1 Business Development (Service).  Select location for Reflector Installation with clear view of Satellite (Line Of Sight)  There should not be.

Slides:



Advertisements
Similar presentations
The drill press is the preferred tool for making holes in materials.
Advertisements

35 FOOT LADDER 3 PERSON.
Sectional Assembly and Installation
J.P. Langston Brake Retrofit
Mechanical Division Standard Hand Tools. Topics Design T-Square Drafting Triangle Fabrication Hacksaw Cordless Drill File Sandpaper & Steel Wool Assembly.
The EZ-SAT.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Drills & Drilling Drills & Drilling.
Power Tools Safety. Portable Circular Saws Stock must be well supported in such a way that the kerf will not close and bind the blade.. Thin materials.
Installation instructions for the one and only 3 point strut bar for the 5 th gen Accord Please follow the instructions to ensure proper fitment of the.
Workshop Safety Lee McNeil, mentor of the Skagit Valley (WA) SeaTech 4-H ROV teams, developed the following placards, which he attaches to the tools in.
Drill Press and Hand Drills Team 2165 Docu-Mentor-y September 15, 2008.
Optical Manufacturing Solutions 1 Probe Assembly.
Cutting and Threading Steel Pipe
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Machine Shop Hazards, Machine Tool Safety
Cutting Machines Foldable Information. DRILL PRESS Related Terms  Center punch  Cutting Oil.
MyLock 644D Service Seminar.
Digital Installation - 1 Modern Communication & Broadcast System (MCBS) - 60cms Prepared By Checked ByApproved ByCirculated By Mr. Ashok Dubey Mr. Sanjib.
Fabrication of Fishtank Platform EAS 199B living with the lab.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
PAPER ROCKET LAUCNHER Bob Galliher Hobart Middle School 705 e.4 th St. Hobart, In
Technology Education Shop and lab safety Band Saw Scroll Saw
Fabrication of Fishtank Platform ENGR 121 living with the lab.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Hand & Power Tool Safety
Tray Tools, Materials & Processes. The Pillar Drill can be used to drill wood, metal, and plastic. As a general rule the larger the hole you are trying.
Next Slide Introduction to the Drill Press Created by Mr. Heck.
Drilling Holes Unit 42.
Unit 53 Metalwork Technology and Practice
Portable Power Tools Cordless Drill Hammer Drill Orbital Sander
1 Business Development (Service). What is DTH How DTH works How DTH works Type of DTH Connections Type of DTH Connections Advantages of DTH Advantages.
Production Tools in Technology
Installation. Indoor Unit Installation Typical Installation.
Basic Tool Safety and Equipment
SAFETY RULES Follow all directions the first time they are given. Be courteous in language and actions. Be on time and prepared to participate. Respect.
Principles of Manufacturing Safety First! Part II Safety Materials for Scroll Saw and Band Saw Copyright © Texas Education Agency, All rights reserved.
Drills and Drill Press Safety in the Lab
F. 1 Design and Technology
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
POWER TOOLS Electric drills
35’ Ladder Beam Raise Two Person Level I 4/1/12. Introduction This presentation demonstrates the basic operation for a two person beam raise. The evolution.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Fabrication of Fishtank Reservoir ENGR 121 living with the lab.
POWER TOOL SAFETY.
On/off switch Depth stop Quill lock chuck Tilting table Lower table or base Variable speed pilot wheel motor Feed handle Table locking clamp column.
Drill Press Safety and Operation. Westward 10” Drill Press The drill press comes in a floor or bench-mounted model. It has a motor driven head that has.
Safety Mr. Colby – Technology Education. What is Manufacturing?  Manufacturing is using Materials and Processes to make a Product.
VIEW SERIES with Sliding Door
30’ Wireless Mast – Self Install
Annex 4 - Moving Frame and Whiffletree assembly
General & Machine Safety Notes
Next Slide Introduction to the Drill Press Created by Mr. Heck.
Drill Press Coach Ketcham Productions.
Safety Poster Coach Ketcham Productions.
Lab Safety.
Power Tool Safety Don’t operate a machine until:
Module 6 Antenna Assembly and Look up Angles
Horizontal Milling Operations
Drills & Drilling Drills & Drilling.
Presentation transcript:

1 Business Development (Service)

 Select location for Reflector Installation with clear view of Satellite (Line Of Sight)  There should not be any partial / future obstruction in LOS like- Tree branches, Sheds, Growing Tree, Under Construction Building etc. Step 1

Satellite Subscriber Obstruction in LOS Satellite Subscriber Clear LOS Step 1

Pre-cautions  Reflector Installation Location : - Should be minimum 5 Meters away from Bare Electrical Lines ( Overhead / Side ) Should be easily accessible for Maintenance / Service Should not be accessible by Children / Pet Animals Should be such that Rain / Water Drainage from Roof never hit the Reflector Should not be in the Passage Should not be in Damp Area Always Prefer wall Mount option for Reflector Assembly Never Install Reflector Assembly on Water Tank or wall of the Water Tank Step 1

Also Consider below mentioned points during Site Selection (continued….) Minimum 15 cm Distance should be maintained between corner edge of the wall & hole to be drilled Thickness of the Wall should be more than1.5 times of Fastener Length Reflector should never be Installed directly on the Roof In case of Floor Mounting Reflector Should be installed on the Flat concrete base of below mentioned Specification 50 cm 30 cm Flat Surface

