April 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE 19903 800-652-5600.

Slides:



Advertisements
Similar presentations
Updating your profile. Why Fill out your profile? Taking a few moments to fill out your volunteer profile will enhance your overall experience with your.
Advertisements

Between Nevada and Arizona
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
November 2010 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
December 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
October 2010 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
ENG-1010 Lecture 16 Bridge Design.
January 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Logging In Go to web site:
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
May 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Technical Innovations in Bridge Components Bengal Club, November 17 th, 2009.
March 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Monitoring Structural Response to Earthquakes using Wireless Sensor Networks Judith Mitrani June 18, 2002.
June 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
 This link is about how measuring stress has changed over the years to the present day.  These strain gauges are use to measure the amount of stress.
Dr. Curtis Banks Mentor EV-43 Harvesting Environmental White Noise to Perform Structural Health Monitoring with Fiber Bragg Grating Sensors Justin Colar.
October 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Concrete Construction
Warning Severe Storm Alert!!! Table of Contents Click the lightening bolt to find out about the different types of severe weather that we will be learning.
The DSLR Camera. Basic Parts Shutter Release Button/ On/Off Button Lens Zoom Adjustment Focus Adjustment Lens Release Button Mode Dial Flash Hot Shoe.
Suspension Bridge Design
Golden Gate Bridge By: Amy Nguyen and Heather Hernandez.
St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.
News Campus Wick Community Campus Newsletter Issue 4March/ April 2015 Meet the Team Alan Shearer: Gateman. Alan joined Morrison construction in March,
Lesson: Observing Monsoon Weather Patterns with TRMM Data
Methods: To assess the impact each removal method had on the corrosive resistant coating, each of the twelve plates were broken down into four zones, one.
December 2010 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Mobile Video Systems Presents: Digital Eye Trans Cam 3/4G Live View vehicle camera system.
Earth, Sun, and Moon By: Shannon Cook and Elissa Davis.
INSPECTION OF PRESTRESSED CONCRETE ROAD BRIDGES BY ULTRASOUND 3D TOMOGRAPHER SYSTEM Eng. Guy Rapaport Infrastructure & Transport, Finland.
Introduction to a pit installation
September 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
What Kind of Bridge?.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
district22.rto-ero.org When you get to this website you will see a setup that will be changing in the 2016 year. At present you can now navigate from.
Photo Story 3 Importing Pictures. When you create a new Photo Story, the first thing that you will do is import pictures. You can import pictures from.
Go to your school’s web locker site school name.schoolweblockers.com) Your user name is the first letter of your first name, the first 4.
A swinging cable and wooden plank bridge in a New Zealand rain forest.
Back to School Night Welcome to 4 th Grade Miss Blair Rutherford Elem
Have you ever seen Scientists using “Mockups” of larger things? Why do they do that?
Pulse of the Planet Series Dr. David A. Robinson Chair, Department of Geography & New Jersey State Climatologist Rutgers University September 22, 2007.
By Ms. McKalpain for her classroom. Water is something everyone needs. But when there is too much, or too little, we can run into BIG problems!
A Guide to Your Volunteer Connection Account. Access Volunteer Connection Visit or navigate to Volunteer Connection.
Utilizing Your Class Site Class Website Guide by Kimberlee Fulbright.
November 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Bridges AIM.
The 3X5 Flexible Lesson Planning System “How to” Presentation.
Multiplication Level 1 (Facts 0-2) Read These Instructions:  Try to get the answer before the computer puts it on the screen.  Do not click on your.
Multiplication Level 2 (facts 0-2, 5, 9) Read These Instructions:  Try to get the answer before the computer puts it on the screen.  Do not click on.
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
Congratulations on installing Let’s take a quick tour of the main features.
Welcome Teachers! - WELCOME TO TEACHER WEBSITE BUILDING 101.
This is a brief introduction to using the FAMIS Self Service Web Site: How and where to access the web site What is available on the Web Site Overview.
Personal Branding. Objectives How do you see yourself? How do others see you? What is your personal brand?
Bridges and Loads Modified by Matthew Silbernagel.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
The Hoover Dam The dam was started in 1931 and used enough concrete to build a road from New York to San Francisco. The stretch of water it created, Lake.
Weathering and Erosion Review
4 Causes of Damaged or Failed Speedometer in the Car
Insert District / School / Class Name
Figure A Figure B 12/07/2006 Rev B
Comic Life in the Classroom
The London Environmental Network Volunteer Recruitment Workshop
Presentation transcript:

April 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE or

April 2011 Newsletter

This Month’s Featured Guest Harry “Tripp” Shenton, III Department Chair, University of Delaware In this month’s issue of Building for Tomorrow, we’ll be looking at something that will not be visible once the new Indian River Inlet Bridge is finished: sensors. You may be wondering why a bridge would need sensors, but they play a very important role in monitoring any changes that may occur with the bridge. These changes can be caused by a lot of different factors like wind, rain, ice, and many others. Each of these factors cause minor changes in the bridge, changes that would not be noticeable to us, but are easily identified by the sensors on the bridge. This month’s featured guest is Harry “Tripp” Shenton, III, who is the Chair of the Department of Civil and Environmental Engineering at the University of Delaware (UD). UD is working on installing sensors all over the bridge. From wind sensors on the very top of the pylons to sensors that are embedded in the concrete, this new technology will provide a new and unique perspective of the bridge.

