. the User) to ensure safe working equipment is provided Following are a couple of examples of why an Initial Inspection ie required

| slide 10 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Ex d GII New motor with Terminal Box Flamepath Defect

| slide 11 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Ex d GII New motor with Inappropriate cable gland

| slide 12 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Ex equipment is subject to the environmental and operating conditions of hazardous area installations, these can be very arduous resulting in corrosion and equipment failure. When Ex equipment is overhauled and/or repaired in order to return defective equipment into a safe operational condition this also is done to an International Standard:-  IEC Usually only equipment with high cost or long lead time is repaired, typically electric motors, transformers, pumps, fans, gearboxes etc. Lower cost equipment such as luminaires or junction boxes would normally be replaced not repaired whilst other equipment like some types of gas detection devices can not be repaired

| slide 13 Sulzer Dowding & Mills Ex Equipment Evidence of Corrosion Ex d GII Small LV Motor Beyond Economic Repair

| slide 14 Sulzer Dowding & Mills Ex Equipment Evidence of Corrosion Ex d GII Pump motor Is there Internal Corrosion?

| slide 15 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme The IECEx Certified Service Facility Scheme assesses individual Service Facilities for their competency in conducting overhauls and/or repairs of Ex Equipment to IEC An IECEx Certification Body who has been assessed by IECEx for their competency to assess Service Facilities will conduct the assessment of the applicant Service Facility The initial assessment will review the applicant scope and Quality Management System including Ex Equipment overhaul and repair procedures for compliance with IECEx Certified Service Facility requirements

| slide 16 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme IECEx Certified Service Facility Scheme assesses compliance with IEC and the following IECEx documents:- IECEx 01IECEx Basic Rules IECEx 03-5IECEx Certified Service Facility Scheme Rules - Repair OD 313-5Certified Service Facility Assessment Procedures - Repair OD 314-5Quality Management System Requirements - Repair OD 315-5IECEx Service Facility Scheme Additional Requirements - Repair OD 316-5IECEx Service Facility Scheme ExCB Assessment Procedures

| slide 17 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme IECEX Certified Service Facility Rules & Requirements IECEx 01 Basic Rules IECEx 03-5 Service Facility General Rules of Procedure OD Processing Applications OD Quality Requirements OD Technical Requirements

| slide 18 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme IECEx 01 IECEx Basic Rules These are the base rule that apply to all IECEx Schemes within the IECEx System This document describes how the IECEx System and IECEx Schemes are organised, managed & financed, detailing the operation of the Ex Management Committee and the Scheme Committees

| slide 19 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme IECEx 03-5 IECEx Certified Service Facility Scheme Repair, Overhaul and Reclamation of Ex Equipment - Rules of Procedure This document describes how the IECEx Certified Service Facility Scheme for Repair is operated and managed, detailing how Ex CB’s are accredited, within this IECEx Scheme, and how the Service Facilities are assess by these ExCB’s This document, in association with IECEx 01, are the Rules of this IECEx Scheme

| slide 20 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme OD 313-5Certified Service Facility Assessment Procedures – Repair This Operating Document details the assessment, certification and re- certification processes conducted by the IECEx CB during the assessment of a Service Facility. The flow charts show the process, whist the tables detail specific requirements for each element of the flow chart

| slide 21 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme OD 314-5Quality Management System Requirements - Repair IECEx 03-5 requires the services facility to have an effective Quality Management System to the requirements of ISO 9001 and the additional requirements in this O D, which includes specific requirements for process control, operator & responsible person competency, calibration, control of non-conforming product and product recall The Service Facility does not have to have 3 rd party assessment to ISO 9001

| slide 22 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme OD IECEx Certified Service Facility Scheme Additional Requirements – Repair This Operating Document details additional requirements over and above the requirements specified in IEC These relate to control of rewind processes to maintain temperature classification, machining limits and when required pressure test requirements for Ex d Where competency of operatives and responsible persons are assessed the requirements of IEC Annex B and the requirements of the IECEx CoPC Scheme Unit of Competence Ex 005 have to be included. As set forth in IECEx OD 504 (Specification for Units of Competency Assessment Outcomes) Except where such competent personnel hold current IECEx CoPC Certificates of Competency for Unit of Competency Ex 005

