Water and Sanitation Issues in Azerbaijan and Measures directed to Enhancement of Equitable Access to Water _______________________ Presented by Dr. Rafig.

Slides:



Advertisements
Similar presentations
Rudolf Frauendorfer Asian Development Bank
Advertisements

JOINT EVALUATION UNIT – April Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main.
Water policy development in Uganda
Communal services in Tajikistan: A poverty and social impact assessment C. Stephen Lam Almaty, Kazakhstan 13 April 2011.
Investing in the Cascading Forecasting Process in Modernizing National Meteorological and Hydrological Services WB & WMO.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
23-25 September 2013 Bucharest Sector policies, institutions and governance Moldova National Association of Water and Sanitation Utilities (Moldova Ap.
Hydropower Development: Experience of Nepal
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
„Extension and modernization of water and wastewater infrastructure in Arad County”
STATE OF URBAN WATER SUPPLY & SANITATION SECTOR IN SINDH By Khalid M. Siddiqui DG UP&SP Sindh.
1 EECCA-wide trends of water utility performance Tatiana Efimova Helsinki, May 2007 E A P TASK FORCE.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
WATER ISSUES IN THE EASTERN EUROPE:
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
IWRM as a Tool for Adaptation to Climate Change
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
ASEAN WORKING GROUP ON WATER RESOURCES MANAGEMENT (AWGWRM)
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
Water Supply & Sanitation in Rural Armenia Armenian Women for Health and Healthy Environment Elena Manvelyan, MD. PhD Workshop on equitable access to water.
MONGOLIA MONGOLIA Urban Sector Operation 4 June 2014 Tuul Badarch, Senior Project Officer (Infrastructure) Mongolia Resident Mission Asian Development.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
The European Union Water Initiative in the EECCA countries: Recent Developments Nicola Di Pietrantonio Neighbourhood Directorate European Commission Bishkek,
Arab Water Council الـمـجـلـس الـعـربـى للـمـياه A r a b W a t e r C o u n c i l 5 th World Water Forum Istanbul, March 2009 The Arab Region The.
14/10/2015European Agency for Reconstruction1 Water & environment.
Kyrgyzstan priorities in environment protection B. Tolongutov, Director, State Regulation Center on Environment Protection & Ecological Safety Sector State.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
ASEAN WORKING GROUP ON WATER RESOURCES MANAGEMENT (AWGWRM) Presentation On “Action Plans And Strategies Related to IWRM in ASEAN Countries” - MONITORING.
16 th meeting of the EUWI EECCA Working Group Impacts of climate change on water resources in Moldova and possible adaptation measures. Trans-boundary.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Opportunities and Challenges of Water Resources Management in Lao PDR
National Information Communication Technologies Strategy Vasif Khalafov “National strategy” working group - Web -
The Reforms In The WSS Sector In Bulgaria Eng. Ivan Ivanov President Bulgarian Water Association.
1 Jakarta, May 12, 2009 OPENING AND KEYNOTE SPEECH MINISTER OF PUBLIC WORKS REPUBLIC OF INDONESIA MINISTRY OF PUBLIC WORKS INDONESIAN-DANISH WATER DAYS.
INFRASTRUCTURE AND HUMAN SETTLEMENTS Presentation by Delegation of the European Union Consultative Group Meeting Technical Session La Palm, Accra, 23/09/2010.
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
Cost recovery study for the Seine Normandie RBMP.
THE JOURNEY: EVOLUTION OF WATER AND SANITATION SECTOR MANAGEMENT IN MALAYSIA.
INCREASING THE DIALOGUE BETWEEN SCIENTISTS, POLICY MAKERS AND STAKEHOLDERS SUBERNAREKHA RIVER BASIN, INDIA SOCIO-ECONOMIC ISSUES AND POLICY OPTIONS RAMESH.
The Azerbaijani Republic The Ministry of Ecology and Natural Resources WATER RESOURCES OF AZERBAIJAN, THEIR MANAGEMENT AND BILATERAL AGREEMENTS Matanat.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Strategy of economic and social development of St. Petersburg until 2030 Committee for Economic Policy and Strategic Planning of St. Petersburg
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Water & Environment Sector Overview of 2016/17 Grant and Budget Guidelines Ministry of Water and Environment.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Collection and use of data on Water Abstraction and Use in Georgia Mariam Makarova, Head of Water Resources Management Division, Ministry of Environment.
Decision-making on the reform of urban water services in Ukraine
Water Charge Instruments for Environmental Management in Latin America: from Theoretical to Practical Issues Mexico Country Case Lilian SAADE HAZIN and.
National Administration “Romanian Waters” NARW Bucharest - Romania
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
«Water Sector Reform in Kenya »
Potable Water and Waste Water
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Republic of Kazakhstan Priority Issues in 7 Major River Basins
The UBSUP/SafiSan Programme
IMPLEMENTATION OF ARTICLE 9
Guatemala Water Management Country Status Factsheet
WATER & WASTEWATER PUNJAB, PAKISTAN
Presentation transcript:

