Oct 22, 2007SSWG #18 UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair Schedule Status of other fix and improvement projects Budget.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
SALT RSS-NIR MID-TERM REVIEW MAY 20 & 21, 2009 ANALYTIC OPTICS KENNETH NORDSIECK UNIVERSITY OF WISCONSIN.
ARCTIC Post-PDR Optical Design Study
Physics for Scientists and Engineers, 6e
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
Wide-field, triple spectrograph with R=5000 for a fast 22 m telescope Roger Angel, Steward Observatory 1 st draft, December 4, 2002 Summary This wide-field,
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Multispectral Camera Simon Belkin, Audrey Finken, Grant George, & Matthew Walczak Comprehensive Design Review Team Parente.
Oct 17, 2001SALT PFIS PDR - Structure1 Structure Interface/ constraints Loads Structure design rationale Truss Weight and CG Finite Element Analysis/ Image.
1 Components of Optical Instruments, Cont… Lecture 7.
5 Components Common to All Optical Spectrometers Source Transparent Sample Holder Wavelength Selector Radiation Detector Signal Processor and Readout.
SALT Technology Development Lisa Crause India-South Africa Astronomy Workshop – SAAO 6 August 2012.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
DEIMOS Presentation to the SSC January 25, Outline Quick overview of Budget and Schedule (web version has no Budget figures) Progress Since Last.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
5.Science and Instrumentation 19th SALT Board meeting: 8 & 9 May Cape Town Actions from 18 th Board meeting Item RSS Commissioning.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Oct 17, 2001SALT PFIS Preliminary Design Review1 PFIS/ IMPALAS Issues Outside Reviewer's Comments Post-PDR tasks Valuation Issues.
May 22, 2007SSWG #17 UNC1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair - in progress! Status of other fix and improvement projects.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Mach-Zehnder Interferometer for 2-D GRIN Profile Measurement Instrument Overview Sample Preparation Measurement Uncertainty University of Rochester Gradient-Index.
Oct 30, 2003PFIS - Student Wkshop1 The Prime Focus Imaging Spectrograph – Old Challenges and New Ones K. Nordsieck, Principal Investigator Jeff Percival,
The Prime Focus Imaging Spectrograph Design and Capabilities
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
FourStar Status Eric Persson (OCIW) Presented By.
The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.
Apr 29, 2003SSWG1 Prime Focus Imaging Spectrograph Status Passed CDR- moving into fabrication phase Mechanism design complete: fabrication drawing packages.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Oct 17, 2001SALT PFIS PDR - Optics1 Optics Refractive Optics - Design rationale Performance Slitmasks Gratings Polarimetric Optics Risks and Concerns Kenneth.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
May 19, 2008SSWG #19 Göttingen1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair positive progress: –UV efficiency –Some (repair-caused)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
RSS Fabry Perot Ted Williams November 6, Stability Example from Nov. 1, 2011 MR etalon in 6600 Å region (6645 filter) FPRD requirement: ≤FWHM /
Apr 29, 2003SSWG - CDR Comments1 PFIS Critical Design Review Comments Detailed response available in document SALT- 3100BP0011 (PFIS web site) Responses.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Report to the SSC Jan 10, Report to the SSC-Jan 10/02Page 2 Key Dates Nov 13-14/01Preship Review Jan 4/02Final review before disassembly Jan 7Start.
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
Prime Focus Imaging Spectrograph Status
Astronomical Spectroscopic Techniques
Astronomy 920 Commissioning of the Prime Focus Imaging Spectrograph
Prime Focus Imaging Spectrograph Status
INTERFERENCE.
PFIS Camera & Collimator Conceptual Design
Budget Budget Contingency/ Cost Risks Descope Options
Overview Instrument Role Science Niches Consortium science
FourStar 4K x 4K JHK imager
Polarimetry: Waveplate Modulation; Calibration
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Presentation transcript:

Oct 22, 2007SSWG #18 UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair Schedule Status of other fix and improvement projects Budget

Oct 22, 2007SSWG #18 UKZN2 Optics Reprise: Throughput/ Ghosts Three problems –Yellow ghost due to coating problem on dewar window –Grey loss in camera triplet –UV loss in contaminated lens fluid of four multiplets Instrument removed (Nov 2006), optics shipped to Pilot Group in Calif (Dec) Disassembled into multiplets, throughput measured by monochromator (Feb - Apr 2007):

Oct 22, 2007SSWG #18 UKZN3 #1,2: fixed Field flattener (ghost). Bad coating polished off by Janos, new coating applied by Spectrum Thin Films (with new moisture repellant overcoat). Satisfactory. Camera triplet contact. Backed off pressure, contact and grey loss vanished, has not reappeared.

