Kenneth J. Andrews EMP-5179-1-1 Manufacturing Systems: EMP-5179 Dr. Ken Andrews High Impact Facilitation Fall 2010.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
Context of Manufacturing
Lean Operations (JIT) Module
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Lean Operations (JIT) Module
CSUN - Prof. David Shternberg
Chapter 1 Introduction to Operations Management. Three Functions in a Business Marketing – to “sell” products Operations – to “make” products Finance.
Chapter 6: Activity Based Management and the New Manufacturing Environment Identify the true costs of resources consumed in performing the organization’s.
MSE507 Lean Manufacturing
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Engineering Management MSE507 Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Lean Manufacturing An Overview Dr. Richard A. Wysk August 12, 2002
JIT and Lean Operations
JIT and Lean Operations
LeanSigma ® Fundamentals Module 2 – Time-Based Strategy & LeanSigma Execution.
Operations Management
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, Lean Production Based On The Book “The.
18-1 Irwin/McGraw-Hill ©The McGraw-Hill Companies, Inc., 2000 Operations Management: Managing Quality, Efficiency, and Responsiveness to Customers Technology.
History and Impacts of Manufacturing Enterprises Production Enterprise.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
Lean Basics Dewey Warden.
LEAN system.
JIT and Lean Operations
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
ALL MCQS
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 Lean Manufacturing An Overview.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
UNIT 4. All facilities, functions, activities, associated with flow and transformation of goods and services from raw materials to customer, as well as.
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
ISAT 211 Mod 2-1  1997 M. Zarrugh ISAT 211 Module 2: Competitiveness and Operations Strategy  The learning objectives of this module are –To explain.
1 The Application of Industrial Production Techniques to Health Care Delivery Summary of notes Pittsburgh Regional Healthcare Initiative: Perfecting Patient.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Lean Production The elimination of waste in the production process.
The Value Driven Approach
Operational and Production Aspects of Contemporary Business Chapter Course: BUS 101 Lecturer: NNA.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 14 Operations Management: Managing Vital Operations.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
9-1 © 2006 The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Value Chain Management Development of a set of functional-level strategies.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
DEMAND FLOW TECHNOLOGY
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Kenneth J. Andrews EMP Final Exam  Closed book – no ‘cheat sheets’ or other reference material  Translation devices are OK  Duration will.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Main Function of SCM (Part I)
Teamwork Presentation on JUST IN TIME” METHOD World Wide Science, Online MBA Program 25 June 2011 Head of Group: Head of Group: Ahmad Shikeb Farazi Ahmad.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
Operations Management JIT & Lean Systems
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Lean Manufacturing Series
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
MODERN TRENDS IN PRODUCTION ENGINEERING
Chapter 16 Lean Accounting
PRODUCTION AND OPERATIONS MANAGEMENT
F3 - THE TECHNIQUES AND TOOLS OF QUALITY MANAGEMENT
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Dr. Ken Andrews High Impact Facilitation Fall 2010

Kenneth J. Andrews EMP

Kenneth J. Andrews EMP Logistics  Class times  Breaks  After-class activities  References  Assessment

Kenneth J. Andrews EMP Program Overview (Modules & Weeks) 7. Quality at Source 8. Customer Ints. 9. QFD & DFM 10. Teams & Change 11. Term Papers 1. Intro. To Manuf. Systems 2. Lean & JIT 3. Push vs. Pull Process Impr. 4. TQ Tools & Techs. 5. Value Stream Maps 6. Manuf. Metrics 12. Final Exam (Dec 13) No Class on Nov 8? No Class on October 11

Kenneth J. Andrews EMP Every Company has Three Types of Management Systems Technology Management Systems People Management Systems Business Management Systems

Kenneth J. Andrews EMP What is a “Manufacturing System”? Interactions of many processes, products and design decisions made in the engineering of a product. Machine requirements planning Process planning Production planning Concurrent engineering

Kenneth J. Andrews EMP Craft Manufacturing  Late 1800’s  Car built on blocks in the barn as workers walked around the car.  Built by craftsmen with pride  Components hand-crafted, hand-fitted  Excellent quality  Very expensive  Few produced

Kenneth J. Andrews EMP Mass Manufacturing  Assembly line - Henry Ford 1920s  Low skilled labor, simplistic jobs, no pride in work  Interchangeable parts  Lower quality  Affordably priced for the average family  Billions produced - identical

Kenneth J. Andrews EMP Lean Manufacturing  Cells or flexible assembly lines  Broader jobs, highly skilled workers, proud of product  Interchangeable parts, even more variety  Excellent quality mandatory  Costs being decreased through process improvements.  Global markets and competition.

Kenneth J. Andrews EMP Manufacturing Issues Falling sales – where to find new customers? Input costs increasing, sales income falling No time to introduce new methods No money to develop new products / processes How to increase output without increasing costs? Too small to compete OR Too big to react quickly to changing market Increasing complexity of legislation and regulation What can I / we / anybody do about it?

Kenneth J. Andrews EMP How Does Your Company Compete? Price Innovative Products Customised and Tailored Solutions Branded Products Removing hassle from the Customer Interpersonal Relationships ‘Informal’ homework thinking assignment: 1-2 examples for each.

Kenneth J. Andrews EMP Company Actions: What Can We Do? Fact-based management (Performance Measurement, KPIs) Do you know your competitive position? Do you know your industry best practice? Do you have a balanced scorecard? Do you have a means of monitoring critical inputs and processes?