Water and Sanitation Issues in Azerbaijan and Measures directed to Enhancement of Equitable Access to Water _______________________ Presented by Dr. Rafig Verdiyev, Azerbaijan _______________________________________________ Address: 36, Huseynbala Aliyev str. Apt. 52, 3-rd Microdistrict, Baku, Azerbaijan, Tel , http//

Water Resources Total water resources of Azerbaijan rivers make up 31.5 km 3. Kura is major transboundary river. Total water resources of the Kura river are 26.6 km 3 Only 25-30% of total water resources of rivers is formed within the Azerbaijan Republic.

Water provision As a water poor region, water supply over the Azerbaijan Republic territory makes up about 100 thousand m 3 / km 2. The quotient amounts to an average of about 1 thousand m 3 of water per person per year Water resources of the Republic are distributed very irregularly over administrative districts. Absheron and Kura-Araz lowlands are the most water poor regions. During the period of vegetation the river run-off amounts is only 10-20% of the annual amounts

Map of Azerbaijan Republic

Water use Together waiter losses from the channel (river-bed) of Kura river lower course, in Azerbaijan Republic water resources o at present is less than natural ones by 30 %. About 11.5 cubic km of water was used in Azerbaijan in 2005(16.4 in 1993)in total ( which makes 1.3 cub m per capita) is being used for different purposes. Of which % goes to agriculture, 20-25% to economy and the rest for water supply of cities and other residential areas. Water losses makes up-3-4 Cub km. At present water resources of Kura and Ganikh in Georgia and water resources of Araz in Turkey, Iran and Armenia are decreased by 20% as a result of water intake.

Change of Water Resources of Azerbaijan during last 15 years

Climate change impact to water resources Climate change impact to river’s run-off amounts and their annual distribution is estimated; During last 15 years air temperatures has increased by up to 0.5C that also lead to decrease of water resources Change of air temperature and precipitation was estimated by climate change scenarios GISS and GFDL-3( Increase of annual air temperature by ) By all models from 10 to 20% decrease of water resources of the river is expected

CC impact to Environmental flow River- Station Monthly environmental flow, cub. m/sec. Ann- ual Kura- Salyan Actual(Obs erved) Kura- Salyan by GISS

Water balance of Azerbaijan Components of the balance Existing mln. m 3 Expected, mln. m 3 T=2 0 C, dR=0 GISSGFDL-3 Water Use Water losses Water use and losses together Existing surface waters Use of water from trans- boundary river Samur 1000 Water deficit

Adaptation measures Needed measures of adaptation Existing mln. m 3 Expected, mln. m 3 T=2 0 C, dR=0 GISSGFDL-3 1. Water deficit Ground waters available for yearly exploitation Economy of water in result of reconstruction of water supply network Cleaning of about 4 40% of polluted waters Decrease of deficit in result of measures

From all volumes of water supplied to the city of Baku annually (16 cub. m/sec) the purest are waters of Khachmaz and Shollar lines (about 4 cub. m/sec). Water from Djeiranbatan water intake (Samur-Absheron canal) is also of good quality (7.5 cub. m/sec) Water taken from Kura river is more polluted. The available system enables to conduct settlement, filtration and chlorination of water before it enters the distribution network. About 1.7 cub km of ground waters ( 20% of the total) annually is used for water supply to provincial towns and rural areas. Government is implementing Oguz Gabala Baku water pipeline project (5 cub. m/sec) Drinking Water Sources

WATER ISSUES Main source of water supply, including drinking water is Kura river, pollution of which is major problem. Only few o f towns and regional centers of the republic are equipped with treatment facilities, which are totally deteriorated and perform only mechanical treatment of wastewater. Due to unsatisfactory performance of treatment facilities all three countries of the basin, discharge polluted wastewaters into the Kura river and its tributaries. Concentration of heavy metals (copper, nickel, chrome, etc.) in natural waters exceeds allowable concentrations. Due to lack of water supply network, and its bad condition, water losses reach 50% Many water transmission and distribution pipes, which are made of unprotected steel, are now over 40 years old. The rate of pipe breakages in cities is high (5-10 times higher than in Western Europe).

