Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
23-Aug-06 mgbersch Plasma Cleaner Instructions for Use.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
Optical image tube with Medipix readout
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
UIC – Physics Department Fast Timer Project Bob Dysert, Alan Bross - Fermilab November 18, 2005.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
High-Temp Life Test #1 Update Jason McPhate LAPP Tuesday Telecon 17 May 2011.
UCB Update Jason McPhate & Sharon Jelinsky LAPP Tuesday Telecon 29 March 2011.
Update on Channel Plate Testing B. Adams, K. Attenkofer, M. Chollet, Z. Insepov, J. McPhate, O. Siegmund, D. Walters, M. Wetstein, Z. Yusof for the LAPPD.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
New Test Facilities at Argonne LAPPD Collaboration meeting June Matt Wetstein, Bernhard Adams, Matthieu Chollet.
LAPPD Collaboration Meeting 12/10/2011 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley 20cm Sealed.
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Berkeley Update Oswald Siegmund & Jason McPhate LAPP Weekly Telecon 11 January 2011.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
33mm MCP Testing at UC Berkeley
Dielectric Strength of Superfluid Helium Under Pressure Small Pressure-Controlled Cryostat Overview Measurement Cycle Possible Breakdown Mechanisms Dielectric.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Installation of the T600 at Fermilab CSN2, September 22,
MCP Testing Using Square Conductive Pads as Readout Anode Sagar Setru 1/19/2014.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ELENA installation progress F. Butin / ELENA collaboration.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Installation of the T600 at Fermilab
Completion of the MICE-US construction project
Surface Concept Position Sensitive MCP Detectors Novel Solutions A
FIGURE Typical vacuum brake booster assembly
ComCam Cryostat Justine Haupt Mar. 6, 2017
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
UCB Progress with 8” MCPs and Testing
SNS PPU Cryomodule Instrumentation
Grid space coating-updates 05/01/2012
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange at machining. – Dual Test Chamber has hardware needed for above flange. – Dual Test Chamber vacuum systems on order: Scroll rough pump on order Turbo pump controller on order (we have a TMP 150) Turbo air cooling system to be designed and built Convectron guages arrived and ready for installation High Vacuum gauges on order Large Format Process Chamber – Design of vacuum chamber nearing completion. 17 Nov Sharon R Jelinsky

Flexible 33mm MCP Photon Counting Demountable Detector Body 17 Nov 2009S R Jelinsky – PSEC Tuesday Meeting2 Top Clamp Plate Compression Spacers Compression Spring Φ33mm MCPs RT/Duroid Spacer PEEK Body Base Plate Pressure Pad All the body parts are complete, ultra-sonically cleaned and ready for fit test and assembly. All Stack parts now in house. MCP’s need to be identified and cleaned prior to use. Design of 4.5” CF flange for demountable detector mounting is complete. A total of three 4.5” CF flanges are in process at machine shop.

Cross Section of Assembled Demountable 17 Nov 2009J. McPhate – PSEC Collaboration Meeting3 When complete, the 33mm MCP demountable detector assembly will mount within a machined 4.5” conflat flange with a cross-delay anode mounted flush on the flange base. There are electrical feedthroughs for HV and anode signals, 4 SHV’s to control gap voltages and 4 SMA anode signals. PEEK parts (yellow) sandwich the base plate for rear field stand-off and hold down. This style detector is very useful for rapid MCP restacking and optimizing.

Demountable Photon Counting Imaging Detector Easily Tested 17 Nov 2009J. McPhate – PSEC Collaboration Meeting4 4.5” Conflat Flange Demountable System is easily mounted to any 4.5” Conflat port on our test chambers. Our Dual Chamber system will be outfitted with two 8” to 4.5” CF reducer flanges.

Update on Dual Chamber Test Station 17 Nov Each chamber has independent roughing and hivac valves  uninterrupted testing of one detector while the other is swapped. Valves work and chambers hold vacuum. Already outfitted with UV transmissive windows. 8” to 4.5” CF reducer flanges and viton o-rings are ready for use. 4.5” CF flanges are ready for machining into three Demountable assembly flanges. Dry Scroll Pump for rough vacuum is due soon. Turbo Pump is in house, needs air cooling. Turbo Pump Controller is on order. High Vac gauges are on order, convectron gauges are here and ready to be installed. Our Dual Chamber system is in several stages of completeness.