Kenneth J. Andrews EMP Company Actions: What Can We Do? Mobilise your people Process focus Visual management Lean manufacturing Six Sigma Teamwork Delegation / Respect / Trust Change manifesto Simple Tools and Techniques – Not Rocket Science!

Kenneth J. Andrews EMP What’s Lean Thinking  Looking at manufacturing as three primary processes that create value for consumers: product development, order to delivery, service through the product’s life cycle.  Asking what value really is from the standpoint of the customer. (The purpose of the process.)  Asking how the process currently performs and how it could perform better.  Asking what people and business processes are needed to support the value creating processes.  Aligning purpose, process, and people in search of the perfect process.

Kenneth J. Andrews EMP Definition of “Lean”  Half the hours of human effort in the factory  Half the defects in the finished product  One-third the hours of engineering effort  Half the factory space for the same output  A tenth or less of in-process inventories Source: The Machine that Changed the World Womack, Jones, Roos 1990

Kenneth J. Andrews EMP Was Ford the First Lean Thinker? Ford saw a total system when others saw parts. By 1914 at Highland Park the full system of “flow production” was largely in place: A comprehensive gauging system to prevent more than one bad part from being made – poka yoke. A widespread practice of taking the process to the product to create fabrication activities resembling cells. Continuous flow in most assembly activities, made possible by interchangeable parts & standard work. A crude system of preventing over/under production.

Kenneth J. Andrews EMP Lean Manufacturing A manufacturing philosophy which shortens the time line between the customer order and the product shipment by eliminating waste. Customer Order Waste Product Shipment Time Customer Order Product Shipment Time (Shorter) Business as Usual Waste Lean Manufacturing

Kenneth J. Andrews EMP Price Increase Some Profit Bigger Profit Price to Sell Cost to Produce Cost + Profit = Price

Kenneth J. Andrews EMP Cost Reduction Some Profit Bigger Profit Price to Sell Cost to Produce Price - Cost = Profit

Kenneth J. Andrews EMP Traditional View of Manufacturing  A key objective was to fully utilize production capacity so that more products were produced with fewer workers and machines.  This thinking led to large queues of in-process inventory waiting at work centers.  Large queues meant workers and machines never had to wait for product to work on, so capacity utilization was high and production costs were low.  This resulted in products spending most of their time in manufacturing just waiting, an arrangement that is unacceptable in today’s time-based competition.

Kenneth J. Andrews EMP Toyota Production System Pull Manufacturing Just-In-Time World Class Manufacturing Lean Manufacturing JIT/TQC/EI/TPM Short Cycle Manufacturing One-Piece-Flow Cellular Manufacturing Demand Flow Manufacturing Stockless Production Focused Flow Manufacturing Agility Value Adding Manufacturing Group Technology Time Based Management Synchronous Flow Manufacturing Continuous Flow Manufacturing Many Names – Same Concepts

Kenneth J. Andrews EMP The Toyota Production System 5S Programme & Standardisation Increase Profits By Eliminating Waste JIT Just In Time Processing Jidoka Jidoka: No Defects Passed on Flexibility to Make Only What Customer Wants Waste Elimination “Production Smoothing” Foundation

Kenneth J. Andrews EMP Capacity Utilization % Capacity Utilization 60 Production Lead Times (days) Traditional Manufacturing JIT Manufacturing

Kenneth J. Andrews EMP Time-Based Competition  It is no longer good enough for firms to be high-quality and low-cost producers.  To succeed today, they must also be first in getting products and services to the customer fast.  To compete in this new environment, the order-to-delivery cycle must be drastically reduced.  JIT is the weapon of choice today in reducing the elapsed time of this cycle.

Kenneth J. Andrews EMP Expectations from Suppliers  Frequent deliveries.  Hours (not days) lead time.  Rapid response capability (not from stocks).  Delivery to assembly line at the right time in the right sequence without inspection.  Reliability (quality and timing).

Kenneth J. Andrews EMP Supplier Relationships  Long-term, steady relationships with a few suppliers.  Negotiation based on a long term commitment to productivity and quality improvement.  Interested in supplier capabilities. –Continuous improvement. –Product/process technology. –Design for manufacturability.

Kenneth J. Andrews EMP What’s in it for a Supplier?  A Stable Manufacturing Environment. –Steady production volume.  Leaner Processes. –Cost/Flexibility/Quality  Profits.

Kenneth J. Andrews EMP The Future ~ It’s Not What It Used To Be  The future - will not be an extension of the past  Competition - is NOT company vs. company… but rather infrastructure vs.. infrastructure  Value (seen by your customer) now defined by speed, convenience, personalization and prices  Knowledge as the source of competitive advantage  Velocity is the game – time is the currency of the future  Sharing – we’re more willing to share/learn from others  Game changing technology – it’s everywhere

Kenneth J. Andrews EMP Program Overview (Modules & Weeks) 7. Quality at Source 8. Customer Ints. 9. QFD & DFM 10. Teams & Change 11. Term Papers 1. Intro. To Manuf. Systems 2. Lean & JIT 3. Push vs. Pull Process Impr. 4. TQ Tools & Techs. 5. Value Stream Maps 6. Manuf. Metrics 12. Final Exam (Dec 13) No Class on Nov 8? No Class on October 11