Quality control of LHC electrical interconnections to be produced during the 2009 shutdown Since the functional properties of the LHC electrical interconnections.

Slides:



Advertisements
Similar presentations
Statistical Control Charts
Advertisements

Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
Introduction to (SMAW) Shielded Metal Arc Welding
Welding Methods and Procedures
Solid State Welding Processes
ME 388 – Applied Instrumentation Laboratory Temperature Measurement Lab.
Statistical Process Control Control charts Quality Quality is an old concept Artisan’s or craftsmen’s work characterised by qualities such as strength,
Sequence of QC steps for main bus bar splices Control of cables and stabiliser prior to connection by ICIT team Temperature control during soldering, visual.
Productive Maintenance
Chapter 5. Methods and Philosophy of Statistical Process Control
Weld Inspection Basics
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Hazard Analysis and Critical Control Points
Monitoring the Project
Manufacturing Processes
ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.
TWI Training & Examination Services EWF/IIW Diploma Course
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
CHAPTER 20: Total Quality Management to accompany Introduction to Business Statistics fourth edition, by Ronald M. Weiers Presentation by Priscilla Chaffe-Stengel.
Motor Testing (Motor Only)
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Quality Control Project Management Unit Credit Value : 4 Essential
LHC Splice Review, C. Scheuerlein, Local quality control of LHC electrical interconnections during the 2012 shutdown.
Module 8 | Slide 1 0f Personnel Basic Principles of GMP 9.
Welding over aluminium: a potential issue?  X-rays show no inacceptable defect on both samples. Further developments in collaboration with EN-MME (Welding,
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
Technology Department Second LHC Splices Review Review of actions from last review List of recommendations of the first review Status Category A.Various.
Chapter 16: Product Design and Manufacturing
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
EPPOG - LHC Machine LHC machine (and some outreach) Mike Lamont.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Project logo / LP logo EUROPEAN UNION GOVERNMENT OF ROMANIA SERBIAN GOVERNMENT Structural Funds Common borders. Common solutions. Romania – Republic.
1 Quality control of the LHC main interconnection splices before and after consolidation C. Scheuerlein and S. Heck 2 nd LHC splice review,
A QUALITY IMPROVEMENT TOOL
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Your Hospital’s Name Location Process Improvement: Name of your Improvement.
1 A. Verweij, TE-MPE. LHC Performance Workshop – Chamonix Feb 2010 Arjan Verweij TE-MPE - type of defects - FRESCA tests and validation of the code.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
P. P. Granieri 1,2, M. Breschi 3, M. Casali 3, L. Bottura 1 1 CERN, Geneva, CH 2 EPFL-LPAP, Swiss Federal Institute of Technology, Lausanne, CH 3 University.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Weather Cloud Detection
PROTECTION SHELLS TE-VSC.
First LHC Splice Review Introduction
Lessons learnt from CERN experience
RB and RQ shunted BusBar current carrying capacities
12 October 2009 RRB Plenary R.-D. Heuer
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Splices in 13 kA circuits status of an ongoing work just started
Consequences of warming-up a sector above 80 K
SMACC local splice quality control
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
BT1 SMV10 Stripline Failure
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
Troubleshooting & Repair
Presentation transcript:

Quality control of LHC electrical interconnections to be produced during the 2009 shutdown Since the functional properties of the LHC electrical interconnections can not be measured in-situ, Quality control (QC) must rely on visual and geometrical inspections, the analysis of production data, and in the case of 13 kA splices on ultrasonic tests. New are: An ultrasonic test will be performed for 100 % of the produced 13 kA splices. Temperature cycle data, recorded with an independent system (in addition to the temperature recording by inductive soldering machines) will be regularly analysed. Key process data (e.g. ultrasonic weld duration) will be analysed on-line for US weld process control. Thickness of all 13 kA splices will be measured and analysed with control charts. Photos of all 600 A and 13 kA splices will be taken. Whenever possible give operators tools in hand that they can control their work themselves. Quality assurance of the LHC electrical interconnections includes preparation work, e.g. electrical connection and disconnection before and after cold test and 13 kA cable stabilisation, in SMI2 and SMA18. C. Scheuerlein – LHC risk review,

Ultrasonic testing of main bus bar splices All main bus bar splices to be produced during the 2009 shutdown will be US tested [i] by a member of the electrical connections QC team. A good US test result indicates that some Sn-Ag alloy has melted during the splice production process. Cryodipoles 2334 and 2440 with defective inter-pole splices are a treasure for testing QC tools. 4 out of 4 US measurements performed on the two splices with very high contact resistance show bad US transmission, indicating lack of Sn-Ag solder between Cu U-piece and Cu-wedge. For all other splices tested so far during the 2009 shutdown, the US test gave 4 out of 4 good US signals. C. Scheuerlein – LHC risk review, [i] F. Caspers, T. Kroyer, J. Kulka, J.-P. Tock, L.R. Williams, LHC-PROJECT-Report-1032

US test of defective interpole splice in cryodipole 2334  US test clearly detects very bad splices as those found in dipoles 2334 and C. Scheuerlein – LHC risk review,

Analysis of production data recorded during inductive soldering An independent temperature recording system has been implemented in the inductive soldering process in order to record and analyse temperature cycle data for all 13 kA splices. Both teams performing inductive soldering of 13 kA splices have been equipped with a data logger that records the temperature cycles, measured with a K-type thermocouple that is clamped onto the upper Cu profile of the splice to be soldered. Analysis of temperature cycles is done to detect deviations from standard heating cycle, to make sure that the Sn-Ag melting temperature was exceeded and that no splice overheating occurred. C. Scheuerlein – LHC risk review,

Use of control charts for US welding process Monitor key process data (e.g. US weld duration) over time in order to observe changes in the US welding process (e.g. sonotrode usage or misalignment). A software for fast analysis of production data has been written by L. Deniau and will be implemented in the production process in order to stop the process in case of strong variations of process parameters. C. Scheuerlein – LHC risk review,

Qualification of processes, equipment and operators before production, and audits during production All operators performing the electrical interconnections, as well as the equipment used, are qualified through the production of test samples, which are characterised by contact resistance measurements (TE-CRG- Cryolab), tensile strength measurements and metallographic analysis (EN-MME-Metallurgy lab.). During production regular audits will be performed for testing the equipment and processes used to produce splices. C. Scheuerlein – LHC risk review,