WGClimate Work Plan for 2014-2016 John Bates, Chair WGClimate 4th Working Group on Climate Meeting.

Slides:



Advertisements
Similar presentations
CEOS-led response to the GCOS-IP Mitchell D. Goldberg CEOS Climate SBA Coordinator NOAA/NESDIS 1.
Advertisements

Space-based Architecture for Climate Mary Kicza NOAA’s Assistant Administrator for Satellite and Information Services May 19, 2011.
CEOS-CGMS Working Group Climate, Darmstadt, Germany, 5-7 March 2014 Coordination Group for Meteorological Satellites - CGMS COORDINATION GROUP FOR METEOROLOGICAL.
Writing group on Architecture for Space- based Climate Monitoring Mark Dowell EC/JRC.
CEOS-CGMS Working Group on Climate Essential Climate Variable (ECV) Inventory John Bates – Chair CEOS-CGMS Working Group on Climate WGISS-37.
COP-21 WGClimate and SIT Team SIT-30 Agenda Item #4 CEOS Action / Work Plan Reference – N/A 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Draft considerations on calibration and the.
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Committee on Earth Observation Satellites John Bates Chair, Joint CEOS-CGMS Working Group on Climate 3 rd WCRP Data Advisory Committee.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
28 th CEOS Plenary Session John Bates NOAA CEOS Plenary, Agenda Item 13 Tromsø, Norway October 2014.
1 Report of the GCOS Space Rapporteur to AOPC-20.
Coordination Group for Meteorological Satellites - CGMS Climate Monitoring Architecture: Status and way forward Presented to CGMS-41 plenary session.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitch Goldberg.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
Assessing the Maturity of Climate Data Records
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
WMO WIGOS-ICG 18/03/20131 Architecture for Climate Monitoring from Space in the context of WIGOS and GFCS Jérôme Lafeuille & Stephan Bojinski WMO Space.
CGMS lessons learned towards vibrant weather and climate monitoring Dr Tillmann Mohr – Former Director General EUMETSAT Dr Don Hinsman – Former Director.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
The CEOS Carbon Task Force Report SIT th – 28 th March 2012, La Jolla Takashi Moriyama (JAXA) & Diane Wickland (NASA) Carbon Task Force Co-Chairs.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
CEOS-CGMS Working Group on Climate John Bates NOAA/NESDIS/NCEI SIT Workshop Agenda Item 7 CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item #29 29 th CEOS Plenary Kyoto International Conference Center Kyoto,
Climate ECV Inventory and Report from UNFCCC/COP Mark Dowell European Commission – Joint Research Centre CEOS SIT-28 Meeting Hampton, Virginia, USA 14.
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
WMO Architecture for Climate Monitoring from Space Update for ICG WIGOS Jérôme Lafeuille (OBS/SAT/C/SBOS) Stephan Bojinski (OBS/SAT/SO/SUP) WMO; OBS/SAT.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
CGMS-42 CEOS-CGMS WP-01 V1, 11 May 2014 Coordination Group for Meteorological Satellites - CGMS Status report by the CEOS-CGMS Joint Working Group on Climate.
EUMETSAT, version 1, Date 06/06/2016 Coordination Group for Meteorological Satellites - CGMS Status report and recommendations from SCOPE-CM Chair: Ed.
SIT-27 Meeting La Jolla, CA, USA March 26-28, CEOS Priorities for 2012 Timothy Stryker CEOS Executive Officer.
Committee on Earth Observation Satellites John Bates, NOAA Plenary Agenda Item 8 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
Working Group II Terms of Reference Presented to CGMS Plenary and Working Group II CGMS-44 CGMS-WP-30.
Agency ESA, version 1, Date 6 June 2016 Coordination Group for Meteorological Satellites - CGMS Joint CEOS/CGMS Working Group on Climate 4-year Work Plan.
Status Report – CEOS-CGMS Working Group on Climate Presented to CGMS-43 Plenary session, agenda item G.1.
Committee on Earth Observation Satellites
Status of the ECV Inventory Cycle #2 Gap Analysis & Action Plan
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Coordination Group for Meteorological Satellites - CGMS
Broader Coordination on Carbon Observations
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
Proposal for an Obs4ECV Dataset and OpenSearch Capability for ESG
LSI-VC Jenn Lacey, USGS, LSI-VC Co-Lead CEOS SIT-33
The Joint CEOS/CGMS Working Group on Climate
Committee on Earth Observation Satellites
Status of Carbon Action Items
CEOS/CGMS JWGC and status of actions to the IP
Return to First Principles
CEOS/CGMS Working Group Climate
Joint CEOS/CGMS WGClimate
Precipitation Virtual Constellation (P-VC)
Proposed 2019 CEOS chair initiative
WMO Space Programme Office Geneva, Switzerland, 29 March 2018
Review of Chair Priorities
SIT Chair Priorities and SIT-33 Objectives
SIT Chair Introduction
CEOS-CGMS WGClimate Jörg Schulz, EUMETSAT, WGClimate Chair
SBSTA-41 John Bates, NOAA CEOS-CGMS Joint Working Group on Climate
28th CEOS Plenary Session CEOS Preparations for SBSTA-41
CEOS Virtual Constellations Process Paper
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
SIT Chair Priorities and SIT-34 Objectives
CEOS Organizational Matters
VC Title Goes Here Name (s), Organization, CEOS Affiliation
CEOS Working Group on Climate (WGClimate)
Precipitation Virtual Constellation
Presentation transcript:

WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting

Outline Work plan outlines what activities WGClimate will undertake in the next few years to accomplish its goals The architecture strategy forms the basis for moving forward to achieve the goals of WGClimate The architecture allows for participation of agencies across a broad range of time scales and societal applications I invite WGClimate members to help work in areas that benefit both their agencies and the broader climate community 4th Working Group on Climate Meeting

Architecture 4 Pillars 4th Working Group on Climate Meeting

Architecture – Data Flow 4th Working Group on Climate Meeting

Architecture – Latency/Application View 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-1: ECV inventory (first version) Q – The ECV inventory provides the foundation for the fulfillment of the three main objectives assigned to the Joint Working Group. At the 1st meeting of the Joint Working Group in March 2014, the current status of the inventory will be reviewed in the three domains (land, ocean and atmosphere) and the actions needed to achieve "Version 1" status of the inventory will be identified. In Agenda Item 4, we will get familiar with the inventory and provide feedback to the developers so they can provide analysis tools 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-2: Gap analysis (first version) Q – Also, at the 1st meeting of the Joint Working Group, the reference process will be defined for the gap analysis (including guidelines for ECV assessments), together with the necessary tools to support the implementation of this process. The gap analysis activities will commence once: a) Version 1 of the ECV inventory is available, and b) the reference process for the gap analysis and supporting tools are available. In agenda Item 4 discussion sections, we will devise a approach for how we would conduct a gap analysis. An analysis will be performed for a select set of ECVs by the end of the year 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-3: Action plan (first version) Q – Once the gap analysis has been completed, a coordinated action plan will be developed to: Create the conditions for delivering further climate data records from existing observational data by targeting processing gaps/shortfalls/opportunities (e.g., cross- calibration, reprocessing) Optimize the planning of future satellite missions and constellations to expand existing and planned climate data records, in terms of both coverage and record length, and to address gaps with respect to GCOS requirements This is the logical continuation of CMRS-2. Each case study will identify appropriate follow on actions 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-4: Case studies linking CDRs to societal applications and informed policy decisions Q – In order to provide a connection between the availability of climate data records and the socio-economic benefits that could accrue, particularly from a policy-making perspective, case studies will be performed to characterize the link between the capability to make informed policy decisions and the availability of climate data record information. These case studies will make use of the climate monitoring architecture and are expected to involve drilling down within the Applications and Decision-making pillars of the architecture. One of the case studies will be in an application area of the Global Framework for Climate Services (GFCS)—see CMRS-5. In Agenda Item 3, we will discuss how ECVs/CDRs can be used to address societal applications and decision making. We would like to identify several case studies, including one from the GFCS priority areas 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-5: Contributions to the Global Framework for Climate Services (GFCS) Q – The Joint Working Group will examine the most effective means of contributing to the GFCS from the viewpoints of: a) ensuring adequate representation of the capabilities and plans of CEOS and CGMS agencies, as represented by the ECV inventory, gap analyses and action plan, and b) formalization of the relationship between the GFCS and the Joint Working Group, including possible GFCS representation in working group meetings. In Agenda Item 3, we will have an overview of GFCS and follow up by identifying what ECVs/CDRs might be used to apply to a GFCS priority area 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-6: Report to UNFCCC Subsidiary Body for Scientific and Technological Advice-Research and Systematic Observation (SBSTA-RSO) Q – This report will address CEOS and CGMS support to the GCOS implementation plan, as well as CEOS contributions to GFOI and Carbon Strategy. In addition, relevant CGMS-specific activities may also be included. Understand how to incorporate GCOS plans with this reporting function. Also include updates on other items of interest such as forest (GFOI) and carbon (CTF) 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-7: Incorporation of in situ data holdings within the ECV inventory Q – In order to extend the benefits of the infrastructure of the ECV inventory to climate-relevant in situ data holdings, in January 2013 it was agreed to assess the feasibility of incorporating such information within the scope of the ECV inventory. At the 1st meeting of the Joint Working Group progress on this objective will be assessed. Led by GOSIC and in coordination with WCRP Data Advisory Council and GCOS, in situ ECV providers will enter data into ECV questionnaire tool 4th Working Group on Climate Meeting