Water-supply coverage Connected to water supply % Baku 95 Sumgayit, Ganja 95 Secondary cities 83 Rural areas 11 Source: World Bank. Azerbaijan Water Supply and Sanitation Sector Review and Strategy.2000.

Waste water coverage The waste - water network in Baku serves about 72 % of the city, but only about 50 % of the waste water is treated; 90 %- biologically and only 10 %- mechanically. In other urban areas in the country, the coverage drops up to 32 %. There are waste - water treatment plants in 16 cities and towns; most are partly or completely out of operation. In rural areas, on-site sanitation is used, primarily latrines. _______________________________________________ Source:Azersy

Urban and Rural Sanitation in Azerbaijan ( by WHO / UNICEF, 2000 ) Sanitation UrbanRuralTotal Flush to sewage system/ septic tank Pour flush latrine Improved pit latrine Traditional pit latrine Open pit Basket Other No facility/bush/field % pit latrine estimated to be improved Improved sanitation

Measures for enhancement of Equitable Access to Water Measures to improve water provision for the population are as followings: Legal –Institutional improvement Improvement of the drinking water and sanitation infrastructure Use of additional sources of safe drinking water

Measures for enhancement of Equitable Access to Water This includes adopted by the government Legislation, programs and institutions Since independence many water related legislation and state programs have been developed Drinking water supply institutes reform in accordance with international requirements

Measures for enhancement of Equitable Access to Water Use of additional sources of safe drinking water: For improvement of water supply for large Baku, safe drinking water sources of Oguz– Gabala will be used in started state project. Capacity of water supply will be about 5cub.m/sec Other different projects in regions of the country are also considering use of new sources of safe surface and ground water

Measures for enhancement of Equitable Access to Water Improvement of the drinking water and sanitation infrastructure Many projects by government and donor organizations in Greater baku and rural areas of Azerbaijan are directed at: Improvement of water supply system Improvement of drinking water treatment system Improvement of Sanitation system

Water Policy in Azerbaijan Water policy is mainly undertaking through water legislation, particularly, through Water Code - basic legislative act of the country regulating water sector. Based on Code, several Laws, and number of bylaws were adopted. Particularly: Law on Water Supply and Wastewaters, Law on Melioration and Irrigation, Law on Municipal Water Economies,

State Programs Water Policy of the country is also implemented through National Plans, State Programs and Action Plans By the end of 1996, Government of Azerbaijan with support of World Bank, developed National environmental Action Plan, which highlights importance of water resources management and protection. In 2006 by decree of president the State Program on improvement of ecological situation in Azerbaijan has been adopted

State Programs On February 18, 2003, Government of republic of Azerbaijan adopted National Program for Sustainable Socio-Economic Development of the Country in the environmental context One section of the Program is fully dedicated to the Water Policy issues. According to National Program, by 2010, every person in the country shall have the access to the quality water. Program implies development of special program for rational use of water resources, encourages application of incentives for rational use, improvement of drinking water quality, revision of laws regulating activities concerned with ecosystems, protection of transboundary rivers from pollution, and involving riparian countries in rational use of water resources.

State Programs There are several programs on socio-economic development in the country: State Program on Poverty Reduction and economical Development of the Country for (February 20, 2003); State Program on Socio-Economic Development of Regions of Republic of Azerbaijan for (February 11, 2004); - - State Program on Tourism Development in Azerbaijan for (August 27, 2002). All these Programs pay special attention to water issues.

Water Agencies The following major Agencies are dealing with the issues of water resources management in Azerbaijan:  Ministry of Ecology and Natural Resources;  Amelioration and Water Economy JSC Azersu JSC

“ Azersy” Joint-Stock Company: Before 11 July 2004 the issues of water supply of the cities of Baku and Sumgait were managed by Absheron Joint-Stock Company. In July 2004 the water supply and sewerage services of other regions of the country were also given to this Company and the “Azersu” Joint-Stock Company has been created. The basic function of “Azersu” is operation and rehabilitation of water supply and sewerage systems.

Drinking Water tariffs “Azersu” JSC in 2004 established different tariffs on the use of water by residents, budget organizations and in industry (0.04 USD/m3, 0.20 USD/m3 and 0.5 USD/m3 respectively). Owing to economic problems, lower tariffs were set for population (realistic tariffs are close to USD/m3 manats/m3). The collection of bills was 63.1% in Water meter installed till 2007: units For refugees fees are paid by the State Committee on Refugees Unaccounted for water in secondary towns reach 80%(ADB 2004)

New Drinking Water tariffs(2007) According to the decision of the Tariff Council: The cost of 1 cu.m of water is AZN 0.18 for population of Baku, Sumgait, Ganja, Khirdalan, Mingachevir, Ali Bayramli and Apsheron Peninsula, and AZN 0.70 for remaining consumers. In other regions of Azerbaijan, the residential consumer will pay AZN 0.14 and other consumers AZN However, if the water is used as a raw material, the water will be AZN 12 per cu.m. The increase also dealt with the sewerage services for the population of Baku, Sumgait, Ganja, Khirdalan, Mingachevir, Ali Bayramli and Apsheron peninsula. The population will pay AZN 0.04 for the 1 cu.m of the waste water and other users AZN In other regions, population will pay AZN 0.03 and other users AZN 0.20.