| slide 23 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme OD IECEx Certified Service Facility Scheme Assessment procedures for IECEx ExCBs This Operating Document details the assessment and re-assessment of Certification Bodies seeking acceptance within the IECEx Certified Service Facility Scheme. The table details the specific requirements for each element in the process flow chart This document is strictly not necessary for Service Facilities seeking Certification, but it does provide confidence to those Service Facilities that the ExCB assessing them has the required competencies which have been assessed by IECEx

| slide 24 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Service Facility Assessment Process Offsite & Site Assessment Compliance With IEC & OD315-5 IECEx Service Facility Certificate of Competency Facility Assessment Record FAR Offsite & Site Assessment Quality Management System OD On-going Surveillance OD 314-5

| slide 25 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme The IECEx Certified Service Facility needs to have:-  Documented quality management system  Documented repair process controls  Effective control of repair processes  Control systems for any sub-contractors  Effective control of measurement & test equipment with traceability to International Standards  Sufficient plant & equipment to process Ex Equipment in scope  Competent Operatives & Responsible Persons

| slide 26 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme IEC Clause “The repair facility shall appoint a person (“Responsible Person”) with the required competency (see annex B), within the management organisation, to accept responsibility and authority for ensuring that the overhauled / repaired equipment complies with the certification status agreed with the user. The person shall have a working knowledge of the appropriate explosion protection standards and an understanding of this standard.”

| slide 27 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme The Service Facility Manager has to delegate responsibility for Ex Equipment overhaul & repair to the Responsible Person The Responsible Person has to agree the Certification Status of the overhauled or repaired equipment before any work commences (i.e. repair to standard or repair to certification documents) The Responsible Person must have the competency and authority to control how each Ex Equipment is overhauled and repaired and only when he is satisfied that it complies can it can be sent back to the User The Responsible Person has to advise and agree with the user any changes in work scope and certification status as a result of inspections The Service Facility management systems need to be adapted to integrate the Responsible Person into the management systems, eg the Responsible Person needs to be part of the QMS Management Review

| slide 28 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Under H&S legislation all operatives need to be competent or under close supervision Ex Operatives have been defined as those persons who’s decisions, or measurements, would have an impact on the certification status of Ex Equipment. Ex Operatives work under the supervision of the Responsible Person Other operatives involved in the overhaul & repair of Ex Equipment need to be made aware of the special requirements for Ex Equipment

| slide 29 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Competency of Ex Operatives & Responsible Persons is one of the most critical aspect of Service Facility competency How do you assess a person, in particular an employee, as competent Do you assess competency in house or use 3 rd party assessment What is it that demonstrates somebody is competent What is the competency of the assessor What is the right level of competency

| slide 30 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme As a Service Facility holding an IECEx Certified Service Facility Scheme Certificate of Competency, we decided that all EX competent persons, (i.e. Operators & Responsible Persons) would be 3 rd party independently assessed for their competency in an IEC/ISO17024 Scheme and assessment of competency must be independent from training provision Through EASA Region 9 in the UK I set up such a competency assessment scheme in 2005 We are now changing to assessment of competency to IECEx ExPCC Unit of Competency Ex 005 where training is provided by EASA Region 9 and assessment of competency is by an IECEx CB

| slide 31 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme The need for this rigorous approach was proven when the first training course and assessment ran in November % of the candidates failed The training was adapted to re-enforce knowledge gaps identified during the first course and we scheduled in a period of 2 weeks between training and assessment for individuals to improve their knowledge and/or skills before presenting themselves for assessment Now those attending the course prepare better before attending & pay greater attention during training as a result pass rate is now >90%

| slide 32 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Although our Service Facilities had successfully been repairing Ex Equipment since Ex Equipment was manufactured, our documentation & records of reclamation procedures did not meet the requirements of the IECEx service Facility Scheme Our 1 st major change was the introduction of a drawing recording details of the repaired component, detailing exactly what had to be repaired and where in the component, together with inspections and measurements A record of the decisions taken in preparing the reclamation procedure and choice of reclamation techniques being used was introduced

| slide 33 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Traceability of measurement was an operational area which required reinforcement, not with regards to instrument calibration but with regards to recording the instrument number for each measurement Control of purchasing required some minor amendment but where this included sub-contracting of, or part of, a reclamation procedure then much greater assessment and monitoring of that sub-contractor is required & the sub-contractor may need to be audited by the IECEx CB

| slide 34 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme An IECEx Certified Service Facility will provide the Ex Equipment User a job report in accordance with the requirements of IEC sent with the overhauled or repaired equipment. The job report will make a clear statement with regards to the certification status of the overhauled or repaired equipment This job report is essential information for the “initial inspection”, as required by IEC before the repaired equipment is returned to service

