Introduction & News SCT Weekly during ID Week Dave Robinson Cambridge University.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Jet Trigger Planning R.Goncalo (LIP), D.Miller (Chicago) Jet Trigger Meeting, 22 Sep.2014.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
1 Trigger “box” and related TDAQ organization Nick Ellis and Xin Wu Chris Bee and Livio Mapelli.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
Database Administrator RAL Proposed Workshop Goals Dirk Duellmann, CERN.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Stefan Schlenker, CERN ATLAS Post-LS1 Operations Workshop, 24th June 2013, CERN DCS Tools during ATLAS Run 1 Questionnaire Results Stefan Schlenker, CERN.
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai, Kazuhiko Hara (Univ. of.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
The Worldwide LHC Computing Grid Introduction & Housekeeping Collaboration Workshop, Jan 2007.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
1 Cosmic commissioning Milestone runs Jamie Boyd (CERN) ATLAS UK Physics Meeting-- J Boyd Jan
ATLAS (Shift) Operations Documentation and Training 24 June 2013 S. Zimmermann, ATLAS Post-LS1 Operations Workshop 1 Stephanie Zimmermann.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
ID Week 13 th of October 2014 Per Johansson Sheffield University.
WP3 WP3 at Budapest 2/9/2002 Steve Fisher / RAL. WP3 Steve Fisher/RAL - 2/9/2002WP3 at Budapest2 Summary News –EDG Retreat –EDG Tutorials –Quality –Release.
Short summary of ATLAS week. Really a lot has happened since the last ATLAS Plenary in Paris! Giant steps in the detector hardware construction, assembly,
ADC Operations Shifts J. Yu Guido Negri, Alexey Sedov, Armen Vartapetian and Alden Stradling coordination, ADCoS coordination and DAST coordination.
June-18 th -2007ATLAS-MPI; Status of ATLAS Technical Paper, R. Richter1 The ATLAS Technical Paper and back-up papers  Content of the ATLAS technical paper.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Monitoring of L1Calo EM Efficiencies
P. Paolucci G. Pugliese M.Tytgat
Dave Robinson Cambridge University ID IB Meeting, 31st October 2013
Risultati del run di integrazione M4
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
DAQ for ATLAS SCT macro-assembly
Online Software Status
Level 1 (Calo) Databases
Joint Meeting Wrap-up I’ve cheated Partially justified?
Update on ATLAS insertable B-layer
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Presentation transcript:

Introduction & News SCT Weekly during ID Week Dave Robinson Cambridge University

Snapshot of current activities Ground fault monitoring check Limited cooling loop switch on TODAY, barrel 4 LTx production at Oxford LTx QA at Cambridge LTx microprocessor code & BOC code development (Cambridge) DCS project migrations to linux DAQ – Module recovery & global reconfiguration – SCT configuration – TTC2LAN and standalone physics mode running – FE simulator development SCT modified fluence predictions (with IBL) DQM developments

Pixel Cooling tests IBL connectivity & leak tests IBL, Pixel and SCT Cooling trials Final opportunity for interventions at flange IDEP closure The Next Several weeks + SCT

ATLAS Integration Milestone 3 (May 19 th -23 rd ): New systems to join: RPC, HLT Lar, PIX and IBL originally planned for M3 will now join M4, as will SCT Cosmic triggers: TRT FastOR, few RPC towers Consolidate results of M2: Muons, TRT, BCM (L1CALO back in M4) Full chain Trigger+ HLT + Offline Storage Shifts: TRT staying ON all week Monday Morning till Friday afternoon 24h Shift Further Milestone Runs 8 th September & 13 th October ATLAS Cosmic ray run 24 th November for ~2 weeks 4

SCT Actions in coming weeks Complete QA for sufficient LTx for one crate Finalise  Processor code for LTx Replace bad ROD crate, week starting – Crate 3 has power supply issues and bad backplane in slot 9 – Full installation of LTx in that crate Get SR1 up and running – DCS and evaporative cooling – Complete migrations to SLC6 Readiness for cooling and powering in July – DAQ & DCS – Cooling loop checks Exercise DAQ in P1 – Preparations for M4

