PRESERVING THE AMERICAN DREAM RECOVERING FROM SMART GROWTH SAN JOSE, CALIFORNIA THOMAS A. RUBIN MISINVESTMENT IN TRANSIT IN LOS ANGELES November 11, 2007.

Slides:



Advertisements
Similar presentations
This is my “focus” slide, used to make sure that I’m getting the sharpest possible picture on the projection screen. It is the 1954 Freeway Plan for the.
Advertisements

Cost-Effectiveness of Reductions in Greenhouse Gas Emissions from High- Speed Rail and Urban Transportation Projects in California Juan Matute and Mikhail.
Fourth Annual Preserving the American Dream Conference Atlanta September 16, 2006 Reforming Public Transit – Transit and Congestion Relief Thomas A. Rubin.
1 October 12, 2012 December 5, Light Rail Efficiency Projects Board Adopted LRT Improvement Plan May 2010 Speed up system, open new markets, improve.
Adding Priced Capacity for Congestion Relief Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.
Public Expenditure Analysis May 4, 2007 Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment Your presenters: Annie Gorman Hazel-Ann Petersen.
Oceanside-Escondido Rail Line Final Project Presentation John R. VelascoMay 12 th, 2003.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Chapter 11 Mass Transit.
Externalities on highways Today: We apply externalities to a real-life example.
Business Logistics 420 Public Transportation Lectures 8: The Performance and Condition of Transit in the United States.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
1 Metrolinx delivers The Big Move Regional Transportation Plan: Transforming Transportation in the Greater Toronto and Hamilton Area November 5, 2012 Bruce.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Portland, Oregon Transportation Sustainability. July 1, 2007 emissions.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
A Spatial Analysis of Orange Line Rider Demographics November 1, 2012By Tamar Sarkisian.
Fairbank, Maslin, Maullin & Associates Opinion Research & Public Policy Analysis Santa Monica, CA – Oakland, CA – Madison, WI - Mexico City June.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Moving the Most People for the Least Cost Preserving the American Dream Conference Friday, September 24, 2010.
Transit Alliance 4 Founded in Coalition of 39 groups 4 Local governments 4 Business organizations 4 Community groups.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
1 Governance Council Meeting Fiscal Year 2004 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY GATEWAY CITIES SERVICE SECTOR December 18, 2003.
EFFECTS OF RISING GAS PRICES ON BUS RIDERSHIP FOR SMALL URBAN AND RURAL TRANSIT SYSTEMS Jeremy Mattson 18 th National Conference on Rural Public and Intercity.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
: Research Question: Would ridership needs in the area of the Mid-Coast Corridor Transit Project be better Served by the implementation of a Bus Rapid.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Envision Central Texas Presentation Cellular Mass Transit (CMT) by Richard Shultz Concerned Citizen March 24, 2008.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
STEERING COMMITTEE MEETING APRIL 22, 2014 CITY OF HIGH POINT, NORTH CAROLINA High Point Short Range Transit Improvement Plan.
1 What If… The Washington Region Grew Differently? February 2005 Public Meeting on Alternative Transportation and Land-Use Scenarios National Capital Region.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
2004 State of the Commute Survey: Assessing the Impacts of Regional Transportation Demand Management National Capital Region Transportation Planning Board.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Serving a “Rainbow” Ridership – Designing and Providing High-Quality Public Transit for a Demographically Diverse Population Lyndon Henry COMTO Conference.
Externalities on highways Today: We apply externalities to a real-life example.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
Getting & Using Transit Data John Semmens Laissez Faire Institute & Arizona Transportation Institute.
Urbanization Key Issue #4: Why do suburbs have distinctive problems?
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
December 4, 2008 Preserving the American Dream 1 1 Faster by Bus By Gabriel Roth.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 37) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment
Future Construction FasTracks Corridors Federal Funding Analysis
Lorain County Transit Needs Assessment
Annual Operating & Capital Budget
Annual Operating & Capital Budget
Seattle Transportation Benefit District
Presentation transcript:

PRESERVING THE AMERICAN DREAM RECOVERING FROM SMART GROWTH SAN JOSE, CALIFORNIA THOMAS A. RUBIN MISINVESTMENT IN TRANSIT IN LOS ANGELES November 11, 2007