Oct 22, 2007SSWG #18 UKZN4 #3: Repair (still) "in work" Found absorption in lens fluid (Cargille LL5610) due to polyurethane expansion bladders, and (lesser extent) viton O-Rings Original plan (May - July): flush/ replace fluid with LL3421 (viton compatible), replace bladder with polyethylene –Can be done without disassembling multiplets, although index slightly low Plan A: Did not work –fluid gaps too small, some could not be flushed –ethanol flushing agent sometimes fogged test NaCl pieces

Oct 22, 2007SSWG #18 UKZN5 Plans B, C (and D) Plan B: Disassemble multiplets, clean, replace expansion polyurethane bladders and viton O-rings –Back to LL5610 fluid (better index match) except for Collimator Field Lens and Triplet: LL3421 a better choice for common NIR beam (Aug - Sept) Four of five multiplets repaired. During reassembly of the last, two surfaces of first CaF 2 element in collimator triplet ("OL5") damaged by technician error! Plan C: Recovery –use existing spare blank (thanks to CDR panel!) –Pilot to cover blank, figuring, coating costs –figuring underway by TORC –considering Lick Obs hardened solgel coating –3 - 6 month delay –Plan D (in case this one breaks!): regrind damaged element

Oct 22, 2007SSWG #18 UKZN6 Throughput – Collimator Field Lens repair: UV loss was very small - repaired as precaution Triplet repair: interrupted by accident: projection shown Doublet repair –UV loss gone except slight dip at 350 nm –~10% grey loss still seen

Oct 22, 2007SSWG #18 UKZN7 Throughput - Camera/ Spec Quartet Repair. Looks good. Triplet Repair –surface contact fix remedies grey loss –fluid repair improves UV, leaves ~15% loss at 320 nm Project visible ~5% below FPRD spec, 30% low at 320 nm

Oct 22, 2007SSWG #18 UKZN8 Remaining UV loss - multilayer coatings? Notice that all elements having Spectrum Thin Film multilayer coatings (including singlet field flattener after recoat) have "ripples", one in the UV. Suspect absorption effect, not caught with reflectivity witness Small effect not worth risk and cost of disassembly, polish off coat, recoat, etc Effect may also be in SALTICAM If true, should not be seen in repaired collimator triplet (solgel/ MgF 2 )

Oct 22, 2007SSWG #18 UKZN9 Comparison with on-sky Projected improvement –UV 10x (5x so far) –Visible %

Oct 22, 2007SSWG #18 UKZN10 Repair Schedule Schedule With departure of Eric Burgh, new UW optics reintegration support team: Alan Shier (Pilot Group), Marsha Wolf (NIR project) Reintegration schedule –No earlier than: 7 Feb - 31 Mar –With 3 month contingency: 1 May - 23 June

Oct 22, 2007SSWG #18 UKZN11 RSS Fixes/ Improvements Slitmask mechanism –severe reliability problems due to difficulty of aligning magazine, carrier, and focal plane chute –redesigned, rebuilt; sensor electronics board iteration Grating stage flexure –out-of spec flexure perpendicular to dispersion –repaired current grating stage; purchased new, improved one Etalon flexure –ring centers do not flex the same: dual etalon difficulty –improve etalon "seat". Done Fix guider interference (limits field): Done Improve baffling –moving baffle damage, maintainability. Material received –payload/ instrument interface. Material received; design complete High level software. Design Complete; coding in progress Detector fast readout modification (last SSWG). Done

Oct 22, 2007SSWG #18 UKZN12 Cost to Completion Does not include ~$40K repair overrun due to additional work disassembling multiplets ("Plan B") Replacement of damaged element OL5 borne by Pilot Group Still predicting CTC ~20% over CDR budget