1 Example of How Bus Stop Inventory is Used and Issues are Addressed.

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
11 Tunde Balvanyos, Ph.D. Bus Rapid Transit Coordinator, Pace APTA BRT May 2009.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department.
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.
Cobb County Comprehensive Transportation Plan (CTP) Board of Commissioners Briefing January 22, 2008.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
King County Metro Long Range Public Transportation Plan Kirkland Transportation Commission_ April 10, 2015.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Rapid Transit System Steering Committee Meeting December 4, 2012.
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
COTA Major Initiatives Ohio Planning Conference July 16, 2014.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Effective Transportation Planning City of Seattle, WA.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning and Integration Study Work Group Report 7/30/13.
WMATA BRT Marketing and Branding Presentation Rapid Transit Steering Committee April 30, 2013 Washington Metropolitan Area Transit Authority.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
CEO, Greater Cleveland Regional Transit Authority
1 Development of a Regional BRT System Proposal Presented to the TPB Access for All Committee April 23, 2009 Michael Eichler and Monica Bansal Transportation.
Regional Priority Bus Transit Conference June 24, 2009.
1 Transit and Climate Change April 10, 2008 Deborah Lipman Washington Metropolitan Area Transit Authority.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Traffic safety & Operations Laboratory Traffic safety & Operations Laboratory DC MPD DC MPD March 2009 Traffic Simulation of Chartered Bus Operation Plan.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Real-time Bus Arrival Time Prediction: An Application to the Case of Chinese Cities Shandong University, China & University of Maryland at College Park,
DC Circulator Transit Development Plan TPB Access for All Advisory Committee October 28, 2010.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Siskiyou County Short Range Transit Plan Draft Final Report Presentation to the Steering Committee LSC Transportation Consultants.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
TRB/APTA 2004 Bus Rapid Transit Conference The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation.
Comprehensive Operations Analysis LYNX 2013 Comprehensive Operational Analysis John Lewis, CEO.
1 Presentation to TAC May 20, 2009 Priority Corridor Network (PCN) Evaluation Project Introduction.
Transport.tamu.edu Fall 2016 Proposed Route Changes.
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Service Guidelines and Standards Capital Metropolitan Transportation Authority Board of Directors Meeting September 2015 capmetro.org |1.
Access Pasco 10-Year Transit Development Plan ( ) October 2013.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Comprehensive Route Network Analysis
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Operations and Service Concept
D Line Station Plan Overview
D Line Project Overview
Draft Fiscal Year Bus Service Plan
Presentation transcript:

1 Example of How Bus Stop Inventory is Used and Issues are Addressed

2 Key Characteristics of 30s Line High ridership of more than 20,000 passengers per day. Frequent services with headway of 3 to 6 minutes in peak hours. Routes up to 14 miles long. 277 bus stops. Connects major local, regional and national activity centers 130+ traffic signals along routes. Traffic and detours at Anacostia River, Downtown and Georgetown. Regional line with existing service cost of $15 million annually.

3 Comprehensive, multi-departmental review of services and operations impacting customer experience. Conducted community-based survey and design charrette process. Recommended integrated set of strategies to respond to consumer needs, minimize costs and enhance line effectiveness and performance. Developed a coordinated and phased implementation strategy in close coordination with DDOT staff. Public Involvement and Study Process

4 Top Three Issues Bus bunching Schedule adherence Crowding on buses Other Key Issues Long travel times Stop conditions Safety and security Customer information Recommendations Keep some end-to-end local routes Add new limited-stop services Create neighborhood connectors Improve reliability and travel times Key Issues Identified by Study and Outreach

5 Service Recommendations – Combined Service Plan

6 Corridor Development Projects Sixteenth Street Line S1,2,4 Leesburg Pike Line 28A,B,F,G,T Veirs Mill Road Line Q2 Comprehensive operations analysis and specific recommendations for implementation of reorganized service plan. Service Evaluation Projects Washington Blvd - Oakton Line 2A,B,C,G,W Sibley Hospital – Stadium Armory Line D1,3,6 Prince Georges - Langley Park Line F8 MetroExtra 79 Evaluation Study Single service evaluation and strategic recommendations for improvements. Next Corridors for Study and Public Input

7 Service Guideline Reports Metrobus Bus Stop Guidelines Report Bus Stop Information Report Regional Metrobus Service Guidelines Report Other Study Projects Traffic Management Systems Study On-Street Bus Terminal Concepts Study BRAC Service Strategies Study DC Neighborhood Bus Circulation Study New Policy Studies