OVERVIEW Failure of the MTA Grand Strategy Bus vs. Rail, Costs, Value, and Budget Bus Works in Los Angeles, Guideway Transit Doesn’t, so Strengthen What Works – and Abandon What Doesn’t

Bus vs. Rail, Costs, Value, and Budget Productivity, Cost-Efficiency, and Cost- Effectiveness of MTA Bus and Rail Transit –Peer Analysis –MTA Internal Comparisons MTA Bus and Rail Subsidies Allocations of MTA Budget to Bus and Rail

Greater Los Angeles Transportation Reality Check “Southern California, the land of low-density, single-family detached homes on large lots connected by endless freeways, where driving is king.”

Not.

SoCal TRANSPORTATION REALITY I Of the 69 U.S. Urbanized Areas with Populations of 500,000 or More, Greater Los Angles: –Has by far the highest population per square mile, over 50% more than Greater NYC –Is second to last in both freeway centerline miles and and total roadway miles per capita –Is 45 th in daily vehicle miles traveled per capita

SoCal TRANSPORTATION REALITY II –SoCal has third best “homes-jobs” balance –Average vehicle miles per freeway lane mile is by far the highest in the nation –LA has by far the “widest” freeways in the U.S. –MTA buses and trains are among the most crowded in the U.S. Why do we have congestion? Too many people, not enough road capacity – and transit is not a congestion relief tool.

Peer Analysis I Source: National Transit Database, Federal Transit Administration, Report year 2005 Transit Profiles, Top 50 Reporting Agencies All 12 Heavy Rail Systems (MTA Red Line) All 19 Light Rail Systems (MTA Blue, Gold, and Green Lines) 20 Largest Bus Systems (out of 44) (Agency acronyms at end of paper.)

Peer Analysis II Metrics (Not Considering Capital Costs): –Productivity (consumption per unit of service): Average Passenger Load –Cost-Efficiency (cost per unit of service): Cost and Subsidy/ Vehicle Revenue Hour –Cost-Effectiveness (taxpayer cost per service consumed: Subsidy/Passenger and Subsidy/Passenger-Mile –MTA-Preferred Metric: Farebox Recovery Ratio

Heavy Rail Productivity

Heavy Rail Cost-Efficiency

Heavy Rail Cost-Effectiveness

Heavy Rail Farebox Recovery Ratio

Heavy Rail – Conclusion The Red Line is very productive – due, in part, to the discontinuance of some Bus lines and shifts of others to feed it. Cost-efficiency, cost-effectiveness, and farebox recovery ratio are all well below peer norms. While average passenger load is high, the Red Line has yet to achieve half of the 298,000 daily riders projected – for 2000.

Light Rail Productivity

Light Rail Cost-Efficiency

Light Rail Cost-Effectiveness

Light Rail Farebox Recovery Ratio

Light Rail Conclusions Productivity is high Cost-efficiency is very low Cost-effectiveness is below major peers Farebox recovery ratio is low This is an expensive way to move people in Los Angeles

Bus Productivity

Bus Cost-Efficiency

Bus Cost-Effectiveness

Bus Farebox Recovery Ratio

Bus Conclusions Productivity is very high – second highest of the 20 in the peer group. Cost-Efficiency and Farebox Recovery Ratio are above average. MTA Bus is number one in the peer group on Cost-Effectiveness

Overall Peer Comparison Conclusions All MTA modes are very productive. MTA Bus is above average in cost- efficiency; MTA Rail is near or at the bottom. MTA Bus is above average in farebox recovery; MTA Rail does very poorly. MTA Bus is the most cost-effective of the nation’s larger bus operators, MTA Rail fares not very well.

Understanding the History of MTA Ridership is the Key to Transit Decisions The following graphs show the ridership of MTA and its predecessor, SCRTD, back to (Strike years ridership are adjusted.) The first graph shows the annual ridership by mode; the second shows the trend lines for the four key periods that followed major transit decisions regarding fare levels and the degree of priority given to rail. The facts behind each period are then presented.

Consent Decree Ridership Change During the Consent Decree period (FY96- FY07), note that over half of the total increase has been the increase in Bus. Considering that over half of the Rail riders are former Bus riders, this makes the Bus increase even more significant. Also, much of the Rail increase was due to the CD’s reduced fares and expansion of Bus service, which allowed Rail riders to access the Rail stations.