| slide 35 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme The IECEx Service Facility Certificate of Conformity enables the Ex Equipment User to have confidence that robust systems are in place and monitored, within the Service Facility, to ensure that their Ex equipment will be overhauled and repaired in conformance with IEC , to the certification status as agreed with the Service Facility and that the equipment will be safe to return to service The validity and status of any IECEx Service Facility Certificate of Conformity can be checked on-line at

| slide 36 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Meeting the requirements of the IECEx Service Facility Scheme was not a major problem for our Service Facility since our systems are regularly audited by customers ranging from petrochemical, power generation, manufacturing, pharmaceutical, automotive, military, nuclear and many others all with their specific QMS requirements. Currently we have 6 Service Facilities with IECEx Certificates of Conformity and we are working our way through our other branches who overhaul & repair large numbers of Ex Equipment

| slide 37 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme However Service Facilities which do not have an effective Quality Management System will find it much more difficult to meet the requirements of the IECEx Service Facility Scheme It is not the size of the Service Facility, which enables a Services Facility to be Certified by IECEx, it is the effectiveness of the Service Facility in controlling the repair processes and the competency of the people doing the work that ensures compliance with IEC & the IECEx Scheme

| slide 38 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme Just a few examples of Ex Equipment Repair

| slide 39 Sulzer Dowding & Mills Ex d GII As Received IECEx Certified Service Facility Scheme

| slide 40 Sulzer Dowding & Mills Ex d GII As Returned IECEx Certified Service Facility Scheme

| slide 41 Sulzer Dowding & Mills Ex d GII As Received IECEx Certified Service Facility Scheme

| slide 42 Sulzer Dowding & Mills Ex d GII As Returned IECEx Certified Service Facility Scheme

| slide 43 Sulzer Dowding & Mills Ex p GII Pump motor IECEx Certified Service Facility Scheme

| slide 44 Sulzer Dowding & Mills Ex p GII Gas Compressor Motor IECEx Certified Service Facility Scheme

| slide 45 Sulzer Dowding & Mills Ex d GI DC Traction Motor IECEx Certified Service Facility Scheme

| slide 46 Sulzer Dowding & Mills Ex d GI 1,100v Shearer Motor IECEx Certified Service Facility Scheme

| slide 47 Sulzer Dowding & Mills Ex d GI Flame Path & Bolt Thread Corroded IECEx Certified Service Facility Scheme

| slide 48 Sulzer Dowding & Mills Ex d GI Flame Path Gouged IECEx Certified Service Facility Scheme

| slide 49 Sulzer Dowding & Mills Ex d GI Transformer IECEx Certified Service Facility Scheme

| slide 50 Sulzer Dowding & Mills Ex d GI Transformer Corroded Flame Paths IECEx Certified Service Facility Scheme

| slide 51 Sulzer Dowding & Mills Ex d GI Transformer Mechanical Restraints Damaged IECEx Certified Service Facility Scheme

| slide 52 Sulzer Dowding & Mills Ex d GI Transformer Damaged Terminals & Internal Contamination IECEx Certified Service Facility Scheme

| slide 53 Sulzer Dowding & Mills Ex d GI Transformer Loose HV Winding Blocks IECEx Certified Service Facility Scheme

| slide 54 Sulzer Dowding & Mills Ex d GI Transformer Internal HV Phase Connections Insulation Damaged IECEx Certified Service Facility Scheme

| slide 55 Sulzer Dowding & Mills Ex d GI Transformer Core Earth Connection Damaged IECEx Certified Service Facility Scheme

| slide 56 Sulzer Dowding & Mills Ex d GI Transformer Flame Paths Recovered IECEx Certified Service Facility Scheme

| slide 57 Sulzer Dowding & Mills IECEx Certified Service Facility Scheme When you use an IECEx Certified Service Facility you have:  On-line evidence that they are still assessed as competent  Clear evidence of type of equipment for which they have been assessed as competent  The assessment process has been approved by IECEx  The status of equipment after repair will have been agreed  The service facility Responsible Person will have signed a job report sent with the repaired equipment verifying status In effect you will have done everything practicable to ensure the repaired Ex Equipment is safe to use whether as a User or as a Service Facility

| slide 58 Sulzer Dowding & Mills Thank you for your attention Any Questions? IECEx Certified Service Facility Scheme