The National Water Supply and Sanitation Project Project is financed by WB in the amount of US$230m Envisages possibility of provision of safe, reliable and sustainable water supply and improvement of sanitation systems (WSS) in 20 Rayon of Azerbaijan, including -10 Rayons (1st phase) up to 2008, and 10 Rayons (2nd phase) up to It is shown that: Water supply and sanitation sector in Azerbaijan is characterized by institutional weakness, unsatisfactory work, obsolete and half destroyed physical infrastructure and big financial constraints. As a result, water treatment plants do not operate normally in majority of regions, due to physically obsolete condition of water supply networks, water losses reach 25-50%, not all subscribers are provided with network, and those subscribers, who are provided, are supplied by water during hours per day. Sanitation system is not available in majority of regions, waste water is discharged without treatment to environment-water sources, relief, topsoils (from sewers –to sanitation wells).

The National Water Supply and Sanitation Project Objectives of the project: improve water supply by rehabilitation and improvement of existing networks, to treat water supplied to network according to existing standards, to provide subscribers with water meters for regulation of water use; protect urban areas covered by the project from potential negative impact on surface and underground water sources, to install and rehabilitate selected sewage systems required for health and environmental needs; institutional strengthening for efficient management of potable water provision and waste water. Realization of the project will positively effect on environmental safety, economic, social development and health of population; will put the basis for correspondence to legislative requirements

The National Water Supply and Sanitation Project Major project activities: (i)rehabilitation and extension of water supply and sewerage systems in twenty rayons; (ii) construction of wastewater and septic sludge treatment facilities; (iii)preparation of an urban Master Plan for the Baku area and updating the Water Supply and Wastewater Master Plan; and (iv)development and implementation of an Institutional Development Plan (IDP) for Azersu and its subsidiary companies, to improve the efficiency and sustainability of WSS services (including implementing a meter- reading/billing/collection system and a financial restructuring and recovery plan; implementing a demand- management program, improved technical and financial monitoring performance, etc.

ADB Supported projects Through a project supported by the Asian Development Bank (ADB), the Government of the Republic of Azerbaijan will improve the quality, reliability, and sustainability of water supply and sanitation (WSS) services in the towns of Goychay, Agdash and Nakhchivan by The project consists of two components: Infrastructure development: The construction of new and efficient distribution systems for Goychay and Agdash, and rehabilitation of the Nakhchivan system Institutional development: Promoting institutional reform and capacity building through private sector participation, the establishment of joint stock companies (JSCs) in each of the towns and community involvement through water user associations.

ADB Supported projects ADP project will ultimately benefit 147,000 people in Goychay, Agdash, and Nakhchivan, providing access to adequate potable water at low costs by 2010 through WSS improvements and new infrastructure. These include: New well fields to replace nonfunctioning ones, including those destroyed by floods New pipe systems, elevated reservoirs, and chlorinating facilities to replace the existing water distribution system New main and branch sewers, sewerage pumping stations, and waste stabilization ponds Institutional reform in Azerbaijan's WSS sector will begin with replacing the state-owned and operated SuKanals with open-type, JSCs in each of the project towns.

KfW Supported projects With KfW support, a joint venture between the SuKanal and BerlinWasser International was established in 2001 in the secondary town of Imishly. A KfW loan, supplemented by a SECO grant, is directed for rehabilitation of WSS systems and establishment of new JSCs in the larger secondary towns of Ganja and Sheki. Coordination was close with the KfW-SECO team during project preparation, to ensure consistency in institutional approaches and a coordinated policy approach with the Government.