New Science For A New Bridge A state-of-the-art Structural Monitoring System is being installed on the new Indian River Inlet Bridge. When completed and operational, the system will provide DelDOT engineers with real-time data on how the bridge is performing, and will provide an early warning for potential problems before they get too severe. The monitoring system is like the one found on your car Cars have dozens of onboard sensors and multiple computers. The computers record information from the sensors and store it for later retrieval by your mechanic. The downloaded information tells them how your car is performing and if there are any problems. The warning lights on your dashboard provide immediate feedback to you when something is wrong. The monitoring system is a fiber-optic based network of over 100 sensors that are mounted to the bridge. This unique system transmits information/data by pulsed light down a very thin glass fiber. A University of Delaware graduate student installs cable between the sensors through the edge girder rebar cage prior to concrete being poured.

New Science For A New Bridge Sensors of various types are placed strategically on the bridge and are connected to a central computer that is located off site. Readings will be taken periodically and also during high wind events, like Nor’easters or hurricanes. By analyzing the data, engineers can better understand how the bridge is reacting to and enduring the various environmental and weather conditions. Structural monitoring is an emerging new concept in bridge engineering. Systems have been installed on a number of existing older bridges in the U.S., and a few new bridges in Asia and Europe. This is the first permanent structural monitoring system to be installed on a cable supported bridge in the U.S. Fiber Optic strain sensor installed on the bridge pylon rebar during construction.

What Do They Look Like?: The Monitors and Sensors on the New Bridge Accelerometer: These are mounted to the bridge surface to measure movement and vibration in the deck, pylons, and cable stays. Displacement Transducer: These measure large scale horizontal movement of the bridge as it expands and contracts with temperature changes.

What Do They Look Like?: The Monitors and Sensors on the New Bridge Tilt Meter: These are mounted to the surface of the bridge to measure the tilt or change in angle of the deck and pylons. Chloride Sensor: These are embedded in the roadway and measure the concentration of chloride ions from road salt and ocean spray in the concrete, which can cause reinforcing steel (rebar) to corrode if it is exposed.

What Do They Look Like?: The Monitors and Sensors on the New Bridge Chloride Sensor Installed: These are installed on the reinforcing steel before it is covered with concrete. Strain Gauge: These are embedded in the edge girders and pylons, and measure localized, small-scale displacement and deformation.

What Do They Look Like?: The Monitors and Sensors on the New Bridge Strain Sensor Installed: These are installed on the reinforcing steel of the edge girder before it is covered with concrete. Fiber Optic Data Acquisition: Testing equipment for the sensors that are being installed.

Visit the Bridge! Do you want to take a tour at the site of the new Indian River Inlet Bridge You can sign up your class or group to take a tour by clicking on the link below! Click Here to Sign Up!

Facts About the Sensors and Where They Are on the Bridge Total Number of Sensors on the Bridge: 225 Miles of Fiber Optic Cable on the Bridge: 2 Stay Accelerator Wind Speed & Direction Deck Strain Tilt Chloride

A Moment of Bridge History These photos from 1929 show the mouth of the Indian River Inlet as work was being done to it by the Army Corps of Engineers. As you can see in the note on the bottom picture, the Governor at the time, Clayton Douglass Buck, was taken across the inlet in the bucket pictured in the top picture. This was a great way to get a view of the work being done.

Employee Spotlight Gary Wenczel Where are you employed? University of Delaware; employed for 9 years What is your job title?: Project Manager Where are you from?: Hamilton, NJ Where do you live now?: Lancaster, PA What are some special skills that you bring to the project?: Bachelor of Applied Science from the University of Delaware. The program gave me a good all-around understanding of project management, which has been very helpful in my work here. What is your favorite part about working on this project?: Working with the people down here is great. They are very supportive and try to help you in any way possible. Also, everyday is something new, which lets me be creative.

Photos from the Job Site A view of the new Indian River Inlet Bridge from the waters of the Indian River Inlet. This photo was created by connecting two separate ones to show the two sides of the bridge that are under construction at the same time (Skanska USA Civil Southeast).

Workers at the new Indian River Inlet Bridge test batches of concrete prior to scheduled pours on the site (Skanska USA Civil Southeast). Photos from the Job Site Excess cable is visible from the bottom of the bridge as the stay cables are locked into place in their anchor boxes (Skanska USA Civil Southeast).