Understanding MTA Ridership History I Pre-Fifty Cent Fare: From FY80 to FY82, fares increased from $.55 to $.65 to $.85 – and ridership fell 11%. Fifty Cent Fare: When the fare was reduced to $.50 for FY83-FY85, ridership increased over 40%, with virtually no increase in transit service provided.

Understanding MTA Ridership History II Rail Priority: From FY85 to FY96, the monies that funded the Fifty Cent Fare – slightly under 20% of the Proposition A.5¢ sales tax collections – shifted to rail. The Blue and Green Lines and the first two Red Line segments started service. Fares went to $.85, then $1.10, and finally to $1.35, as the level of bus service provided was reduced – & ridership dropped 27%.

Understanding MTA Ridership History III Consent Decree: The Consent Decree that settled Labor/Community Strategy Center v MTA went into effect in mid-FY97. MTA completed the last two legs of the Red Line, the Gold and Orange Lines and started construction on the Gold Line Eastside and Expo. Ridership is projected to increase 37% through the end of FY07. However, MTA states that it cannot continue to fund both current transit operations and rail expansion.

Debunking a Misimpression I Rail proponents often claimed that the high capacity of Rail allows Rail operating costs per passenger and passenger-mile to be less than that of Bus. While there are cases where this can be correct, such as the NYC subway, the key to doing this test is performing the proper comparison. For example, on page IV-2 of the MTA Adopted Budget FY2007, we see the following: Bus Rail Cost per Unlinked Trip$2.29$2.84 Cost per Passenger-Mile$.61$.48

Debunking a Misimpression II These statistics makes it appear that Rail can be competitive with Bus in certain transit operating situations in Los Angeles; however, the problem is – these are system-wide average Bus numbers. Because of the high initial capital cost for new Rail lines, it is contra-indicated to build Rail in any alignment where there would not be high ridership; however, Bus capital costs are so low it can be, and is, effectively used in far more situations, as the following graph illustrates.

Debunking a Misimpression III The graph on the following page is from data from Subsidy/Passenger by Bus Line Family, MTA Quarterly Line Performance Trends Report, 12/31/97, showing the cumulative percentages. For example, 40% of the MTA Bus Lines at that time had subsidies/passenger of $.91 or less, 80% had subsidies/ passenger of $1.21 or less.

Debunking a Misimpression IV When system-wide Bus averages are used to compare to Rail lines, then the mean value ($1.07 on this graph) is what is used. However, half of the Bus riders had a subsidy/ passenger of $.96 or less – and 30% had subsidies of $.71 or less, and 10% had subsidies of $.52 or less, under half of the mean value. Rail line costs should be compared to the values at the lower end of the curve, for the most utilized Bus lines, not the mean. (The best Bus-vs.-Rail comparison is comparable service in the same or comparable corridors.)

Impacts of Capital Costs I In the preceding, we have shown that MTA Heavy and Light Rail compare poorly to MTA Bus in operating costs and subsidies. The next step is to add capital costs, which will resolve the issue of the utility of Rail in Los Angeles beyond any doubt. (All data following is expressed in constant MTA FY2007 dollars, using data from the MTA FY2007 Budget and other MTA sources.)

Impacts of Capital Costs II While it is, at best, extremely questionable if Urban Rail has any operating cost/subsidy advantage over Bus in Los Angeles, there is absolutely no doubt about capital subsidies – the capital subsidy per “Guideway Transit” passenger (Light and Heavy Rail plus Orange Line Bus Rapid Transit) in Los Angeles is dozens of times that for Bus passengers.

Comparisons of Total Costs/Subsidies I In the preceding graphs, I have added markers for the Wilshire/Whittier family of bus lines, current the highest ridership family of bus lines in the nation, with ~100,000/working weekday. “Pre-Rapid” refers to Lines 18 and 20, and their limited stop variations, before Rapid Bus (Line 720) was introduced “Wilshire Rapid” is Line 18, 20, and the remaining limited stop lines, and Line 720, after Rapid Bus service began.

Comparisons of Total Costs/Subsidies II While cost and subsidy/passenger is important, cost and subsidy per new passenger is even more important for many key Los Angeles transit decisions. This metric was originally developed by the Federal government in response to research showing that many, often two- thirds or more, of passengers on new Rail lines were former Bus passengers.