WB Supported projects GREATER BAKU WATER SUPPLY REHABILITATION PROJECT (LOAN / CREDIT IN THE AMOUNT OF US$ MILLION 65.99, during ). Pre project info: The Greater Baku area, which covers the city and its environs is not just the political capital, but also the economic, industrial and cultural center of Azerbaijan. By 1993 more than two thirds of the urban population, or about 2.5 million people, were concentrated in this area. Thus although as a result of the Soviet legacy about 95 percent of households were connected to the piped water network in Baku, the quality of services had declined significantly at the time the project was appraised On average water was available to individual families for only 22 days per month, for a maximum of 11 hours a day (In some areas households were limited to less than 6 hours of piped water a day)

WB Supported projects GREATER BAKU WATER SUPPLY REHABILITATION PROJECT The poor quality of services was exacerbated by the lack of equipment, tools and spare parts, and the poor organizational and operating methods that were in place at the time. The water treatment plants serving the city were in serious need of repair and rehabilitation, and the distribution pipe network was badly corroded and in poor structural condition. In 1993 alone, almost 3500 leaks and bursts were attended to on the 2500 km long network in the city, and unaccounted for water was estimated at between percent. Sewerage service levels were even lower than those for water supply, with only about a third of the population having access to a sewerage connection. Existing facilities were also in poor condition and most sewage was discharged untreated into the environment.

WB Supported projects GREATER BAKU WATER SUPPLY REHABILITATION PROJECT The primary objectives of the Project were: (a) to make emergency short term improvements in the water supply system to restore the water supply to Baku, in particular to the poorer elements of the population; (b) to improve the water supply system as a whole; and (c) to provide the basis for longer term planning and recovery.

WB Supported projects GREATER BAKU WATER SUPPLY REHABILITATION PROJECT Beneficiaries: The main beneficiaries of the project were the population of the Greater Baku area, including the poor, who would all receive improved water supply services as a result of the improvements made under the operation. This would result in significant benefits in terms of convenience and savings on the costs of coping measures such as investment in storage tanks and water purification measures to deal with the poor services. The households in the Greater Baku area spent about 17 times more on coping measures for the poor quality of water supply services that they were receiving at the time than on the cost of their monthly water bills. The poor, who spent an average of about 7 percent of their income on water compared to the non poor who spent an average of 2 percent, were particularly vulnerable.

WB Supported projects GREATER BAKU WATER SUPPLY REHABILITATION PROJECT Beneficiaries: However, the poor benefited from the increase in hours of supply from 6 to 13 hours (on average), with some areas moving up to 24 hours of supply. The poor also benefited from the improvements in water quality which met WHO standards at the end of the project. The Government is committed to ensuring that affordable services are provided to all its population, including the poor. The Bank is assisting the Government, through its ongoing policy dialogue and investment projects, to develop a social assistance program to mitigate the impact of sector reforms, including measures such as possible tariff increases on the poor.

WB Supported projects GREATER BAKU WATER SUPPLY REHABILITATION PROJECT The performance indicators: (i) Improvement in hours ofs ervice from the pre-project average of 6 hours/day to an average of 12 hours/day by the end of the project; (ii) Reduction in unaccounted for water (UFW) from the pre- project level of 66 percent to 365percent by the end of the project; (iii) Improvement in water quality and water pressure by the end of the project; (iv) Adjustment of residential and industrial water tariffs as necessary to cover operating costs; (v) Change in the billing system from flat to metered rate is occurring; (vi) Reduction in the ratio of employees per thousand service connection or households; and (vii) Institutional improvement

Decree of the President of AR, June 21,2007, on measures on improvement of access of public to safe drinking water, during The program on portable water provision of population of 100 villages using Kura and Araz rivers as drinking water will be implemented by the MoE and water supply system then transferred to municipalities. Main aim is to provide access people there to safe drinking water For work in 2007, 3 Mln AZN will be allocated by the Government. People of villages, without access to safe drinking water will get water treated by modern filters Pipelines,tanks, treatment facilities and taps will be installed; Municipalities will be operating the water supply system, where social position of population also will be taken into consideration when developing of tariffs

How above measures enhance Equitable Access to Water ? Existing tariff system by Azersy doesn’t consider special direct measures for enhancement of equitable access to water, however: By the relevant provision social support to low income people and families is provided by the government under different social programs The State Committee on refugees pay bills for refuges Program on provision of 100 villages of Azerbaijan by the MoE and municipalities supposes provision of equitable access to water, mainly is directed to people who can’t afford use of safe water sources.

How above measures enhance Equitable Access to Water ? improvement of water supply conditions by all above projects finally lead to improvement of reliable access to safe water. Decrease of water losses, in combination with installation of water meters finally will allow to decrease payment for water per capita (from 600 litre per capita now to 200 litre) Installing water meters is also supposed to play an important role in this sphere. improve Existing Improvement of quality of water supply decreases of percentage of expenditure of low income population to water and sanitation

Sources of Information MoE: USAID: NATO: Azersu: ECORES:

Thank You!