Manufacturer’s Recommendations

Slides:



Advertisements
Similar presentations
Installation Presentation
Advertisements

ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
Remodel / Resurface. Manufacturers Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
Engineered Wood Products
Floors & Floor Construction What lies beneath the surface that we see? Concrete slab: is it on grade, or on a frame? Wood joist construction: what direction.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Horticulture CD Unit C3-5: Nursery, Landscaping, and Gardening.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Competency: Draw Wall Sections
Unit 36. Structural part of the building Two good types of sheathing Lumber Lumber or laminated roof decking is sometimes used in homes with exposed ceilings.
Miscellaneous Details. u May have special or unusual conditions –inside or outside structure u Approach same as before –analysis of how specific detail.
Grouting Ceramic Tile This step comes after the tile is installed and has had time to cure. It is very important to either follow the instructions listed.
ICRA Panel System Installation Instructions
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Engineering Design and Presentation
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
PowerPoint Presentation
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Remodel / Resurface. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
New Construction. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Lumber Section II. Lumber Structural Strength Depends on species and grade, and the direction in which the load is acting with respect to grain of the.
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Building Types.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
TABS II Installation Presentation. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
DECKS. Square Corner Framing square Square Corner triangle.
Chapter 8: House Construction
Installation Presentation
Constructing Homes and Other Buildings
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Intro to Concrete 18.0 & 19.0 Class notes.
Chapter 35 Section Layout.
Ken YoussefiUC Berkeley 1 Structural, Piping, and Welding Drawings.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Competency: Draw wall sections and details
Building a Deck. What must my Deck be built of??  All lumber used must be southern pine grade #2 or better  Lumber grades are bases off of the number.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
How to Build a Divider Wall By Charysse Roberson.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
TABS II Contractor Installation CD. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Drafting 2 (Arch) Quiz Review #5
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Commercial Floor Systems
Competency: Draw wall sections and details
PPT PROCEDURES TO INSTALL PAVERS
Competency: Draw wall sections and details.
Wood structures Topic 3 Floor Framing
Structural Drawing Chapter 19.
Competency: Draw wall sections and details
Wood Frame Construction
Commercial Floor Systems
Commercial Floor Systems
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified person inspect all footings and joists. (See www.NADRA.org for checklist.) CAUTION: Make sure the ledger board is bolted or all-thread bolted all the way through the box beam on house. The manufacturer recommends footings 6 ft. on center and floor joists 16 in. on center.

Instructions for Adding Silca GrateTM to a New Deck Construction

Preparation Establish finished floor elevation. Determine thickness of deck material choice and add 1½” for Silca GrateTM thickness.

Preparation Establish finished floor elevation. - Allow for existing constraints such as doorway thresholds.

Preparation Make plan of layout and pattern of deck materials (ie. Natural stone, paver stone, brick or tile).

Choose From 3 Border Types Natural stone, pavers, tile, etc. Wrap rim joist with aluminum or vinyl Brick End of Joist (Front) View Fascia board

Deck Construction Make plan of layout and pattern of deck materials (ie. natural stone, paver stone, brick or tile). Build your treated lumber structure to the predetermined elevation (height). Assemble deck using 6’ on center footing (or to local building codes) with joists spaced 16’ on center. 2x8 are acceptable 2x10 are better.

Silca GrateTM Orientation Before placing Silca GrateTM on deck joists be sure reinforcement straps face down. YES NO

Silca GrateTM Placement Place Silca GrateTM on deck joists. Staggering grate joints improves overall strength of installation.

Silca GrateTM Attachment Attach Silca GrateTM to joists using 6 deck screws.

Complete Silca GrateTM Installation Install Silca GrateTM over desired area.

Install Geotextile/Landscape Blanket Install geotextile/landscape blanket over Silca GratesTM if polymeric sand is to be used in construction.

Test Install for Fit Now is the best time to test install your choice of decking to check for pattern and material fit and trim.

Complete Installation of Decking Material

Fill All Joints of Decking Material with Polymeric Sand* *See next page for polymeric sand application tips.

Polymeric Sand Application Tips Check weather forecast to allow for 12 hours of curing time without precipitation. Pour Polymeric sand into all joints from bag. Use broom to ensure all joints are filled with sand. Excess sand on the surface of the decking material can be removed using a wet/dry vacuum or leaf blower LIGHTLY. Be sure all joints remain filled with sand. Lightly mist polymeric sand and entire deck material surface using a garden hose or mister. Be sure all joints are saturated. Repeat misting 3 times.

Enjoy Your New Deck!

Let Us Know… We enjoy receiving pictures and descriptions of your Silca GrateTM installations and your finished decks. We can also always use your feedback and ideas from your installation experience. You can contact us at: sales@SilcaSystem.com