Comparisons of Total Costs/Subsidies III The comparison of Guideway Transit to Bus in Los Angeles could not be clearer: –The taxpayer subsidy per passenger added by the Consent Decree was 5.4% of that for Guideway Transit; for Wilshire Rapid Bus service, 3.7% –New Guideway Transit passengers pay 2.2% of the costs of their rides; CD Bus new passengers, 27.5%, Wilshire Rapid new Bus passengers, 51.3%

Why The Orange Line Was A Mistake I The justification for the Orange Line was time savings – originally, in the DEIS/DEIR, 28.8 minutes between North Hollywood and Warner Center for BRT on the Orange Line vs. 50 minutes for Rapid Bus. It has now been extensive documented, and MTA has admitted, that both times were wildly inaccurate, even fraudulent, in favor of the Orange Line. The graph following shows the history of travel time projects to actual reality.

Why Rail Isn’t For Los Angeles To have any hope to work, Rail Transit must have high passenger loads. With very few exceptions in the U.S., high passenger loads means travel to the Central Business District during peaks. Los Angeles has, by far, the smallest CBD per million residents of any U.S. UZA. Data is from “Urban Rail in America,” for 1980 – The year LA voted to build rail.

Why The Orange Line Was A Mistake II Instead of a 42% travel time advantage over Rapid Bus, by MTA’s own figures, the Orange Line is actually ~26% slower than Rapid Bus on Victory/Lankershim. MTA was repeatedly warned that operating BRT through at-grade intersections at 45 mph without LRT-style barriers was extremely unsafe, but refused to consider changes until it had no choice.

Why The Orange Line Was A Mistake III It is difficult to tell which MTA action to defend the “safety” of the Orange Line was more egregious: –Citing the Miami-South Busway as “proof” of the safety of the Orange Line design, after all MSB buses were required to stop at all intersections, even when they had the green, due to its terrible safety record. –Actually claiming before the Judge hearing the EIR challenge that traffic safety was not a proper subject for such a legal action.

Why The Orange Line Was A Mistake IV When MTA was required to compare the Orange Line to Rapid Bus line networks, even the very poor MTA Rapid Bus alternatives (one with six E-W Rapid Bus lines within 3.0 miles – four within 1.25 miles – and no N-S and none for the rest of the Valley) showed Rapid Bus producing more ridership in the Valley (despite MTA’s claims to the contrary).

Why The Orange Line Was A Mistake V The ~$350 million spent on Orange Line capital (not counting $159 million for the right-of-way it was built on, previously purchased for a subway never to be built), and its extremely high operating costs could have been much more productively spent on a true network – a rational one – of Rapid Bus lines in the Valley and other Bus improvements.

Lessons from the Orange Line Debacle Many types of Bus Rapid Transit can be of great use in many situations in LA, including: –Rapid Bus (when configured for ridership increase, not cost reduction) –Express Bus on freeway, particularly when combined with High Occupancy Vehicle (HOV) and High Occupancy-Toll (HOV) lanes Orange-style BRT should only be considered with proper consideration of grade crossing safety, and only then when there is a meaningful advantage over Rapid Bus, which can generally provide 80% or more of the speed advantage of this type of BRT at 2% of the guideway capital cost.

MTA FY07 Budget - Bus/Guideway Split I Looking at FY07 budget allocations for MTA operated and contracted transit service only – backing out Municipal Bus service subsidies, Metrolink subsidies, local return funds, highway expenditures, etc. – the following graph shows the allocation of money to Bus and Guideway Transit and the transit service utilized for each.

Overall Conclusions I Guideway transit – Heavy Rail, Light Rail, and Orange Line-style Bus Rapid Transit – simply does not work very well in Los Angeles. Bus, including Rapid Bus where properly implemented (for ridership expansion, not cost reduction) works superbly. There is not sufficient funding to operate bus services as it is now while pursing rapid guideway transit expansion.

Overall Conclusions II Stop doing what isn’t working – expansion of Guideway Transit; it costs too much and does too little. Continue what is working very well – Bus transit. Lobby to change Federal and State funding sources for Bus use. Don’t raise fares, reduce them Expand and improve bus service, including certain types of Bus Rapid Transit.