Also Consider below mentioned points during Site Selection (continued….) Step 1 Check for conceal electric cables with Line Detector Minimum 7 cm distance should be maintained between Electric Cable & Hole to be drilled Ensure that Water Line, Gas Pipe, Other Cables / Customer Property does not damage while drilling

Step 1 Cable Length should be minimum from Reflector to STB Cable Should be routed with minimum number of drill holes Location selected for STB should have proper air circulation Select two most suitable locations for Reflector Installation Take Customer Permission for Reflector Installation at best suitable location Cable Length should be minimum Reflector STB

Always prefer Wall Mount as a Mounting option For Wall mount “Indicated hole” on Foot Mount should be towards ground as shown above For Floor mount MAST top portion should be in opposite direction of the “Indicated hole” on Foot Mount Wall Mount Mast Top portion direction towards SKY Indicated Hole on Foot Mount direction towards GROUND Floor Mount Indicated hole should be in opposite direction of MAST Top portion Mast Top portion direction towards SKY Step 2

Align Foot Mount at 90 Degree After Alignment of Foot Mount, Mark 4 holes for drilling Align Foot Mount at 90 degree with respect to ground by using Spirit level meter Bubble in Center Foot Mount Spirit Level Mark holes for Drilling Foot Mount should be installed on Flat ( Plane ) surface during Floor Mounting. Step 3

Step 4 Self Lockable Chuck Speed variation switch Take Customer permission before drilling Clean Drill machine & Drill bits Set Drilling mode according to Wall Check Drill bit size according to Bolt diameter Drill Machine should be in “OFF” mode while selecting mode, inserting Drill bit or adjusting Guide Rod. Always wear Safety goggle while drilling & blowing dust from hole

Step 4 Hold the drill machine with both hands while drilling Put forwards the left leg ( for a Right handed Person ) with the right index finger on Speed Control Switch, Hold the handle with Left Hand – vice versa for Left Handed person Hold the Drill Machine Horizontally & Drill hole perpendicular to the Wall Slowly increase the speed by speed control switch Safety Precautions : - Don’t let drill stop while the bit is still inside the hole (If the drill is stuck in the hole, reverse the direction of rotation & slowly pull out the drill bit) Don’t change the rotation direction with the switch while the drill machine is ON Don’t lean on Drill Machine while drilling Use Drill Machine with Safety Precautions to avoid injury

Step 4 Drill the hole diagonally & Re-check Foot Mount at 90 o before drilling second hole.  Blow the dust from drilled holes  Do not breathe while blowing dust. Dust Blower Ensure the Drill Machine is Switched “OFF” immediately after drilling of holes

Step 5 Fix Plastic Bush inside the hole Plastic Bushes Always use Plastic Bush recommended by Company

Step 5  Tighten Bolts diagonally Check Foot Mount 90 o with respect to ground

Step 6 Nuts & Bolts A B C

Step 7  Keep these bolts slightly loose for Final Elevation alignment Antenna Bracket + MAST Bracket

Step 8  Always tighten Bolts diagonally  Reflector surface should not deform or damage while handling Reflector Nuts & Bolts

Step 9 LNBF + LNBF Clamp Keep these bolts slightly loose for Final SKEW alignment

Step 10

Take extreme care while working with LNBF Arm, It should not be Damaged / De-formed

Step 11 Adjust approximate SKEW as per division marking available on LNBF Clock wise rotation for negative polarisation angle Rotate LNBF clock wise from LNBF connector for negative (-) Polarisation angle. Rotate LNBF Anti clock wise from LNBF connector for Positive (+) Polarisation angle. For example : If SKEW angel is “- 23 degree” 1 Division = 5 Degree Division marking for LNBF rotation = 23 / 5 = 4.6 Align “0” mark of LNBF clamp with approx. 4.6 division (Clockwise) on LNBF.

Step 12 Assemble Reflector Assembly on Mount Assembly

Step 12 Aligning ElevationAligning Azimuth The vertical movement of Reflector to track the satellite is called Elevation Adjustment. ElevationAzimuth The horizontal movement of Reflector to track the satellite is called Azimuth Adjustment.

Step 13 Sat Meter should be switched “OFF” before connecting First connect service cable with LNBF After that Connect other end of service cable with Sat Meter Connecting Service Cable with LNBF Connecting with Sat Meter

Step 14 1-Connect a test cable from LNBF to the hand held signal level meter. 2-Swith on the meter confirm that audio is enabled. 3.Select the desired satellite on the menu i.e. any of tps of SUN DIRECT TV 5. Approximately try to adjust the azimuth & elevation of the antenna towards the direction of the desired satellite, in our case INSAT4B at 93.5degs. 4. A long beep will be heard

Step 14 To counteract Rain fade/ adverse weather condition, Tracking should be done in such a way to achieve below mentioned parameters for all the Transponders.  MER : More than 12 dB  Signal Strength : More than 77dBuV All the Nut, Bolt & Screws should be properly tightened ( Neither Loose nor Over tightened ) after Peak Tracking. The signal Parameters should not change during tightening of Nut, Bolt & Screws

Step 14 After Peak Tracking, Switch “OFF” Sat Meter, remove Service Cable & keep Sat Meter at safe place After tightening all Nut, Bolt & screws mark the Azimuth & Elevation Adjustment with Permanent marker

Step 15 Tighten all bolts & nuts Remove the service cable from LNBF connect the decoder cable - Remember to leave one loop service cable for maintenance. Now the ODU installation is complete Use Cable tie