GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component.

Slides:



Advertisements
Similar presentations
19-20 September 2013, IBGE, Rio de Janeiro, Brazil
Advertisements

Development Alternatives SOUTH ASIA E N V I R O N M E N T O U T L O O K.
Global Risk Identification Program WMO 15 th Congress Side event on strengthening national and regional partnerships on disaster risk reduction.
Evaluating administrative and institutional capacity building
CLIMATE CHANGE ADAPTATION PROGRAM FOR THE PACIFIC (CLIMAP) Presented by Edy Brotoisworo, Sr, Environment Specialist Pacific Department, Asian Development.
MRC Strategic Plan. Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain.
Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
IWRM ToolBox: Knowledge Sharing Tool D. Thalmeinerova, GWP.
Why Turkey is interested in NCA? Arzu ÖNSAL Ministry of Development 29 June 2014.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 4: Strengthened Institutions and Financing Activity Progress and Component Strategy.
DRAFT DECISIONS. Governance and Strenghtening of the Forum Disseminate broadly the decisions adopted by the Forum of Ministers, in the relevant instances.
ADB’s Role in Strengthening Environmental Governance and Rule of Law Irum Ahsan Legal Counsel, Asian Development Bank 30 August 2013 Thimphu, Bhutan.
Greater Mekong Subregion Core Environment Program and Biodiversity Conservation Corridors Initiative ADB TA 6289 Executing Agency: ADB Implementing Agency:
Page 1 Supported by Namibia‘s Experience with Ecosystem Services Valuation for Conservation Dr. Konrad Uebelhör MET/GIZ Biodiversity Management and Climate.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 2: Biodiversity Landscape Conservation and Livelihoods Development Activity Progress and Component.
SEEA: A progress report with an emphasis on EGSS Sokol Vako United Nations Statistics Division/DESA.
1 The 2 nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 3: Climate resilience and low carbon strategies developed Activity Progress and Component Strategy.
Comprehensive M&E Systems
Greening Regional Economic Cooperation in Support of Biodiversity Conservation Outcomes Future Directions for the GMS Mme Keobang A Keola, WREA, Lao PDR.
Communication on "Land as a Resource" Jacques DELSALLE Head of sector Land & Soil European Commission, DG Environment FoEE Conference "Putting resource.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
System of Environmental-Economic Accounting SEEA-Energy Implementation United Nations Statistics Division Oslo Group Meeting September 2013 Baku,
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
The GMS Core Environment Program: Integrating Environmental Sustainability into Development of the Greater Mekong Subregion The GMS Core Environment Program:
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
1 “Adaptation to the consequences of Climate Change: Progress achieved and capacity building needed” Budapest, November 19-20, 2007 Strategic Environmental.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM GMS CEP-BCI Phase II NSU arrangements and implementation procedures GMS Environment Operations Center.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
Integrating Environment and Development: The World Bank’s Experience with Country Environmental Analysis (CEA) Presented at the GEF Sub-Regional Workshop.
Development and Transfer of Technologies UNFCCC Expert Workshop On Technology Information Technology Transfer Network and Matchmaking Systems: a LA & C.
Roles of GEF National Focal Points & Experiences in GEF Coordination and Integration Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland,
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM GMS CEP-BCI Phase II Results Monitoring Framework GMS Environment Operations Center.
GEF Familiarization Seminar Asian Development Bank Cécile L.H.F. Gregory Head Office of Cofinancing Operations Washington DC January 2012.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
ENVIRONMENTAL IMPACT ASSESSMENT: Managing Hydropower, Mining and Infrastructure Development Impacts on Natural Capital Iain Watson Senior Environmental.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
State of Environment Reporting in the Republic of Serbia Elizabeta Radulovic EEA NRC SOE Serbia Serbian Environmental Protection Agency Meeting on Environmental.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Independent Evaluation Group World Bank November 11, 2010 Evaluation of Bank Support for Gender and Development.
1 IMPLEMENTATION STRATEGY for the 2008 SNA OECD National Accounts Working Party Paris, France 4 to 6 November 2009 Herman Smith UNSD.
(i) a review of existing training/compilation materials and recommendations on how these could be used globally for the implementation of the SEEA, (ii)
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Core Principles and Action Plan February 4, 2004.
Issues from the CDM Institutional Reviews CDM Dialogue, Barbados March 2006 Ian C King Project Manager, UNDP CRMI.
AU/UNIDO/Brazil High-Level Seminar on Biofuel.  Policies are required to reflect the country’s development vision for the sector  Required to establish.
LADA Assistance to the CACILM CMPF Support Project Sustainable Land Management Information System LADA Project Steering Committee Meeting and Technical.
Update on ESCAP Work on Trade Facilitation and implementation of the ROC-TF mechanism Regional Organizations Cooperation Mechanism for Trade Facilitation.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
1 Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program.
Leadership in Development: Driving Change in the GMS Phnom Penh Plan for Development Management.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
System of Environmental-Economic Accounting Sokol Vako United Nations Statistics Division Training for the worldwide implementation of the System of Environmental.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
Short overview of the legal framework of protected sites and status of existing ecological networks in Serbia.
IPCC Key challenges facing communities, and approaches to solutions that enhance resilience: through NAPs Climate and Health Summit 2014 Investing.
Exploring Capacity and Accountability Gaps Joan Kagwanja, Chief Land Policy Initiative World Bank Conference on Land and Poverty March 2016.
REGIONAL DIALOGUE ON THE ENVIRONMENT
Implementation of the UN DA 10 project “The African context”
Strategic Environmental Assessment (SEA)
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Statistics in the Enlargement context
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Presentation transcript:

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component Strategy

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Activity Progress May-Oct 2012 Contingent valuation of ecosystem services in Champassak province, Lao PDR – Study completed by Champassak University, report underway SEA application and decision support for area based plans – Training on applying SEA in river basin context (RR SEA) – Completion of Golden Quadrangle Tourism SEA and presentation of findings and recommendations at Tourism Working Group. Development of interactive knowledge portal – Completion of 28 core indicators and launch of the GMS Indicator Portal – Identification of new indicators inetgrating into GMS Program

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Improved environmental planning systems, methods and safeguards STRATEGIC PLANNING: Subregional and national strategic planning capacity strengthened 1. Economic assessment of natural capital, 2. Support for area-based plans, 3. Support for sector plans SAFEGUARDS: Environmental safeguards application improved and compliance monitoring mechanisms enhanced 1. Strengthening environmental safeguard systems / capacity, 2. Safeguards application, monitoring and evaluation (ADB projects) MONITORING: Environmental monitoring processes strengthened 1. Establishment of Environmental Information System, 2. Strengthen monitoring systems / capacity building (Regional / National), 3. Monitor trends in biodiversity corridors / landscapes (Site) Component 1

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Results-based management: Planning 2013 Understanding of natural capital and ecosystem services in the GMS improved Research partnerships established; methodology in place Environmental valuation methods integrated into into area based planning Planning support tools being applied to 3 or more area- based plans Initial SEA awareness raised in energy sector in Cambodia and Lao PDR At least 30 stakeholders trained in SEA application for energy/ power development 2014 Awareness of value and financial costs related to ecosystem services increased VES maps and values published and disseminated Capacity of planners to support greening of sector strategies and plans improved At least 3 GMS universities trained in SEA and related tools Environmental planning tools introduced & capacity built for energy sector At least 1 institution/ university in each county is capable of applying SEA in energy/ power development plans 2015 VES methods integrated in strategic planning VES statistics / maps used in area-based and/or sector plans Environmental considerations integrated into GMS area- based plans SEA guidelines in place / underway in 3 GMS countries Documented changes in area- based plans based on SEA support Environment/ Ecosystems services values (cost/benefits) incorporated in national power/energy development plans Documented changes in energy/power development plan in 2 additional countries 2016 Environmental and social considerations included in at least 10 GMS sector or corridor strategies and plans At least two new / updated legal instruments (law / regulations) at a sector / national level supporting SEA or related tools prepared in GMS countries

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Results-based management: Safeguards and monitoring 2012 Transition from static program website to interactive knowledge portal completed Indicator portal receives at least 100 hits per month within 6 months from launch and at least 2500 hits within the first 18 months 2013 Priorities for country- specific safeguards capacity building and monitoring identified Safeguards diagnostic report and action plan prepared Environmental Information System developed and integrated at country- level At least 80 DPSIR indicators available and updated with support from NSU Site level monitoring and evaluation framework adopted by BCC BCC site progress monitored and published annually 2014 Improved safeguards application in ADB project (incl. transport & BCC) RSAT tested in at least 2 river basins; documented improvement in EIA application for transport in 3 countries EIS supports relevant national & site-level monitoring At least 2 new knowledge management / sharing tools deployed At least 2 environmental reporting systems making use of EIS data 2015 Harmonization of GMS country safeguards with international best practice At least 6 safeguards training per year Documented improvement in safeguards application CEP-BCI online knowledge portal recognized as a key resource center At least 10 external publications (reports, journal papers, conference presentations) make use of EIS data Effectiveness of BCC investments monitored 10 key indicators on BCC sites and landscapes maintained annually 2016 At least 100 agency staff (at least 35% women) able to implement safeguard assessments At least five GMS strategic plans and environmental reports supported by the Environment Information System

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Planned Activities (rest of 2012) Strategic planning Scope out activity on economics of natural capital (Regional) Technical inputs into ADB‟s Red River basin water resources planning (VIE) Preparation of publication on subregional tourism SEA Safeguards Assessment of GMS country safeguards sufficiency and potential to harmonize with ADB safeguard approaches Myanmar EIA, monitoring and compliance capacity development Monitoring Upgrade EOC GMS Indicator Portal with new indicators Scoping of regional forest mapping and EOC knowledge portal upgrades Publication of national EPA reports and subregional EPA synthesis report