WGClimate Work Plan – Climate Monitoring, Research, and Services CMRS-8: Update of ECV inventory, gap analysis and action plan (version 2) Q to Q – Once the first full cycle has been completed (see CMRS-1 to CMRS-3), resulting in Version 1 of the ECV inventory, gap analysis and action plan, a new cycle will be triggered by the availability of an updated ECV inventory, leading to Version 2 of these deliverables. Our experience with this first cycle will lead to iterative improvements and an ability to provide continuous feedback to achieve the WGClimate goals 4th Working Group on Climate Meeting

CGMS Climate Actions Plen G.1.1 – CGMS Plenary proposes that the CGMS/CEOS joint climate WG establish an inventory of FCDRs including for each one: Information on – contributing missions and instruments – calibration and cross-calibration – contributing agencies – and reference to ECV/TCDRs which could be extracted. – To be done in addition to and in full consistency with the existing ECV-driven inventory of TCDRs. This will be discussed in further detail in Agenda items 3 and 4. Need to better understand intended users and use cases. 4th Working Group on Climate Meeting

CGMS Climate Actions Plenary G.1.1 – The CEOS/CGMS joint climate working group to report to each CGMS plenary session – Approval pending by NOAA to have Bates attend 4th Working Group on Climate Meeting

CGMS Climate Actions Plenary G.1.2 R – Space-based climate architecture: To extend the ECV product inventory to FCDRs Duplicate with Plenary G.1.1 – th Working Group on Climate Meeting

CGMS Climate Actions Plenary G.1.2 R – Space-based climate architecture: the design phase of new sensors should include an analysis of compatibility with heritage instruments. Recommend inclusion into next WGClimate architecture report 4th Working Group on Climate Meeting

CGMS Climate Actions WG IV – Action 39.51: All CGMS Members to propose using interoperability standards for providing and sharing of climate data records and report on their efforts at the next meeting of CGMS Deadline: CGMS-40 Recommend to close or modify for inclusion into future architecture work by WGClimate 4th Working Group on Climate Meeting

Action Requests from VCs & WGs Action request from SST VC – Consider adopting curation standards as proposed in “Curation of sensor information, for climate data records fromspace” – Scan instrument documentation? Identify with MIM and ECV inventory what is captured and what would need to be added Identify CGMS action to Agencies to scan 4th Working Group on Climate Meeting