Run-2 Shift Model (revised proposal) Run Control Trigger Data Quality CP, Lumi, ADC CALO + FWD DCS, DQ, Calib SLIMOS ID (DBM, BCM ) DCS, DQ, Calib MUONS DCS, DQ, Calib Shift Leader 3 detector desks (ID, CALO+FWD, MUONS) plus 3 central tasks (Run Control, Trigger, Central Data Quality) each of which is associated to a Taskforce with dedicated Run Coordinator(s). The Taskforce/System Run Coordinators are responsible of: – Shift coverage and booking, documentation and training – Operation model still aiming at maximizing common efforts in tools, procedures, training and booking – Improved trainings (tutorial sessions + offline videos) with support for all central aspects – Improved OTP booking program (checking min/max shifts (~21) and time gaps). Intention to explore possibilities for further optimisation when operations stabilise later in Run-2, including dropping trigger desk with roles redistributed to Run Control and DQ desks. 6

Run-2 Shift Model (revised proposal) Run Control Trigger Data Quality CP, Lumi, ADC CALO + FWD DCS, DQ, Calib SLIMOS ID (DBM, BCM ) DCS, DQ, Calib MUONS DCS, DQ, Calib Shift Leader 3 detector desks (ID, CALO+FWD, MUONS) plus 3 central tasks (Run Control, Trigger, Central Data Quality) each of which is associated to a Taskforce with dedicated Run Coordinator(s). The Taskforce/System Run Coordinators are responsible of: – Shift coverage and booking, documentation and training – Operation model still aiming at maximizing common efforts in tools, procedures, training and booking – Improved trainings (tutorial sessions + offline videos) with support for all central aspects – Improved OTP booking program (checking min/max shifts (~21) and time gaps). Intention to explore possibilities for further optimisation when operations stabilise later in Run-2, including dropping trigger desk with roles redistributed to Run Control and DQ desks. 7 Formally in place only for cosmic ray runs and startup in 2015 We are responsible for our shifts until then

Shifts in 2014 Cooling tests in July – IDGEN oncall – DCS watcher shift (shared with pix/IBL) Pixel will have calibration shifter M4 run (& other milestone/cosmic runs) – SCT RunCo – SCT DAQ/DCS/DQ oncall Routine cold operation from mid-August – ID shift (mainly DCS watch) – Run-Co – DAQ/DCS/DQ

People News SCT IB Chairperson – Richard Brenner took over from Joost Vossebeld from 1 st April – Many thanks to Joost for the excellent job over the past 2 years SCT offline software coordinator – Pat will stand down from this role in August, replaced by Nick Barlow Many thanks to Pat for many years of service in this role. Nick an excellent choice for replacement, with his technical skills and wide knowledge of both offline and online Run Coordination – I have asked Per to resume run coordination role until mid-2015 Per had only two months as RunCo during operations Currently there is little operations experience at CERN Hope to identify new candidates for RunCo, and appoint a deputy from start of 2015 – Call for nominations in last quarter of 2014

SCT Performance Paper Submitted to JINST 1 st May 2014 Many thanks to the editors and EdBoard (chaired by Pat and Attilio respectively!) A special thank you to Pat Ward and Taka Kondo.

Contents 78 pages

16/07/2013Dave Robinson SCT Weekly12 Qualification Tasks

ID SCR “Nearly Ready” SCT: new MacMini (x3) plus iMAC (x2)

Summary Two months away from routine continuous cold operation Significant ramp up in activities to be ready for cooling and ATLAS running TRAINING – Current manpower at CERN not sufficient to support operations. – To be discussed this evening in SCT IB

SCT Dinner this evening – If interested meet in R1 at 19h30 (and let me know beforehand) SCT/PIXEL BBQ tomorrow evening – Please fill in doodle!